...
Functional Requirements | Owner | Projects Impacted for Casablanca | Link(s) to High Level Design (HLD) /Low Level Design (LLD) (if any) | Priority (from SP perspective) | Dependency (from/to) another project(s) | T-Shirt Size (XS, S, M, L, XL)* | Project's Impact: Test Only (TO), Code (C) | Committed (C)/Partially Committed (P) or not (N) per Impacted projects | If Partially or not Committed, then what are the gaps per impacted project (people/FTEs; HLD/LLD; etc) | Company Engagement | Notes | M4 Status | ||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
HPA | VNFSDK (minor) | HPA Enhancements (For Casablanca Release) | Orange: 2 ATT: 2 China Telecom: 2 China Mobile: 1 Verizon: 2 Vodafone: 2 | VNFSDK: none SDC: VNFSDK, VNFD model Policy: SDC OOF: SO, Policy, AAI AAI: Multi-CLoud | VNFSDK: M SDC:XS Policy: M OOF: S SO: S AAi: S/M Multi-Cloud: M | VNFSDK (C) | Policy: Committed based on Intel providing resources OOF: Committed VNFSDK: Committed SDC: committed based on Intel contribution. SO: committed AAI: committed based on Intel resources. Multi-Cloud: committed | Intel |
All code has been or will be submitted
Unresolved dependency on SDC - two bug fixes required. Update: Oct 18: the bugs on SDC have been addressed | |||||||||||||||||||||||
Change Management - Flexible designer/orchestrator | SDC, SO, VID | Link to Slide | Orange: 1 ATT: 1 China Telecom: 2 China Mobile: 2 Verizon: 1 Vodafone: 2 | VID: on SO SDC: on SO | SDC:XL VID: M | Code: SO,VID,SDC | VID: Not committed (Note: VID part is "nice to have" - no dependency on VID from other projects) SDC: committed based on Amdocs contribution SO : Committed (with support from ATT resources) | VID: requires additional resources | AT&T, Amdocs | |||||||||||||||||||||||
Change Management - traffic migration | SDNC, APPC, VNFSDK | Link to Slide | Orange: 1 ATT: 1 China Telecom: 2 China Mobile: 2 Verizon: 1 Vodafone: 2 | Code: SDNC, APPC | SDN-C: committed APPC: Not committed Orange: Committed | APPC: Not enough details on requirements, plus limited resources | AT&T, Orange, Intel | |||||||||||||||||||||||||
Change Management - 5G PNF software upgrade | SO, A&AI, Ansible/EC - test only support; SDNC/CCSDK- dev to incorporate 5G PNFs | Link to Slide | Orange: 1 ATT: 1 China Telecom: 2 China Mobile: 2 Verizon: 1 Vodafone: 2 | SDN-C: Committed | AT&T, China Mobile, Huawei | |||||||||||||||||||||||||||
Change Management - CM scheduler | OOF, VID VID - Nice to have - the functionality can still be delivered with OOF only (scheduler would need to be invoked through CLI) | Link to Slide | Orange: 1 ATT: 1 China Telecom: 2 China Mobile: 2 Verizon: 1 Vodafone: 2 | VID on OOF | VID: S | Code: OOF, VID | OOF: Committed VID: Not committed (this can still be delivered with OOF) | VID: requires additional resources | AT&T | |||||||||||||||||||||||
Scaling Closed Loop Scaling (High Priority) | Policy, CLAMP, SO, DCAE | Link to Slides | Orange: 1 ATT: 1 China Telecom: 1 China Mobile: 1 Verizon: 3 Vodafone: 1 | CLAMP: on Policy Policy: on SO | CLAMP: M | Code: SO, CLAMP, Policy Test: DCAE | CLAMP: Committed with risks (dependency on Policy) Policy: Committed with risks (TBD) SO: Committed DCAE: Committed | AT&T |
All code has been or will be submitted | |||||||||||||||||||||||
Scaling Beijing Improvements (High Priority) | Scott Blandford | APPC, SDNC, SO, AAI, VID | VID: on SO APPC: on SO | VID: XS AAI: XS | Code: APPC, SDNC, SO, AAI | AAI: Committed APPC: Committed SDNC: Committed SO: Committed VID: Committed | AT&T |
All code has been or will be submitted (VID is having issues with test environment) | ||||||||||||||||||||||||
Scaling Controller_Topic_ID (Medium Priority) | Scott Blandford | SO | Code: SO | SO: Committed | AT&T |
All code has been or will be submitted | ||||||||||||||||||||||||||
Scaling Homing and Capacity Check (Low Priority) | Scott Blandford | Multi-VIM, OOF, SDNC, SO | OOF: on Multicloud and Policy | OOF: S | Code: OOF, SO, SDNC, Multi-VIM | OOF: Partially Committed | OOF: Resource issue if R2 solution needs to be extended for new policy constraints. | AT&T |
| |||||||||||||||||||||||
5G/PNF Plug and Play | SDC, SO, SDN-C, A&AI, CDT, Modeling, VID, DCAE, DMaaP | Link to Slide | Orange: 2 ATT: 1 China Telecom: 3 China Mobile: 1 Verizon: 1 Vodafone: 2 | VID: on SO | VID: S AAI: XS? need clarification on what's expected OOF: No impact | Code: VID Test Only: SDC Code : DCAE | VID: Committed based on Nokia's contribution SDNC: committed SO: Committed (with resources from Nokia) SDC: support based on current sdc capabilities from Beijing. APPC: No impact AAI: No code change, only modeling changes OOF: No impact DCAE: committed DMaaP: committed | APPC: Per review of slides, does not appear to be anything specific for APPC in Casablanca. Items mentioned are more longer term, roadmap items AAI: Expecting this to be modelling/schema updates only but unclear. Need additional information and analysis by AAI SMEs OOF: Additional information required on policies required for PNF placement DCAE: Committed based on Nokia's contribution on PRH | AT&T, Nokia, |
Code has been developed and submitted.
SO Code Merge. Health Checks for PRH done in DCAE.
E2E.Test cases need to be updated (for integration & testing) after1st run of whole flow. Sunny Day scenarios to be prepared (for testing). | ||||||||||||||||||||||
5G/PNF Software Version Reporting | CCSDK, SDN-C | Link to Slide | CCSDK: committed SDN-C: committed | AT&T |
A&AI and SDC support has been developed.
Usage in the 5G Software Upgrade Use Case is pushed to Dublin | |||||||||||||||||||||||||||
5G/PNF Lifecycle Management Support (Restart, Suspend of PNF) | SDN-C/SDN-R. Controller support for operations. SDNC (SDNR) dev to incorporate 5G PNFs | Link to Slide | OOF: Supports Change Management Scheduling SDN-C: Committed | Will address this via Change Management | AT&T, China Mobile, Huawei |
SDN-C Interfaces need investigation. Want to make sure SDN-C is supporting Ansible. | ||||||||||||||||||||||||||
5G/performance Analysis and Optimization High Volume and RT Data Collection of PM | DCAE, DMaaP, | Link to Slide | Orange: 2 ATT: 2 China Telecom: 1 China Mobile: 3 Verizon: 3 Vodafone: 3 | DCAE: on DMAAP (native Kafka support) | OOF: M DCAE: L | code change: OOF Code : DCAE | CCSDK: committed SDN-C: committed OOF: No Impact DCAE: Committed (based on Nokia contribution) with dependency risk | OOF: Limited resources | AT&T, Nokia, | DCAE: Edge deployment support for R3, DDS-VES and new analytic platform (flink) not committed due to resource constraint |
Code is developed & Submitted. | |||||||||||||||||||||
5G/performance Analysis and Optimization Bulk PM | DCAE, DMaaP | Link to Slide | DCAE: on DMAAP-DR | DCAE:L | code change: DMaaP Code change: DCAE | DCAE: DataFileCollector- Committed (based on Ericsson Contribution) with dependency risk PMMapper - Partial Commit (Based on Ericsson contribution) + dependency risk – Not a hard requirement | DCAE: Dependency on DMAAP-DR + PMMapper (Stretch goal) | AT&T, Ericsson |
DMaaP Data Router
File collector available but with a few pending tasks Update form Vimal on Oct 4: File collector on track.
PM Mapper postponed to Dublin at M3 | |||||||||||||||||||||||
5G/performance Analysis and Optimization Optimization Framework Enhancements (Placement, Formulation, Solving) | OOF | Link to Slide | OOF: M | code change: OOF | OOF: Committed to SON | AT&T, Nokia, Reliance Jio |
All code has been submitted | |||||||||||||||||||||||||
Withdrawn from Casablanca release by the requirement owner | Orange: 3 ATT: 3 China Telecom: 1 China Mobile: 2 Verizon: 2 Vodafone: 3 | |||||||||||||||||||||||||||||||
Centralized Representation and Consistent ID of Cloud Regions, Plan B, Phase 1: Centralized Representation of Cloud Regions | SO, Integration | Centralized Representation and Consistent Identification of Cloud Regions In ONAP | Orange: 1 ATT: 2 China Telecom: 2 China Mobile: 3 Verizon: 1 Vodafone: 1 | code : SO, Integration | SO: committed based on Intel's contribution Integration: committed | To align MVP, propose alternative action plan B: break this requirement into 3 phases. Phase 1 is to centralize the representation of cloud regions; Phase 2 is to apply consistent ID across all related ONAP projects. Phase 3 is to correlate and align dcaeLocation to AAI's cloud region. This phase requires further discussion, hence not listed here. Note on "Intel's contribution": This is the synergy effort with HPA, no further special changes needed here. hence this can be deemed as a dependency on HPA's impact on SO. | SO: will be ready to test soon. Integration: Not started yet. | |||||||||||||||||||||||||
Centralized Representation and Consistent ID of Cloud Regions, Plan B, Phase 2: Consistent ID of Cloud Regions | SO,VID,SDNC,OOF,VFC, UUI,MultiCloud. | Centralized Representation and Consistent Identification of Cloud Regions In ONAP | Orange: 1 ATT: 2 China Telecom: 2 China Mobile: 3 Verizon: 1 Vodafone: 1 | VID/SDNC: on SO SO/OOF/VFC: MultiCloud | VID: XS MultiCloud: S VFC:S | code : SO,VID,SDNC,OOF,VFC, UUI,MultiCloud | SO: not committed VID: Not Committed SDNC: Not committed OOF: Committed MultiCloud:Committed VF-C :Committed UUI: committed | SDNC: Limited resources VID: requires additional resources | MultiCloud: Ready to test VFC: not started yet UUI: not started yet | |||||||||||||||||||||||
Edge Automation Through ONAP (EA) | A&AI, Multi-Cloud, OOF, SO | Orange: 3 ATT: 3 China Telecom: 3 China Mobile: 3 Verizon: 2 Vodafone: 1 | OOF: on MultiCloud & SO Multi-Cloud: on A&AI | SO: XS AAI: XS OOF: M Multi-Cloud: M-L | Code: OOF, Multi-Cloud, A&AI, SO Test: Integration (vFW use case) | Casablanca MVP:
| M4 on target in relevant projects Integration Test Plan in Progress: HPA & Cloud Agnostic Intent - R3 Test Plan (In Progress) | |||||||||||||||||||||||||
Edge Automation Through ONAP (EA) | Multi-Cloud | Orange: 3 ATT: 3 China Telecom: 3 China Mobile: 3 Verizon: 2 Vodafone: 1 | Multi-Cloud: M-L | Code: Multi-Cloud | Casablanca MVP:
| M4 on target in relevant projects Start Small MVP "Node metrics and HPA metrics from Grafana dash board" No plan for integration testing. |
...