Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

The following items are expected to be completed for the project to Pass the M3 API Freeze Milestone.

M3 Release Architecture Milestone overview is available in wiki.

Info
titleUsage
  1. Use the "Copy" and "Move" options (available under the ..., top right of this page) to duplicate this template into your project wiki.
  2. Fill out the Yes/No column
  3. Provide link to evidence (when necessary)


Practice AreaCheckpointYes/NoEvidencesHow to?
SecurityHas the Release Security/Vulnerability table been updated in
the  
the  protected Security Vulnerabilities wiki space?
Table in in the protected Security Vulnerabilities wiki space   corresponds to the latest NexusIQ scanPTL reviews the NexusIQ scans for their project repos and fills out the vulnerability review table
Has the project committed to enabling transport level encryption on all interfaces and the option to turn it off?
Requirements and test cases for transport layer encryption have been   created for all interfaces not currently supporting encryption.
Has the project documented all open port information?

Update OOM NodePort List
Has the project provided the communication policy to OOM and Integration?

 Recommended Protocols
Do you have a plan to address by M4 the Critical
 and
and High vulnerabilities
 
in the third party libraries used within your project?

  • Replace vulnerable packages
  • Document false positives in the release notes if it is not possible to replace the vulnerable packages
  • Document vulnerabilities inherited in dependencies: include the name of the dependency and any mitigations that can be implemented by an ONAP user
  • Ensure by M4 the Nexus-IQ report from “Jenkins CLM” shows 0 critical security vulnerability. Open the Nexus-IQ report for the details on each repository
Architecture


Has the Project team reviewed the APIs with the Architecture Committee (ARC)?

Architecture

walkthrough

walk through to understand how each project contributes on Release Use Case. ARC to organize the

walkthrough

walk through.

Is there a plan to address the findings the API review?
Link to planThe plan could be as simple as a Jira issue to track the implementation of findings or a documented plan within the wiki.
Does the team clearly understand that no changes in the API definition is allowed without formal TSC review and approval?
NAEnsure by M4 the Nexus-IQ report from “Jenkins CLM” shows 0 critical security vulnerability. Open the Nexus-IQ report for the details on each repo.


In the case some changes are necessary, bring the request to the TSC for review and approval.

Is there any changes in the scope, functionalities, deliverable, dependency, resources, API, repositories since M1 milestone?


If Yes, please a link to the evidence of these changes.Critical point to understand is that change is inevitable, and that right timing and clear communication to the community will ease the process of accepting changes.
Provide link to the API Documentation.


Release ManagementAre committed Sprint Backlog Stories been marked as "Closed" in Jira board?
Provide Link to Project backlog
Are all tasks associated with Sprint Backlog Stories been marked as "Closed" in Jira?


Have all findings from previous milestones been addressed?
Provide link to JIRA findings
DevelopmentIs there any pending commit request older than 36 Business hours in Gerrit?
Do you have a plan to address by M4 the Critical  and High vulnerabilities in the third party libraries used within your project?


Gerrit Query: status:open label:verified -is:draft -label:Code-Review=-1 AND -label:Code-Review=-2  AND is:mergeable age:1week


Has the project team reach the Automated Unit Test Code Coverage expectation? (Refer to artifacts available in Sonar)

Goal: 55% for Incubation project in the current release

Sonar

Guidance on Code Coverage and Static Code Analysis

Tools: Sonar

Are all the Jenkins jobs successfully passed ( Merge-Jobs)?


Provide link to evidence

https://jenkins.onap.org/view/Merge-Jobs/

Are all binaries available in Nexus?
Provide link to evidence
Integration and Testing


Have

55 %

50% of System Integration Testing Use Cases been implemented successfully in Jenkins?

It should include at least 1 CSIT that will be run on

Lab-xxx-OOM-Daily Jenkins Job


Provide link to evidence
Has the project code successfully passed the Daily Build process?

Goal is to ensure the latest project commit has not broken the Integration Daily Build 

Has the project passed the Integration Sanity Tests?



Integration sanity tests in Dublin Release cover:

  • ONAP deployment
  • All components health check
  • VNF onboarding and service creation for vFW use case
  • Model distribution for vFW
  • vFW instantiation
  • vFW closed loop
  • vFW deletion

No test failure reported on http://onapci.org/grafana/d/8cGRqBOmz/daily-summary?orgId=1

No Integration Blocking Issue with no workaround: Dublin Release Integration Test Blocking Issues

Modeling

Has the Project team provided links to Data Models (e.g, JSON, YANG, Swagger, etc.) for all Shared Information (e.g., APIs, API Payload, Shared Design Model)?



It is a non-blocking item for M3 - The Modeling team is gathering information