Skip to end of metadata
Go to start of metadata

You are viewing an old version of this page. View the current version.

Compare with Current View Page History

Version 1 Next »

1- Brief Project Overview (brief as it should be known)



2- New component capabilities for Guilin, i.e. the functional enhancements, if applicable


3- New or modified interfaces


4- If they are modified, are they backwards compatible?


6- Interface naming (point to an example)


7- Consumed API from other projects

Project

API Dependency

Notes

APi Specs

(Swagger)














































8- Published API

Project

API

Notes

APi Specs

(Swagger)


















9- Reference to the interfaces.

(Reference to the the swagger.json file(s) whenever possible)

10- What are the system limits?

.

11- Involved use cases, architectural capabilities or functional requirements.


12- Listing of new or impacted models used by the project (for information only).

  • Identify any High Level Information Model Requirements.   See: ONAP R7 Modeling High Level Requirements
    • Models based on information exchanges from Use Cases
    • Models documenting existing implementations
    • Forward looking models that may be implemented in future releases
  • Describe how exposed APIs are mapped to information models

(list all the relevant Jira tickets)


13-Test plan/Testing Strategy

  1. Unit Testing
  2. Dev-to-Dev Testing  and
  3. Integration


14- Any other details that are specific to this functional enhancement or UseCase.




  • No labels