2020-08-26 Control Loop Sub Committee
Discussion items
Duration | Agenda Item | Requested by | Notes / Links |
---|---|---|---|
START RECORDING | |||
ATTENDEES
NOTES
Control Loop TOSCA poc @Liam Fallon
Created branch in CLAMP
Hoping to use the same code in Policy, using those dependencies and adding new objects
Database first (TOSCA in and out) and then POJOs
Just starting up and ready to go when all folks back from annual leaves
@Gervais-Martial Ngueko question - what is the actual control loop flow that is desired at the end? Liam - will come back to that, working on the base functionality first. Michela is thinking about that.
How will the template (flow) will go to DCAE?? Currently SDC to DCAE, would need to know if that is unchanged or not.
https://wiki.lfnetworking.org/display/LN/2020+October+Virtual+Technical+Event+Topic+Proposals - setup a Control Loop meeting for 60 minutes Oct 13-15th
Self-Serve Update @Vijay Kumar
MOD Nifi based updates, had some incremental enhancements are mostly done
MOD work - refactored seed code for easier ingestion, expecting one component delivery end of this week.
Policy model on-boarding will continue to be worked on, will not be tied to Guilin milestone
Policy Validation Tool - @Pamela Dragosh is starting work on it
Planning on using API to validate the Policy Type in MOD - Honolulu??
Command Line Tool for designers to validate before on-boarding into DCAE-MOD - Guilin is possible
Will communicate with Vijay by Friday on what this may look like
Policy Based Filtering - work almost complete, waiting for some other application work to come in before finishing. On target to finish for M4.
Update on Integration Testsuite: dcagen2 was updated and the blueprint, not sure what other work is happening via the Integration team. Seems to be done on gitllab infrastructure.
All - Need to plan for RC0 Pairwise testing, Christophe and Sebastien to take over from Yuriy and Marco the testing