2018-08-30 (Aug 30)

Agenda

  •  

    • Status and Stucks

    • Technical Discussion

    • Making the PTL Happy

Notes

  •  

    • Status and Stucks

      • Current POMBA Casablanca Stories (Logging Project)

      • Current Code Inspections

      • We will start moving Stories to Dublin that we don't think will make the code cutoff date

      • Data router and search data service, a&AI context builder and validation service decomposer are merged

        • OOM (yes)

        • Regular code (yes)

        • Stories will be closed shortly

          • Note we can track some left over bits as bugs as appropriate and close stories.

      • All seed code except (SDNC and enricher) are now in!

      • Right now someone should be able to download in ONAP repo and run an audit

      • We can now send out an email telling people how to do it. Let's ensure we have reasonable instructions though.

        • Note they will have disclaimers.

        • Once below bug is fixed

      • Note there is an A&AI context builder bug

        • This will block successful execution

        • Fixing this should be a priority

        • Note there was another bug, that has been fixed and checked in.

      • We do have an ONAP open lab setup of POMBA + real components its needs. This enables end to end testing with vFW.

    • Technical Discussion

      • We will demo the updated APIs and rules when available.

        • Network Discovery demo

          • Perhaps in SDNC weekly as a standalone piece as well.

      • SDNC Context Builder

        • Requires extra work, in particular as the prototype needs to be modified to use the generic resources API.

        • It would be interesting for folks though, from a reporting perspective.

    • Making the PTL Happy

      • M3 passed last week (I think)

      • Code freeze is Sept 20

        • After this date, the focus is more bug fixes.

      • Note that we have a sonar bug reported for the data router, we have the fix in review.