Skip to end of metadata
Go to start of metadata

You are viewing an old version of this page. View the current version.

Compare with Current View Page History

« Previous Version 14 Next »

DRAFT PROPOSAL FOR COMMENTS

The content of this template is expected to be fill out for M1 Release Planning Milestone.


Overview

Project NameEnter the name of the project
Target Release NameCasablanca
Project Lifecycle StateIncubation
Participating Company AT&T, Ericsson, Amdocs, Intel, TechMahindra

Scope

What is this release trying to address?

  • Maintenance of current Platform MVP components (Highest Priority)
    • 50% code coverage (Java and Javascript)
    • Reliability of S3P functionality
    • Security Enhancements to further progress towards Silver badge
      • internal communication encrypted
      • role-based access control and authorization for all calls
  • Auto Scale Out Use Case (High Priority)
    • Implementation of Common Actor API - interface with SO
    • ?
  • HPA Functional Requirement (Medium Priority)
    • Creation of Application that integrates with SDC Service Distribution
      • Must support current API and have hooks to support future Policy Lifecycle API
      • Health Check, CSIT, Dockerized, K8S HELM Chart, S3P, 70% code coverage
  • Re-architecture of the Platform components for long term roadmap (Low Priority)
    • Ingest of Apex PDP engine
      • Health Check, CSIT, Dockerized, HELM Chart, S3P, 70% code coverage
    • PAP 2nd Generation
      • Re-build of PAP ↔ PDP Policy Distribution API using Maven Nexus Repo.
      • Re-build of PAP ↔ PDP Grouping
      • Above 2 requirements will involve creation of PDP SDK (2nd Generation)
      • Policy Lifecycle API
      • Health Check, CSIT, Dockerized, HELM Chart, S3P, 70% code coverage
    • XACML PDP 2nd Generation
      • Configurability of XACML Combining Algorithms for root engine
      • Open support for raw XACML policies
      • Integration with PDP SDK (2nd Generation)
    • Policy Engineer Development Environment
      • Documentation

Use Cases

vFW/vDNS/vCPE/VOLTE - Test only support

Minimum Viable Product

  • Policy Portal Dashboard - Console GUI where Models, Templates can be imported, updated, deleted, as well as, policies can be created, updated and deleted. The console GUI also has a dashboard where PDP's can be grouped and where Operators can control where policies are distributed to.
  • Policy PAP web application - Policy backend that manages communication with PDP engines for policy distribution.
  • Policy Drools PDP - run-time execution of Control Loop operational policies. Supports queries from other ONAP components to retrieve
  • Policy XACML PDP - run-time execution of Control Loop configuration policies of DCAE collectors, analytics and micro services.
  • Policy BRMS Gateway - intermediary backend for distributing policies to the Drools PDP and configuration details to the Drools PDP controller.

Functionalities

List the functionalities that this release is committing to deliver by providing a link to JIRA Epics and Stories. In the JIRA Priority field, specify the priority (either High, Medium, Low). The priority will be used in case de-scoping is required. Don't assign High priority to all functionalities.

Epics

key summary epic name priority assignee
Loading...
Refresh

Stories

key summary priority assignee
Loading...
Refresh


Longer term roadmap

Casablanca will begin development of its new architecture as described in this wiki: The ONAP Policy Framework

Release Deliverables

Indicate the outcome (Executable, Source Code, Library, API description, Tool, Documentation, Release Note...) of this release.

Deliverable NameDeliverable Description
Policy Portal DashboardExecutable
Policy PAP web applicationExecutable

API - internal to the Policy Platform. The Policy PDP engines use this API to synchronize policies being distributed.
Policy Drools PDPExecutable
Policy XACML PDPExecutable

Existing API - external to ONAP components. The API is used to CRUD Policies, Deploy Policies, and query for Policy Decisions.
Policy BRMS GatewayExecutable
MariaDB

SQL database

  • Stores policies and their versions
  • Stores templates/models and their versions
  • Stores PDP grouping information
  • Stores Policy distribution details
Nexus RepoThis repository is used by the Policy Drools PDP to retrieve distributed policies and their dependent jars.
Policy SDC Distribution IntegrationExecutable - receives SDC Service Distribution notifications and translates VNF/Service policies into runtime policies.
Policy Lifecycle API (2nd Generation)Description/Documentation
Policy PAP (2nd Generation)Executable
Policy PDP SDK (2nd Generation)Code Deliverable
Policy Apex PDPExecutable
Policy XACML PD (2nd Generation)Executable

Sub-Components

List all sub-components part of this release.
Activities related to sub-components must be in sync with the overall release.

Sub-components are repositories and are consolidated in a single centralized place. Edit the Release Components name for your project in the centralized page.

Architecture

High level architecture diagram

At that stage within the Release, the team is expected to provide more Architecture details describing how the functional modules are interacting.

Indicate where your project fit within the ONAP Archiecture diagram.

Block and sequence diagrams showing relation within the project as well as relation with external components are expected.

Anyone reading this section should have a good understanding of all the interacting modules.

Platform Maturity

Refering to CII Badging Security Program and Platform Maturity Requirements, fill out the table below by indicating the actual level , the targeted level for the current release and the evidences on how you plan to achieve the targeted level.

AreaActual LevelTargeted Level for current ReleaseHow, EvidencesComments
Performance11Policy R3 Casablanca Platform Maturity
  • 0 -- none
  • 1 – baseline performance criteria identified and measured
  • 2 & 3 – performance improvement plans created & implemented
Stability11Policy R3 Casablanca Platform Maturity
  • 0 – none
  • 1 – 72 hours component level soak w/random transactions
  • 2 – 72 hours platform level soak w/random transactions
  • 3 – 6 months track record of reduced defect rate
Resiliency22Policy R3 Casablanca Platform Maturity
  • 0 – none
  • 1 – manual failure and recovery (< 30 minutes)
  • 2 – automated detection and recovery (single site)
  • 3 – automated detection and recovery (geo redundancy)
Security12 (Stretch goal)Policy R3 Casablanca Platform Maturity
  • 0 – none
  • 1 – CII Passing badge + 50% Test Coverage
  • 2 – CII Silver badge; internal communication encrypted; role-based access control and authorization for all calls
  • 3 – CII Gold
Scalability11Policy R3 Casablanca Platform Maturity
  • 0 – no ability to scale
  • 1 – single site horizontal scaling
  • 2 – geographic scaling
  • 3 – scaling across multiple ONAP instances
Manageability11Policy R3 Casablanca Platform Maturity
  • 1 – single logging system across components; instantiation in < 1 hour
  • 2 – ability to upgrade a single component; tracing across components; externalized configuration management
Usability11Policy R3 Casablanca Platform Maturity
  • 1 – user guide; deployment documentation; API documentation
  • 2 – UI consistency; usability testing; tutorial documentation


  • API Incoming Dependencies

List the API this project is expecting from other projects.
Prior to Release Planning review, Team Leads must agreed on the date by which the API will be fully defined. The API Delivery date must not be later than the release API Freeze date.

Prior to the delivery date, it is a good practice to organize an API review with the API consumers.

API NameAPI DescriptionAPI Definition DateAPI Delivery dateAPI Definition link (i.e.swagger)
Common Actor APIHigh level description of the APIDate for which the API is reviewed and agreedTo fill outLink toward the detailed API description
AAIREST Web Service for AAIBeijing

Control Loop Event MessagesDmaap messages published by DCAE when a Control Loop Event occurs.Beijing

n/a

n/a
APP-CDmaap message LCM API for Restart and ModifyConfigBeijing

SOAPI for auto scaling (for backwards compatibility until Common Actor API is established)Beijing

DMAAPAPI for publish/subscribe to DCAE Control Loop Events and APP-C APIBeijing

  • API Outgoing Dependencies

API this project is delivering to other projects.

API NameAPI DescriptionAPI Definition DateAPI Delivery dateAPI Definition link (i.e.swagger)
Policy Client APIThis API is used by other ONAP components to create, update and delete policy(s).Beijing version - no changesn/aPolicy API
Policy Query APIThis API is used by other ONAP components responsible for enforcing policy during runtime.Beijing version - no changesn/aPolicy API
Policy Lifecycle APIThe new Policy Lifecycle API description, documentation, models, etc.API will be designed and documented over the course of Casablanca. We do not expect our clients to be able to utilize this API in Casablanca.End of CasablancaTBD
  • Third Party Products Dependencies

Third Party Products mean products that are mandatory to provide services for your components. Development of new functionality in third party product may or not be expected.
List the Third Party Products (OpenStack, ODL, RabbitMQ, ElasticSearch,Crystal Reports, ...).

NameDescriptionVersion
MariaDBThe MariaDB is the repository that holds all the policies, templates, PDP group, and deployment information.

10.2.14

NexusThe Nexus repository holds all the currently deployed Operational (i.e. Drools policies) and their dependent artifacts.

2.14.8-01

UbuntuOperating system14.04

In case there are specific dependencies  (Centos 7 vs Ubuntu 16. Etc.) list them as well.

  • Testing and Integration Plans

Provide a description of the testing activities (unit test, functional test, automation,...) that will be performed by the team within the scope of this release.

Describe the plan to integrate and test the release deliverables within the overall ONAP system.
Confirm that resources have been allocated to perform such activities.

  • Gaps

This section is used to document a limitation on a functionality or platform support. We are currently aware of this limitation and it will be delivered in a future Release.
List identified release gaps (if any), and its impact.

Gaps identifiedImpact

Policies that are specific to drools are routed through the PDP-X via BRMSGW.

This is unsustainable long-term as we move to a distributed PDP micro service architecture and need to utilize a Policy Distribution API to groups of PDP's spread out over the installation of ONAP.


BRMSGW hard codes dependencies for policies that are specific to drools.

The long term architecture view is for policy artifacts to be located in a nexus repository that are pulled by appropriate PDP micro service engines. Dependencies would be set in the policy artifact jar files themselves and not hard coded into the platform as a JSON file. Having a JSON file to specify dependencies is a poor implementation architecture and there is no need to re-create Policy artifacts.

Policy template/model/rule development environment is too tightly integrated with the Platform code and is not sustainable in the long term.

The long term vision is for separate of Platform from Policies and the current architecture is too far off in its development to move to this goal.

New policy models require too much development effort for integration with the Policy GUI.

The long term goal was a platform that could ingest policy models organically and not require any development work. The Policy GUI should be to interpret any TOSCA Model ingested and flexibly present a GUI for a user to create policies from.
Policy API is not RESTful and acts more like database query rather than request for a Policy Decision. API also hardcodes models of policies. The long term goal for the architecture which is to be able to create domains for policies and be flexible import models for those domains without any development to the platform.

Policy API does not support Lifecycle management for policies that are deployed such as modes and retirement.

This additional requirement is better suited for the new proposed Policy Lifecycle API than the current API.
  • Known Defects and Issues

Provide a link toward the list of all known project bugs.

key summary type created updated due assignee reporter priority status resolution
Loading...
Refresh

  • Risks

List the risks identified for this release along with the plan to prevent the risk to occur (mitigation) and the plan of action in the case the risk would materialized (contingency).

Risk identifiedMitigation PlanContingency Plan
Not enough resources to meet all the functional requirements.All Epics are assessed a priority.
  • Resources

Fill out the Resources Committed to the Release centralized page.

  • Release Milestone

The milestones are defined at the Release Level and all the supporting project agreed to comply with these dates.

  • Team Internal Milestone

This section is optional and may be used to document internal milestones within a project team or multiple project teams. For instance, in the case the team has made agreement with other team to deliver some artifacts on a certain date that are not in the release milestone, it is erecommended to provide these agreements and dates in this section.

It is not expected to have a detailed project plan.

DateProjectDeliverable
To fill outTo fill outTo fill out
  • Documentation, Training

http://onap.readthedocs.io/en/beijing/submodules/policy/engine.git/docs/index.html


Other Information

  • Vendor Neutral

If this project is coming from an existing proprietary codebase, ensure that all proprietary trademarks, logos, product names, etc. have been removed. All ONAP deliverables must comply with this rule and be agnostic of any proprietary symbols.

  • Free and Open Source Software

FOSS activities are critical to the delivery of the whole ONAP initiative. The information may not be fully available at Release Planning, however to avoid late refactoring, it is critical to accomplish this task as early as possible.
List all third party Free and Open Source Software used within the release and provide License type (BSD, MIT, Apache, GNU GPL,... ).
In the case non Apache License are found inform immediately the TSC and the Release Manager and document your reasoning on why you believe we can use a non Apache version 2 license.

Each project must edit its project table available at Project FOSS.


Charter Compliance

The project team comply with the ONAP Charter.

  • No labels