This page summarizes the projects participating into Casablanca Release.

M1 Status

All projects along with Functional, Non-Functional and Uses Cases marked with a green checked mark passed M1. TSC approved M1 on July 5 (Topic 3, section g)

Deck as approved on July 5 is available in wiki.

July 19 Update: Scope Change. From a Casablanca scope perspective, there are 2 additional functional requirements added:

  1. Change Management – Trafic Migration

  2. Change Management – PNF Software Upgrade


Slide deck has been updated accordingly. 

M2 Status

All projects passed M2 Functionality Freeze. TSC Approval (Topic #5, Section Y )



M3 Status

M3 review took place on August 23, 2018.

M3 Outcome:

AAF, ExtAPI, VVP and VNFRQTS are conditionally approved until they undergo Architecture review which is scheduled on Tuesday, August 28.

TSC approved all other projects 

M3 Update: Thursday, August 30. AAF, ExtAPI, VVP and VNFRQTS have gone through the Architecture review. TSC approved M3 milestone (Topic 3, Item 2).



M4 Status

M4 review took place on Sept 20, 2018.

Materials:

M4 Outcome

TSC  approved the Release Manager Recommendations. Link to approval.

Release Manager recommendation (as per slide # 35)

  1. Pass projects who have submitted checklist on time (specifically all project but SDC and UseCase UI)

  2. Get Action Items addressed within 1 week

Action Items:

Slide #4: @Michael Lando to review Bugs impacting HPA Done1 SDC defect fixed, one still in WIP. ETA: planned for beg next week.
Slide 7-12: @Vimal Begwani to provide status on 5 G implementation STATUS WIP 
           5G Plug & Play: @Brian Freeman Follow up on PRH HealthCheck within DCAE Done
           5G/PNF: Lifecycle Managament Support: @Tracy Van Brakle and @Jorge Hernandez to confirm that the necessary Ansible playbooks were delivered,
           and the necessary directed graph updates were made to invoke those playbooks
           5G: Bulk PM: @Vimal Begwani File collector WIP. ETA Oct 4. Done
Slide 12: @Sarat Puthenpura to provide ETA on 5G Performance Analysis and Optimization STATUS Done
Slide #16: PTLs to update Casablanca Platform Maturity table at https://lf-onap.atlassian.net/wiki/display/DW/Casablanca+Release+Platform+MaturityMissing   Modeling (@Hui Deng), VID (@Ofir Sonsino)
Slide #16: Gildas to add Platform Maturity table in M4 checklist. STATUS Done
Slide #23: @cl664y@att.com to update status on OSAM/PNF (postpone to Dublin or not) STATUS: PostponedOSAM postpone to Dublin.
Slide #25: Impacted PTLs to fix CSIT Failure. STATUS Done for DCAE, Multicloud, VFC, ExtAPI, DMAAP,OOF.
Slide #27: @Jonathan Gathman and @Michael Lando to increase code coverage for aaf-auth and sdc master and provide update on repos for which there is no report in Sonar. 

                           STATUS: Won't reach 50% goal@Jonathan Gathman indicated that he won't be able to reach the 50% target got AAF by lack of resource.

                                SDC on sdc/dcae-d/tosca-lab WIP

                                                               sdc/dcae-d/dt-be-main Done reach 51%

                                                               sdc/dcae-d/dt-be-property WIP

                                                               sdc/dcae-d/ci : Automation repo. Won't be covered by Code Coverage.

Slide #28: Impacted PTLs to publish Vulnerability report. Steven Wright to follow up with @Gildas Lanilis Gmail for VVP. STATUS Done for VVP, Multicloud, Modeling, MUSIC 
                  Missing   UseCase UI (@Tao Shen)
Slide #29-30: Impacted PTLs: Clean or Fix Job Failure
                  FAILURE Logging(@Michael O'BrienDone for APPC,HOLMES, AAI, AAF  
Slide #32: OOF team to ensure Healthcheck passes. STATUS  DoneOOF pass on both Wind River OOM Release and Staging.
Slide # 33 Risks: Jonathan Gathman and Manoop Talasila to address risks #3 on CADI. STATUS: Risk #3 closedDone

RC0 Status

RC0 review took place on Oct 11, 2018.

Materials:

RCO Outcome:

Projects Passing RC0:

  1. CCSDK

  2. Doc

  3. Integration

  4. VNFRQTS

Action Items:

Conditional on all other Projects in addressing Orange and Red Items (in above slides) related to:

  1. Pair Wise Testing: MUST be completed by RC1

  2. HealthCheck, focus on OOM environment, to be addressed by Oct 15

  3. Docker artifacts: to be delivered by Friday, Oct 12 COB.

RC1 Status

RC1 review took place on Oct 25, 2018.

Materials:

RC1 Outcome:

Projects Passing RC1:

  1. AAI

  2. AAF

  3. Clamp

  4. Cli

  5. Dmaap

  6. Doc

  7. ExtAPI

  8. Integration

  9. Pomba (sub project)

  10. MSB

  11. OOM

  12. SO

  13. VFC

  14. VNFRQTS

  15. VNFSDK

  16. VVP

Update on RC1 on Nov 6:

Based on progress made since RC1 on Oct 25, and presented at PTL meeting on Nov 5,  the following projects qualifies for passing RC1:

  1. APPC

  2. CCSDK

  3. DCAE

  4. Log

  5. Multivim

  6. Music

  7. Portal

  8. SDC

  9. Usecase UI

RC2 Status

By TSC decision on Nov 8, RC2 Milestone has been pushed to Tuesday, Nov 27 and Release Sign-Off to Friday, Nov 30.

Casablanca Milestones Status



Project Name

Project Tech. Lead

M0 Kick-Off/Intention Submission

M1

Planning

M2

Functionality freeze

M3

API Freeze

M4

Code Freeze

RC0

Release Candidate 0

RC1

Release Candidate 1

RC2

Release Candidate 2

Sign-Off

Release Delivery



Project Name

Project Tech. Lead

M0 Kick-Off/Intention Submission

M1

Planning

M2

Functionality freeze

M3

API Freeze

M4

Code Freeze

RC0

Release Candidate 0

RC1

Release Candidate 1

RC2

Release Candidate 2

Sign-Off

Release Delivery

1

A & AI

@James Forsyth

June 7, 2018

Planning

Checklist

Checklist

Checklist

Checklist

Checklist

Checklist

Checklist



2

Application Authorization Framework

@Jonathan Gathman

(replacing @Ramprasad Koya)

June 7, 2018

Planning

Checklist

Checklist

Checklist

Checklist

Checklist

Checklist

Checklist



3

APPC

@Takamune Cho (replacing @Randa Maher)

June 7, 2018

Planning

Checklist

Checklist

Checklist

Checklist

Checklist

Checklist

Checklist



4

CLAMP

 @Gervais-Martial Ngueko

June 7, 2018

Planning

Checklist

Checklist

Checklist

Checklist

Checklist

Checklist

Checklist



5

Common Controller SDK

@Dan Timoney

June 7, 2018

Planning

Checklist

Checklist

Checklist

Checklist

Checklist

Checklist

Checklist



6

DCAE

@Vijay Kumar

(replacing @Lusheng Ji)

June 7, 2018

Planning

Checklist

Checklist

Checklist

Checklist

Checklist

Checklist

Checklist



7

DMaaP

@Ramprasad Koya

June 7, 2018

Planning

Checklist

Checklist

Checklist

Checklist

Checklist

Checklist

Checklist



8

Documentation

@Sofia Wallin

June 7, 2018

Planning

Checklist

Checklist

Checklist

Checklist

Checklist

Checklist





9

External API Framework

@Matthieu Geerebaert

(replacing @Andy Mayer)

June 7, 2018

Planning

Checklist

Checklist

Checklist

Checklist

Checklist

Checklist

Checklist



10

Holmes

@Guangrong Fu

June 13, 2018

Planning

Checklist

Checklist

Checklist

Checklist

Checklist

Checklist

Checklist



11

Integration

@Helen Chen

June 7, 2018

Planning

Checklist

Checklist

Checklist

Checklist

Checklist

Checklist

Checklist



12

Logging Enhancements Project

Including POMBA

@Michael O'Brien

June 7, 2018

Planning

Checklist

Checklist

Checklist

Checklist

Checklist

Checklist

Checklist



13

Microservices Bus

@Former user (Deleted)

June 14, 2018

Planning

Checklist

Checklist

Checklist

Checklist

Checklist

Checklist

Checklist



14

Modeling

@Hui Deng

June 7, 2018

Planning

Checklist

Checklist

Checklist

Checklist

Checklist

NA

NA

NA

15

Multi VIM/Cloud

@Bin Yang (replacing @Former user (Deleted))

June 7, 2018