Project NameEnter the name of the project
Target Release NameEl-Alto
Project Lifecycle StateIncubation. Refer to ONAP Charter, section 3.3 Project Lifecycle for further information
Participating Company 

...

 Platform Maturity (i.e., S3P items)  https://wikilf-onap.onapatlassian.orgnet/wiki/display/DW/Dublin+Release+Platform+Maturity

 Green color → Target level ( details see Platform Maturity below)

      • Performance:  Level 1
      • Stability: Level 2 (stetch with new ~52% coverage requirement for Dublin)
      • Resiliency: Level 2
      • Security: Level 1+
      • Scalability: Level 1
      • Manageability: Level 1+
      • Usability: Level 2                   

...

Sub-components are repositories and are consolidated in a single centralized place. Edit the Resouce and Repositories in the centralized page.

...

AreaActual LevelTargeted Level for current ReleaseHow, EvidencesComments
Performance11+  (Dublin recommendation 2 - cannot be committed due to Resource constraint)
    • Level 0: no performance testing done
    • Level 1: baseline performance criteria identified and measured  (such as response time, transaction/message rate, latency, footprint, etc. to be defined on per component)
    • Level 2: performance improvement plan created 
    • Level 3: performance improvement plan implemented for 1 release (improvement measured for equivalent functionality & equivalent hardware)
Stability2

Level 2 (Stetch with new ~52% coverage requirement for Dublin)

Level 2  - Dependent on integration team support



    • Level 0: none beyond release requirements
    • Level 1: 72 hour component-level soak test (random test transactions with 80% code coverage; steady load)
    • Level 2: 72 hour platform-level soak test (random test transactions with 80% code coverage; steady load)
    • Level 3: track record over 6 months of reduced defect rate
Resiliency22
    • 0 – none
    • 1 – manual failure and recovery (< 30 minutes)
    • 2 – automated detection and recovery (single site)
    • 3 – automated detection and recovery (geo redundancy)
Security1

1+ (Dublin recommendation 2 - cannot be committed for following reason)

  • Resource constraint
  • CADI library not available for Python 
  • Process of AAF certificate distribution in K8S between ONAP components and external (xNF) to be defined

    DCAE team will integrate with Buscontroller integration for dynamic topic provisioning and AAF based role setting as STRETCH GOAL



    • Level 0: None
    • Level 1: CII Passing badge
      • Including no critical and high known vulnerabilities > 60 days old
    • Level 2: CII Silver badge, plus:
      • All internal/external system communications shall be able to be encrypted.
      • All internal/external service calls shall have common role-based access control and authorization using CADI framework.
    • Level 3: CII Gold badge 
Scalability1

1



    • Level 0: no ability to scale
    • Level 1: supports single site horizontal scale out and scale in, independent of other components
    • Level 2: supports geographic scaling, independent of other components
    • Level 3: support scaling (interoperability) across multiple ONAP instances
Manageability1

1+ (Dublin recommendation 2 - cannot be committed for following reason)

  • Resource constraint to support #2 and #4 under Level2
    (Level 2 - #1 and #3 will be targeted for Dublin)



    • Level 1:
    • All ONAP components will use a single logging system.
    • Instantiation of a simple ONAP system should be accomplished in <1 hour with a minimal footprint
    • Level 2:
      • A component can be independently upgraded without impacting operation interacting components
      • Component configuration to be externalized in a common fashion across ONAP projects
      • All application logging to adhere to ONAP Application Logging Specification v1.2
      • Implement guidelines for a minimal container footprint
    • Level 3
      • Transaction tracing across components
Usability1

2 (STRETCH GOAL- based on resource availability)



    • Level 1:
      • User guide created
      • Deployment documentation
      • API documentation
      • Adherence to coding guidelines
    • Level 2:
    • Level 3
      • Consistent UI across ONAP projects
      • Usability testing conducted
      • API Documentation
    • Level 4

...

List the API this project is expecting from other projects. Prior to Release Planning review, Team Leads must agreed on the date by which the API will be fully defined. The API Delivery date must not be later than the release API Freeze date.

Prior to the delivery date, it is a good practice to organize an API review with the API consumers.

API NameAPI DescriptionAPI Definition DateAPI Delivery dateAPI Definition link (i.e.swagger)
SDC model distribution APIAPI for retrieving TOSCA model of close loopCurrently AvailableTo fill outLink toward the detailed API description
Policy EngineAPI for retrieving configuration policy updatesCurrently AvailableCurrently AvailableNA
A&AIAPI invoked for information enhancementsCurrently AvailableCurrently Available
DMaaP Message RouterAPI for topic publish / subscribeCurrently AvailableCurrently Available
DMaaP Bus ControllerDMaaP Bus Controller is a part of DMaaP that provides topic provisioning; this is the API for topic provisioning.Currently AvailableCurrently Available
 OOF

 PCI Optimization API http://{OOF-host}:{port}/api/oof/v1/pci

 http://{pcims-host}:{port}/callbackUrl Call back URL for SON-MS (to provide PCI optimization results)

 Currently Available Currently Available
 ConfigDB (SDNC)

http://{ConfigDB-host/IP}:{port}/SDNCConfigDBAPI/getNbrList/{cellId}/{ts} (Get neighbor list for  a cell Id)

http://{ConfigDB-host/IP}:{port}/SDNCConfigDBAPI/getPnfName/{cellId}/{ts} (Get the PNF name for a cell Id)
 Currently AvailableCurrently Available

...

API NameAPI DescriptionAPI Definition DateAPI Delivery dateAPI Definition link (i.e.swagger)
VES IngestionAPI for VNFs to send VES dataCurrently AvailableR3
DCAE Deployment HandlerNB API for invoking the deployment of DCAE subcomponentsCurrently AvailableR3
DCAE InventoryAPI for Add/Delete DCAE copy's TOSCA modelsCurrently AvailableR3
HealthcheckAPI for querying DCAE component healthcheck Currently AvailableR4SON-Handler http://{pcims-host}:{port}/callbackUrl Call back URL for SON-MS (to provide PCI optimization results)TBD
    • Third Party Products Dependencies

...

Risk identifiedMitigation PlanContingency Plan

To fill outTo fill out
    • Resources

Fill out the Resources Committed to the Release centralized page.

    • Release Milestone

The milestones are defined at the Release Level and all the supporting project agreed to comply with these dates.

...