Agenda:
- Casablanca goals are being defined here https://wiki.onap.org/display/DW/Casablanca+goals
- Code Coverage needs to be improved to 80% - require TechM and IBM resources to commit for the plan
- SDK repo - Naveen is working this. update on the SDK coverage?
- Prasad/Swapnali - Please use Epic - PORTAL-268 - for code coverage - PORTAL-273; for sonar issues - PORTAL-247; (focused on Portal repo).
- Portal's Javascript unit test plan? Yes it should be done in Casablanca- Prasad/Swapnali (Manoop to followup with TSC on the requirement on JS code coverage), Karma - look into it (Yatindra looking into it) plugin like jacoco
- Design for Angular update - Saravanan to provide the Design review and plan; listed out items, testing one screen, needs a week for this , another week for design document
- Portal Admin screen - for POC to migrate to latest Angular - Saravanan (
Design discussion to understand the impact - Thurs 05/31). Demo with one screen with Angular 5, Karma testing - Demo shown to Sunder- Bring the application with Angular 1 and latest versions - Saravanan
- Estimate of the migration to latest Angular - Saravanan
- fonts and icons abstraction so that they can be switched with a flag configuration - Saravanan
- Portal Admin screen - for POC to migrate to latest Angular - Saravanan (
- SDK code coverage dropped to 49% on master - every new code commit from any developer must make sure that that the code coverage remains same and improves - Kishore to push the code coverage mostly related to AAF changes. - The latest commit is abandoned - new commit is submitted (https://gerrit.onap.org/r/#/c/51087/) - it is under review (verify the comments under the abandoned commit are addressed - here is the abandoned commit - https://gerrit.onap.org/r/#/c/49785/).
MUSIC jar 2.5.5 is missing and failing Jenkins jobs.- Lorraine to run grep scan for ecomp keyword - done - Review with Sunder/Manoop - will send them result in email
- Look for the vm host names in the files - to clean up - Lorraine already made commit for this changes - Hima can help if requires java file changes
- Design to be scheduled for Simplify etc/hosts, OOM and AAF changes - Sunder (forward to Ritesh and team too)
Award nominations - ONAP Community Awards: Beijing Release - Nominations: Close 6 PM Pacific time, June 14 - Voting will take place June 15 -- 19
Attendees:
Discussion Items:
- OOM integration and enhancement plans for Casablanca - Manoop/Sunder
- deployment, scalabilty of the platform issues (Start creating user stories based on the design review)
- Music cassandra as a service - integration? - Sunder
- Music team to provide DB as a service - working with Bharat (pending proposal and approval from ONAP architecture)
- AAF integration plan for Casablanca - Sunder/Farhan/Manoop
- Turning ON AAF and starting using role management for partners
- AAF certificate management integration (both for FE HTTPs and BE rest API calls)
- Security issues from Nexus-IQ plan for Casablanca - Farhan
- Angular will be a problem - How can we upgrade Angular - Saravanan
- Possibly in phases - In casablanaca, start removing the vulnerabilities that are maeked as - "Not vulnerable in ONAP" - CLM scan report - portal-Build-20180613-155656.pdf
- Fix pending Fortify issue
- Internationalization language support plan for Casablanca - PORTAL-267 - Leimeng to followup
- Choose language/internal components
- In discussion by larger community (Use Case UI Team), expecting implementation details
- Leimeng has sent email to Tao Shen shentao@chinamobile.com on this topic and is waiing fr his return email
- API Versioning and Backward Compatibility (Technical Debt) - Analysis on pending changes?
- Performance
- Memory usage optimization - Hibernate 4 memory leaks issue
- Split DB, Portal and SDK docker images - build portal and SDK docker images separately from respective jenkins jobs rather than in single jenkins job (which have strong dependency on branch version)
- UI upgrades - Angular, Bower
- Simplify deployment by avoiding the etc/hosts file entries - Sunder to estimate on this
- Logging enhancements - - PORTAL-170Getting issue details... STATUS
- Testing
- CSIT test for new Casablanca features - Sunder to schedule a session to go over the new features.
- Convert ECOMP selenium tests into CSIT ONAP Robot Framework tests - Sunder/Sireesh - Sunder to provide the ECOMP test scripts to Sireesh.
- Enable JavaScript Unit tests. (How will this impact the angular upgrade? Will these unit tests work as is even after upgrade?).
- Code Coverage needs to be improved to 80% on both portal and portal/sdk repos.
- Defect fixes
Beijing Release Planning:
M0 - dev kick-off, Nov 16M1 - planning Jan 16M2 Functionality Freeze→ fill in the contents by Manoop & Leimeng - doneM3 API/Data Model FreezeM4 Code FreezeRC0 ChecklistRC1 ChecklistRC2 ChecklistRelease Delivery