Status | DRAFT |
Submitter | Rabi Abdel (Vodafone) |
Contributors | Bryan Whittle (iconectiv) |
Proposed Release | Frankfurt Release |
JIRA Ticket(s) |
Overview
This is an expansion to a previous contribution made for the Dublin Release (VSP Compliance Check within SDC (Dublin) - Phase 1) and a companion contribution proposed for the Frankfurt Release (VSP Compliance and Validation Check within SDC (Frankfurt) - Phase 2).
Abstract
This proposal will allow dynamic checks within SDC to invoke VTP to run compliance and validation tests against a VSP (VNF) for OVP certification as well as custom requirements.
Rationale
Please refer to: VSP Compliance Check within SDC (Dublin) - Phase 1
Other Options Considered
Please refer to: VSP Compliance Check within SDC (Dublin) - Phase 1
Proposal
From a high-level perspective, the proposal will allow a VSP, when uploaded into SDC, to go through a set of compliance and validation tests for OVP certification as well as custom requirements. Test results will be integrated for display on the SDC Front End UI. Results for OVP certification will also be in the submission file format for upload to OVP.
Impacts
References
VSP Compliance Check within SDC (Dublin) - Phase 1
VSP Compliance and Validation Check within SDC (Frankfurt) - Phase 2