We will use vFW use case as the baseline to test this:
Pre-requirement: Instantiate a vFW with closed loop running.
VNF Onboarding and Distribution:
VNF Instantiation:
Closed Loop:
Requirement
Area | Priority | Min. Level | Stretch Goal | Level Descriptions (Abbreviated) |
Resiliency | High | Level 2 – run-time projects | Level 3 – run-time projects | •1 – manual failure and recovery (< 30 minutes) |