Skip to end of metadata
Go to start of metadata

You are viewing an old version of this page. View the current version.

Compare with Current View Page History

« Previous Version 3 Next »

Functional Requirements 

Functional RequirementsOwner

Projects Impacted

for Casablanca

Link(s) to High Level Design (HLD) /Low Level Design (LLD) (if any)

Priority

(from SP perspective)?

Dependency (from/to) another project(s)



T-Shirt Size (XS, S, M, L, XL)*Project's Impact: Test Only (TO), Code (C)Committed (C)/Partially Committed (P) or not (N) per Impacted projectsIf Partially or not Committed, then what are the gaps per impacted project (people/FTEs; HLD/LLD; etc)Company EngagementNotes
Defining and Modeling Control Loop for LCM Operations
Volunteer?
Control Loop Sub Committee


Control Loop for LCM Operations











Event based Common API for Control Loop Operations

Pamela Dragosh

Control Loop Sub Committee

Policy

CLAMP

SO

APPC










Ease of creating analytic components and on-boarding DCAE micro services
Volunteer?
Control Loop Sub Committee

SDC (DCAE-DS)

CLAMP

DCAE

POLICY










vFirewall Use Case Upgrade
Volunteer?
Control Loop Sub Committee

CLAMP

POLICY

APPC










  • No labels