Skip to end of metadata
Go to start of metadata

You are viewing an old version of this page. View the current version.

Compare with Current View Page History

« Previous Version 2 Next »

Date

Attendees

DISCUSSION ITEMS LOG


CtgryItemWhoNotes

Pltfm


PLATFORM TOPICS:

Controller to NF Association

R5/R6 Topic

See Slides Nov 6, 2018. Development of Controller to NF assignment association S/W.

CDS, VF-C, APP-C, SDN-R, SDN-C; will the CCSDK "merging" of controllers happen in R6?

USE CASE REALIZATION MEETING (Notes 2018-11-6) Ctrl-NF

Pltfm

PLATFORM TOPICS:

Data Persistency, CM

STATUS: Work for ConfigDB completed, not merged in R4

Dan Timoney moved to R5, one Jira for ConfigDB. One issue about merging.

ONAP code added can take a test ONAP deployment to have the ConfigDB work.

USE CASE REALIZATION MEETING (Notes 2019-01-30) U/C Cross-Interaction, Persistency

Pltfm

PLATFORM TOPICS:

Controller LCM API Evolution

https://wiki.onap.org/download/attachments/50202249/2019-04-09%20ONAP_LCM_API_Evolution_El_Alto.pptx?api=v2

Goals (Architecture Evolution)
  • Target is common LCM API in CCSDK usable by different controller personas to simplify for both clients and controller implementations
  • Support PNFs for applicable LCM operations in a consistent way
  • Enable use of CDS blueprint processor to customize behavior of LCM operations in the 'self-service' category
    • In ONAP R4, CDS can be used for pre/post-instantiation configuration. Generic and model-driven design should allow CDS usage to be extended for additional operations and use cases.
  • Evolution steps that preserve backwards compatibility for clients

Present at the Arch S/C Apr 9 (Tue) second presentation.

Use Cases

USE CASE/5G:

RAN (ORAN-3GPP) Standards harmonization with ONAP

  • Orchestration at the Edge.
  • A1/O1/E2 communications. Edge to ENBs, Telemetry.
  • E2 will not have this info. O1 is I/F for PM counts. Not a management I/F.
  • WG3 (ORAN) is defining this.
  • ONAP w/ O1. Changes w/ O1 interface.
  • How to satisfy A1/O1 and in what time-frame.
  • U/C ORAN - ONAP harmonization. 3GPP ORAN ONAP.
  • Starting a new U/C in 5G. Marge, Vimal, Fred Feisullin
  • Edge inventory & topology. Transport BH consideration w/ real-time near-RT aspects
  • Akraino. MEC. Edge automation (Ramki).

Use Case WIKI: MOBILITY STANDARDS HARMONIZATION WITH ONAP

Use Cases

USE CASE/5G:

Licensing Management

New U/C added to the 5G Use Cases for Licensing Management

Use case Wiki: LICENSING MANAGEMENT

Use Cases

USE CASE/5G:

OOF/PCI

PoC U/C will happen in WinLab. To meet time lines do those parts in Windriver focusing on DCAE, Policy and OOF.

Jira SDN-C (Dan Timoney) pushed El Alto (the Maintenance Release).

Use Cases

USE CASES:

BBS U/C Evolution

BBS Evolution - Slide set linked in R6 proposed U/C. List of proposals & functional requirements.

  1. Change Service - want to use ONAP platform.
  2. Full Closed Loop for Fault Management - CLAMP.
  3. Service Update API (SO) - will be developed

https://wiki.onap.org/download/attachments/60887504/BBS_R5_v1.pptx?version=1&modificationDate=1554180715000&api=v2

Use Cases

USE CASES/5G:

PM Dictionary/FM MD GUI

FM META DATA & PM DICTIONARY in R5
Use Cases

USE CASES/5G:

PNF S/W Upgrade

PNF software upgrade in R6 Frankfurt
Use Cases

USE CASES/5G:

Preonboarding/Onboarding

PNF PREONBOARDING / ONBOARDING in R5
Use CasesUSE CASES:

IoT Service Creation

IoT Create Services on 5G

5G Use Cases in R6 Frankfurt

June 19, 2019

Use Cases

USE CASES:

Modeling gNB/5G RAN

Align, harmonize, reconcile various information models to ONAP model:

Expand & verify model and harmonize with the ONAP internal information & data model:

ETSI SOL001 ... 007 with ONAP internal Model

PNFD modeling (Model S/C)

5G Model (3GPP, RAN)

ORAN (WGs, RAN)

Open ROADM (reconfig optical add/drop multiplexer, Optical)

ONF (Optical)

ISOMII (Optical)

OTCC (Optical transport config & control)

 - Use Cases that need transport models need some model consistency.

 - Try a Use Case with extended ONAP model & real equipment.

Use Cases5G NRM (Network Resource Model) Configurationwangyaoguang

Presented at the 2019 June LFN DDF, titled as '5G Provisioning management service to NRM

Presentation scheduled for Aug 8, 2019

Arch

Architecture S/C

PNF POB/OB Flow

Arch S/C Information Flows:

Draft ONAP Information Flows

New Information flow for Preonboarding/Onboarding xNF packages/resources.

ARCHCOM: InfoFlow - Onboard Resource into SDC Flow

PltfmA&AI

A&AI updates

TSC

TSC:

PoC Definition

POC definition
TSC

TSC/USE CASES:

Test Automation Progress

Use Case Test Automation

Action Items: Use case subcommittee to reach the Dublin use case owner to provide the following information. what's the current percentage of testing automation regarding your use case and functional requirements; what will be the plan to be 100% and constraints (resources availability etc.)


R6 Frankfurt / M0

Use Case Tracking Template

Need the U/C teams to fille out the Dev. Impacts.







KEY PRESENTATIONS & OVERVIEWS

DATETOPICPRESENTERDESCRIPTION
Apr 10, 2019Controller LCM API Evolution
  • Target is common LCM API in CCSDK usable by different controller personas to simplify for both clients and controller implementations
  • Support PNFs for applicable LCM operations in a consistent way
  • Enable use of CDS blueprint processor to customize behavior of LCM operations in the 'self-service' category
    • In ONAP R4, CDS can be used for pre/post-instantiation configuration. Generic and model-driven design should allow CDS usage to be extended for additional operations and use cases.
  • Evolution steps that preserve backwards compatibility for clients

https://wiki.onap.org/download/attachments/50202249/2019-04-09%20ONAP_LCM_API_Evolution_El_Alto.pptx?api=v2

May 1, 2019A&AI GraphGraph Visualizer

Visualizer for A&AI Model Layout

Use Case Realization Call: May 1, 2019

May 8, 2019A&AI Model Browser, Sparky

A&AI developer Model Browser to navigate and viewing attributes, object types & edge view

Recording & Slides: Use Case Realization Call: May 8, 2019

May 15, 2019A&AI Run Time Browser (Sparky)A&AI Run-Time Browser
May 22, 2019Edge Automation Overview

Central & Distributed Edge ONAP configuration.

Topics include: Onboarding, Instantiation, Edge Orchestration, A&AI, Architecture, Work-flows, Multi-Tenancy

Use Case Realization Call: May 22, 2019

May 29, 2019Modeling S/C , Use Case Project Teams, Architecture S/C Way of Working

Model S/C (Sub committee) contributions page:

Modeling sub-committee Contributions

https://wiki.onap.org/display/DW/Proposed+ONAP+Release+Process+Updates+for+Information+and+Data+Modeling

Jun 5, 2019Use Case slides for Dev. ForumUse Case Realization Call: June 5, 2019
Jun 12, 2019(No Meeting)Developer's Forum(No Meeting)
July 10, 2019R6: PNF Software Upgrade

ONAP Read the Docs/R4 Announcements

WIKI: PNF software upgrade in R6 Frankfurt

July 24, 2019R6: OOF/SON PCI Use CaseOOF / PCI / SON Use Case
Aug 7, 20195G NRM (Network Resource Model) Configuration U/Cwangyaoguang5G NRM (Network Resource Model) Configuration U/C
Aug 14, 2019ORAN Standards Harmonization U/CORAN Standards Harmonization U/C
Aug 21, 2019Modeling Sub-Committee guidelines & Use Case Interactions

SUPPORTING DOCUMENTATION

DocumentFile

ORAN / 3GPP ONAP Alignment Use Case Presentation

Vimal Begwani

marge.hillis


R6 Use Case Analysis & Cross-Interaction Matrix


See Also the R6 Frankfurt Release requirements Wiki:

Frankfurt Release Requirements




RECORDING

RecordingFILE
Zoom Video & Audio (MP4)


Audio Only (M4A)


Playback (M3U)


Chat (Txt)


Action items

  •  


  • No labels