2018-08-30 (Aug 30)
Agenda
Status and Stucks
Technical Discussion
Making the PTL Happy
Notes
Status and Stucks
Current POMBA Casablanca Stories (Logging Project)
Current Code Inspections
We will start moving Stories to Dublin that we don't think will make the code cutoff date
Data router and search data service, a&AI context builder and validation service decomposer are merged
OOM (yes)
Regular code (yes)
Stories will be closed shortly
Note we can track some left over bits as bugs as appropriate and close stories.
All seed code except (SDNC and enricher) are now in!
Right now someone should be able to download in ONAP repo and run an audit
We can now send out an email telling people how to do it. Let's ensure we have reasonable instructions though.
Note they will have disclaimers.
Once below bug is fixed
Note there is an A&AI context builder bug
This will block successful execution
Fixing this should be a priority
Note there was another bug, that has been fixed and checked in.
We do have an ONAP open lab setup of POMBA + real components its needs. This enables end to end testing with vFW.
Technical Discussion
We will demo the updated APIs and rules when available.
Network Discovery demo
Perhaps in SDNC weekly as a standalone piece as well.
SDNC Context Builder
Requires extra work, in particular as the prototype needs to be modified to use the generic resources API.
It would be interesting for folks though, from a reporting perspective.
Making the PTL Happy
M3 passed last week (I think)
Code freeze is Sept 20
After this date, the focus is more bug fixes.
Note that we have a sonar bug reported for the data router, we have the fix in review.