Skip to end of metadata
Go to start of metadata

You are viewing an old version of this page. View the current version.

Compare with Current View Page History

« Previous Version 6 Next »


Test Cases description


TC IDTC NameStatusComment
TC1

Authenticate Connection

Staging : PASS / Release : NO RUN


TC2NF sends Real Time PM event and HV-VES Collector validates Event

Staging : PASS / Release : NO RUN


TC3

Publish Event

Staging : PASS / Release : NO RUN


TC4

Topic Content Validation

Staging : PASS / Release : NO RUN


TC5Topic Content Validation (stretched goal)

NOT TESTED


TC6

Additional Test Case for Performance (PNF High Volume Simulator sends N correct messages.
DCAE Analytics application should consume N messages from DMaaP Kafka)

NOT TESTED


TC7

Additional Test Case for Performance (PNF High Volume Simulator sends N1 correct messages,
N2 incorrect due to wrong domain, N3 correct ones.
DCAE Analytics application should
consume N1+N3 messages from DMaaP Kafka)

NOT TESTED


TC8Additional Test Case for Performance  (PNF High Volume Simulator sends N1 correct messages,
N2 incorrect due to wrong wireprotocol, N3 correct ones. DCAE Analytics application should
consume N1+N3 messages from DMaaP Kafka)

NOT TESTED


TC9Additional Test Case for Performance (PNF High Volume Simulator sends N1 correct messages,
N2 incorrect due to undecodable GPB, N3 correct ones. DCAE Analytics application should
consume N1+N3 messages from DMaaP Kafka)

NOT TESTED


TC10Additional Test Case for Performance (PNF High Volume Simulator sends N1 correct messages
wherein one message have to big GPB payload.  DCAE Analytics application should consume
less then N1 messages from DMaaP Kafka. Verify if HV-VES has disconnected from such PNF)

NOT TESTED


  • No labels