...
Info | ||
---|---|---|
| ||
Use the "Copy" and "Move" options (available under the ..., top right of this page) to duplicate this template into your project wiki. |
Table of Contents | ||
---|---|---|
|
Overview
Project Name | Enter the name of the project |
---|---|
Target Release Name | Amsterdam |
Project Lifecycle State | Incubation |
Participating Company | Bell, Amdocs, AT&T, ZTE, Huawei |
Scope
What is this release trying to address?
ONAP Operations Manager will be used to efficiently Deploy, Manage, Operate the ONAP platform and its components (e.g. MSO, DCAE, SDC, etc.) and infrastructure (VMs, Containers). The OOM addresses the current lack of consistent platform-wide method in managing software components, their health, resiliency and other lifecycle management functions. With OOM, service providers will have a single dashboard/UI to deploy & un-deploy the entire (or partial) ONAP platform, view the different instances being managed and the state of each component, monitor actions that have been taken as part of a control loop (e.g., scale in-out, self-heal), and trigger other control actions like capacity augments across data centers.
In the Amsterdam release, OOM will be used to automatically deploy and re-deploy all ONAP platform components using containers technology, to monitor components state and to automatically heal broken platform components when required.
Use Cases
OOM functionality
Minimum Viable Product
...
functionality is platform wide and is therefore not directly tied to specific use cases. However the vFW use case will be used as the test bed for OOM.
Minimum Viable Product
- ONAP platform 1-click deployment using containers on kubernetes for all key components:
- onap-aai
- aai-service
- hbase
- model-loader-service
- onap-appc
- dbhost
- dgbuilder
- sdnctldb01
- sdnctldb02
- sdnhost
- onap-message-router
- dmaap
- global-kafka
- zookeeper
- onap-mso
- mariadb
- mso
- onap-policy
- brmsgw
- drools
- mariadb
- nexus
- pap
- pdp
- pypdp
- portalapps
- portaldb
- vnc-portal
- onap-robot
- robot
- onap-sdc
- sdc-be
- sdc-cs
- sdc-es
- sdc-fe
- sdc-kb
- onap-sdnc
- dbhost
- sdnc-dgbuilder
- sdnc-portal
- sdnctldb01
- sdnctldb02
- sdnhost
- onap-vid
- vid-mariadb
- vid-server
- AAF
- DCAE (old or new or both?)
- MSB
- Multi-VIM
- VFC
- CLI (Stretch)
- CLAMP (Stretch)
CCF- Holmes (Stretch)
- onap-aai
- Monitoring of platform containers, i.e. vFirewall demo on docker/kubernetes
- OOM Guidelines:
- Provide guidelines to the community teams for bringing components to oom/kubernetes (all component teams can bring themselves their components to OOM).
- Platform containers monitoring: provide visibility to the state of each components
- AutoPlatform components auto-healing mvp: auto-restart of platform containers when required - maybe requires on shutdown (may require a second level of policies on top of kubernetes to avoid infinite restarts.)
- Platform Configuration management to deploy on different environments
- Technical architecture & technology POCs for tools like Ansible, Chef, Cloudify for config managementstep 1 - Externalize platform parameters (remove hardcoded params
- Platform configuration parameters externalization to enable custom deployments (i.e. remove all hardcoded parameters).
- Critical parameters like openstack deployments and etc in an environment file.
- Need to Component-level configuration & version management: allow to easily change configurations and manage different versions of the configuration files for each component.
- Using configuration management to determine which component versions to deploy.
- Using config management to determine where to deploy each indivirual components across geographies (stretch)
- Anti-affinity Config management examples
- Platform configuration management examples/demos so that the community know
- knows how to use :
- oom. Would require 2 examples
- 1 would be for lab deployment
- 1 for a production deployment
step 2 - Automated config management (M2)
- Platform Upgradability:
- Teams must expose endpoints for rollbacks and ensure backward compability. We need to provide requirements to each component teams.
- Ability to deploy multiple instances of ONAP on different versions.
- Manage individual components versions - Ability to upgrade 1 component at the time.
- Running ONAP platform across different hosts (stretch)
- Running ONAP on different geographies (stretch)
- Collaboration
- Integration team: monitoring an end-to-end platform solution. Make the vFW demo managed by oom.
- MSB: Service registration and discovery is overlapping - need to be in MVP.
- Platform infrastructure & multi-deployment options support (TBD)
- Orchestrating infrastructure deployment and more deployment options with Cloudify - will determine if it is MVP or stretch or M2 scope. Maybe we lay the foundation in M1 Amsterdam and then grow.
Stretch goal
- ONAP platform 1-click deployment on kubernetes for additional components:
- CLI (Stretch)
- CLAMP (Stretch)
- Holmes (Stretch)
- Platform Configuration management - Scaled deployment
- Distributed platform deployment using config management to determine where to deploy each individual components across geographies (stretch)
- Advanced Multi-data-center platform deployment policies, e.g. applying anti-affinity rules for different components.
Out of scope
- Platform components/containers auto scaling of onap platform containers
...
- -scaling auto scaling
Functionalities
List the functionalities that this release is committing to deliver by providing a link to JIRA Epics and Stories. In the JIRA Priority field, specify the priority (either High, Medium, Low). The priority will be used in case de-scoping is required. Don't assign High priority to all functionalities.
Epics
Jira Legacy server System Jira columns key,summary,type,created,updated,due,assignee,reporter,priority,status,resolution maximumIssues 20 jqlQuery project=oom and issuetype in (epic) order by rank serverId 4733707d-2057-3a0f-ae5e-4fd8aff50176
Stories
Jira Legacy server System Jira columns key,summary,type,created,updated,due,assignee,reporter,priority,status,resolution maximumIssues 20 jqlQuery project=oom and issuetype in (story) order by rank serverId 4733707d-2057-3a0f-ae5e-4fd8aff50176
Longer term roadmap
...
ONAP Platform OOM (ONAP Operations Manager)will be used to efficiently Deploy, Manage, Operate the ONAP platform and its components (e.g. MSO, DCAE, SDC, etc.) and infrastructure (VMs, Containers). The OOM addresses the current lack of consistent platform-wide method in managing software components, their health, resiliency and other lifecycle management functions. With OOM, service providers will have a single dashboard/UI to deploy & un-deploy the entire (or partial) ONAP platform, view the different instances being managed and the state of each component, monitor actions that have been taken as part of a control loop (e.g., scale in-out, self-heal), and trigger other control actions like capacity augments across data centers.
The primary benefits of this approach are as follows:
- Flexible Platform Deployment - While current ONAP deployment automation enables the entire ONAP to be created, more flexibility is needed to support the dynamic nature of getting ONAP instantiated, tested and operational. Specifically, we need the capability to repeatedly deploy, un-deploy, and make changes onto different environments (dev, system test, DevOps, production), for both platform as a whole or on an individual component basis. To this end, we are introducing the ONAP Operations Manager with orchestration capabilities into the deployment, un-deployment and change management process associated with the platform.
- State Management of ONAP platform components – Our initial health checking of Components and software modules are done manually and lack consistency. We are proposing key modules/services in each ONAP Component to be able to self-register/discovered into the ONAP Operations Manager, which in turn performs regular health checks and determines the state of the Components/software.
- Platform Operations Orchestration / Control Loop Actions – Currently there is a lack of event-triggered corrective actions defined for platform components. The ONAP Operations Manager will enable DevOps to view events and to manually trigger corrective actions. The actions might be simple initially – stop, start or restart the platform component. Over time, more advanced control loop automation, triggered by policy, will be built into the ONAP Operations Manager.
Proposed ONAP Operations Manager Functional Architecture:
- UI/Dashboard – this provides DevOps users a view of the inventory, events and state of what is being managed by the ONAP Operations Manager, and the ability to manually trigger corrective actions on a component. The users can also deploy ONAP instances, a component, or a change to a software module within a component.
- API handler – this supports NB API calls from external clients and from the UI/Dashboard
- Inventory & data store – tracks the inventory, events, health, and state of the ONAP instances and individual components
- ONAP Lifecycle Manager – this is a model-driven orchestration engine for deploying/un-deploying instances and components. It will trigger downstream plugin actions such as instantiate VMs, create containers, stop/restart actions, etc. Target implementation should aim at TOSCA as the master information model for deploying/managing ONAP Platform components.
- SB Interface Layer – these are a collection of plugins to support actions and interactions needed by the ONAP Operations Manager to ONAP instances and other external cloud related resources – plugins may include Openstack, Docker, Kubernetes, Chef, Ansible, etc.
- Service & Configuration Registry – this function performs the registry and discovery of components/software to be managed as well as the subsequent health check on each registered component/software
- Hierarchical OOM architecture for scaling and specialization - OOM's architecture allows for a hierarchical implementation for scale as volume/load and scope of the underlying ONAP platform instance(s) increases.
Release Deliverables
Indicate the outcome (Executable, Source Code, Library, API description, Tool, Documentation, Release Note...) of this release.
Deliverable Name | Deliverable Description |
---|
OOM/ONAP Lifecycle Manager | ONAP platform 1-click deploy on K8S |
OOM/ONAP Service & Config Registry | ONAP Platform configuration management on K8S |
OOM/Policy Enforcement | ONAP containers monitoring and auto-healing policy enforcement on K8S |
OOM User guide | Provide guidelines to the community teams for bringing components to oom/kubernetes (all component teams can bring themselves their components to OOM) |
Sub-Components
List all sub-components part of this release.
Activities related to sub-component must be in sync with the overall release.
Sub-components are repositories are consolidate in a single centralized place. Edit the Release Components name for your project in the centralized page.
ONAP Dependencies
As OOM manages all of the ONAP components it has dependencies on all other projects. OOM's first goal is to manage all of the components from the 1.0 release and will incorporate newer components as they mature. In order for a project to be managed by OOM deployment artifacts that must be created - specifically a kubernetes deployment specification(s) and project configuration/environment data - in formats provided by this project.
Architecture
See the ONAP Operation Operations Manager (OOM) Description page.
High level architecture diagram
At that stage within the Release, the team is expected to provide more Architecture details describing how the functional modules are interacting.
Block and sequence diagrams showing relation within the project as well as relation with external components are expected.
Anyone reading this section should have a good understanding of all the interacting modules.5/10/17) and OOM User Guide page.
See also detailed diagrams on the use of TOSCA Model Driven orchestration across container and non-container deployment options.
High level architecture diagram
API Incoming Dependencies
List the API this release is expecting from other releases.
Prior to Release Planning review, Team Leads must agreed on the date by which the API will be fully defined. The API Delivery date must not be later than the release API Freeze date.
Prior to the delivery date, it is a good practice to organize an API review with the API consumers.
API Name | API Description | API Definition Date | API Delivery date | API Definition link (i.e.swagger) |
---|---|---|---|---|
To fill out | High level description of the API | Date for which the API is reviewed and agreed | To fill out | Link toward the detailed API description |
...
MSB Service Registry | ||||
API Outgoing Dependencies
API this release is delivering to other releases.
API Name | API Description | API Definition Date | API Delivery date | API Definition link (i.e.swagger) |
---|
Helm | Helm API | |||
KubeCTL | Kubernetes control | |||
Third Party Products Dependencies
Third Party Products mean products that are mandatory to provide services for your components. Development of new functionality in third party product may or not be expected.
List the Third Party Products (OpenStack, ODL, RabbitMQ, ElasticSearch,Crystal Reports, ...).
Name | Description | Version | To fill out | To fill out | To fill out|
---|---|---|---|---|---|
Kubernetes | |||||
Rancher | |||||
Cloudify (Potential) | |||||
Consul | |||||
Postgres |
In case there are specific dependencies (Centos 7 vs Ubuntu 16. Etc.) list them as well.
Testing and Integration Plans
Provide a description of the testing activities (unit test, functional test, automation,...) that will be performed by the team within the scope of this release.
Describe the plan to integrate and test the release deliverables within the overall ONAP system.
Confirm that resources have been allocated to perform such activities.
Gaps
This section is used to document a limitation on a functionality or platform support. We are currently aware of this limitation and it will be delivered in a future Release.
List identified release gaps (if any), and its impact.
Gaps identified | Impact |
---|---|
To fill out | To fill out |
Known Defects and Issues
Provide a link toward the list of all known project bugs.
Jira Legacy | ||||||||||
---|---|---|---|---|---|---|---|---|---|---|
|
Risks
List the risks identified for this release along with the plan to prevent the risk to occur (mitigation) and the plan of action in the case the risk would materialized (contingency).
Risk identified | Mitigation Plan | Contingency Plan |
---|---|---|
To fill out | To fill out | To fill out |
Resources
Fill out the Resources Committed to the Release centralized page.
Release Milestone
The milestones are defined at the Release Level and all the supporting project agreed to comply with these dates.
Team Internal Milestone
This section is optional and may be used to document internal milestones within a project team or multiple project teams. For instance, in the case the team has made agreement with other team to deliver some artifacts on a certain date that are not in the release milestone, it is erecommended to provide these agreements and dates in this section.
...
Date | Project | Deliverable |
---|---|---|
To fill out | To fill out | To fill out |
Documentation, Training
- Highlight the team contributions to the specific document related to he project (Config guide, installation guide...).
- Highlight the team contributions to the overall Release Documentation and training asset
- High level list of documentation, training and tutorials necessary to understand the release capabilities, configuration and operation.
- Documentation includes items such as:
- Installation instructions
- Configuration instructions
- Developer guide
- End User guide
- Admin guide
- ...
Note | ||
---|---|---|
| ||
The Documentation project will provide the Documentation Tool Chain to edit, configure, store and publish all Documentation asset. |
Other Information
Vendor Neutral
If this project is coming from an existing proprietary codebase, ensure that all proprietary trademarks, logos, product names, etc. have been removed. All ONAP deliverables must comply with this rule and be agnostic of any proprietary symbols.
Free and Open Source Software
FOSS activities are critical to the delivery of the whole ONAP initiative. The information may not be fully available at Release Planning, however to avoid late refactoring, it is critical to accomplish this task as early as possible.
List all third party Free and Open Source Software used within the release and provide License type (BSD, MIT, Apache, GNU GPL,... ).
In the case non Apache License are found inform immediately the TSC and the Release Manager and document your reasoning on why you believe we can use a non Apache version 2 license.
...