Skip to end of metadata
Go to start of metadata

You are viewing an old version of this page. View the current version.

Compare with Current View Page History

Version 1 Next »

We will use vFW use case as the baseline to test this:

Pre-requirement: Instantiate a vFW with closed loop running.

VNF Onboarding and Distribution: 

VNF Instantiation: 

Closed Loop: 


Requirement

Area

Priority

Min. Level

Stretch Goal

Level Descriptions (Abbreviated)

Resiliency

High

Level 2 – run-time projects
Level 1 – remaining projects

Level 3 – run-time projects
Level 2 – remaining projects

•1 – manual failure and recovery (< 30 minutes)
•2 – automated detection and recovery (single site) (<30 minutes)
•3 – automated detection and recovery (geo redundancy)

  • No labels