The content of this template is expected to be fill out for M1 Release Planning Milestone.
Info
Use the "Copy" and "Move" options (available under the ..., top right of this page) to duplicate this template into your project wiki.
Use the Wiki to document the release plan. Don't provide PowerPoint.
Use as much diagrams and flow charts as you need, directly in the wiki, to convey your message.
- 1 Overview
- 2Scope
- 3Release Deliverables
- 4Sub-Components
- 5Architecture
- 6Testing and Integration Plans
- 7Gaps
- 8Known Defects and Issues
- 9Risks
- 10Resources
- 11Release Milestone
- 12Team Internal Milestone
- 13Documentation, Training
- 14Other Information
Overview
Project Name | Enter the name of the project |
---|---|
Target Release Name | Jakarta |
Project Lifecycle State | Mature |
Participating Company | China Mobile, Huawei, China Telecom |
Scope
What is this release trying to address?
Describe the problem being solved by this release
The Usecase-UI Jakarta release has following primary objectives:
- IBN module: A common user interface for CCVPN, E2E Slicing and other usecases by intent-based service.
- IBN module: A common data set for NLP training.
- IBN module: Enhancing the NLP algorithm and model for more accurate intent translation. .
- “Network/ccvpn-network” module: Ability to display underlay L1 network topology and resource utilization status.
- “Network/ccvpn-network” module: Ability to display installation and configuration for each OTN tunnel.
2. UUI enhancement and new features:
- Upgrade postgresql - USECASEUI-4052 components in one Docker 处理中
- Modify UUI certificates USECASEUI-594 - UUI certificates are not correct
- Modify returning coverageAreaTAList for AN slice profile USECASEUI-618 - Fix issue in returning coverageAreaTAList for AN slice profile
Requirements
Describe the use case this release is targeted for (better if reference to customer requirements).
- Network Services without Perception for Users based on IBN REQ-1075.
- Display CCVPN Network Topology and Tunnel Installation in R10 REQ-1103.
Minimum Viable Product
Usecase-UI will include the necessary subcomponents supporting the primary objectives: supporting the use cases and meeting platform maturity goals.
- A common user interface for CCVPN, E2E Slicing and other usecases by intent-based service;
- A common data set for NLP training;
- Enhancing the NLP algorithm and model for more accurate intent translation;
- Monitoring page: Ability to display underlay L1 network topology and resource utilization status; Ability to display installation and configuration for each OTN tunnel.
Functionalities
List the functionalities that this release is committing to deliver by providing a link to JIRA Epics and Stories. In the JIRA Priority field, specify the priority (either High, Medium, Low). The priority will be used in case de-scoping is required. Don't assign High priority to all functionalities.
Epics
Stories
Bugs
Longer term roadmap
Indicate at a high level the longer term roadmap. This is to put things into the big perspective.
Release Deliverables
Indicate the outcome (Executable, Source Code, Library, API description, Tool, Documentation, Release Note, etc) of this release.
Deliverable Name | Deliverable Description |
---|---|
Source Code | Source code for all UUI components |
Maven Artifacts | Maven Artifacts for all UUI components |
Docker Containers | Docker container associated with UUI components |
Documentation | UUI detailed documentation |
Sub-Components
List all sub-components part of this release.
Activities related to sub-components must be in sync with the overall release.
Sub-components are repositories and are consolidated in a single centralized place. Edit the Release Components name for your project in the centralized page.
Architecture
High level architecture diagram
At that stage within the Release, the team is expected to provide more Architecture details describing how the functional modules are interacting.
Indicate where your project fit within the ONAP Architecture diagram.
Block and sequence diagrams showing relation within the project as well as relation with external components are expected.
Anyone reading this section should have a good understanding of all the interacting modules.
Block and sequence diagrams showing relation within the project as well as relation with external components are expected.
Anyone reading this section should have a good understanding of all the interacting modules.
Platform Maturity
Please fill out the centralized wiki page: Jakarta Release Platform Maturity
API Incoming Dependencies
List the API this project is expecting from other projects.
Prior to Release Planning review, Team Leads must agreed on the date by which the API will be fully defined. The API Delivery date must not be later than the release API Freeze date.
Prior to the delivery date, it is a good practice to organize an API review with the API consumers.
Prior to the delivery date, it is a good practice to organize an API review with the API consumers.
API Name | API Description | API Definition Date | API Delivery date | API Definition link (i.e.swagger) |
Portal Platform API | API for integration of portal applications | |||
Catalog API (SDC) | API to read the NS and VNF Catalog | |||
SO API(Modeling) | API for NS instantiation and termination | |||
MSB API | API for registration and use of micro-services bus | Microservice Bus API Documentation | ||
A&AI API | API for getting inventory and image management | AAI REST API Documentation | ||
VF-C API | API for NS instantiation and termination | |||
DataLake API | API for FCAPS (VNF/VM monitoring) | |||
External API | API for external data |
API Outgoing Dependencies
None
Third Party Products Dependencies
None
Testing and Integration Plans
Usecase UI Jakarta - Functional Test Cases
Gaps
This section is used to document a limitation on a functionality or platform support. We are currently aware of this limitation and it will be delivered in a future Release.
List identified release gaps (if any), and its impact.
Gaps identified | Impact |
---|---|
To fill out | To fill out |
Known Defects and Issues
Please refer to Frankfurt Defect Status
Risks
List the risks identified for this release along with the plan to prevent the risk to occur (mitigation) and the plan of action in the case the risk would materialized (contingency).
Please update any risk on the centralized wiki page - Jakarta Risks
Resources
Fill out the Resources Committed to the Release centralized page.
Release Milestone
The milestones are defined at the Release Planning: Jakarta and all the supporting project agreed to comply with these dates.
Team Internal Milestone
This section is optional and may be used to document internal milestones within a project team or multiple project teams. For instance, in the case the team has made agreement with other team to deliver some artifacts on a certain date that are not in the release milestone, it is erecommended to provide these agreements and dates in this section.
It is not expected to have a detailed project plan.
Date | Project | Deliverable |
---|---|---|
To fill out | To fill out | To fill out |
Documentation, Training
Please update the following centralized wiki: Jakarta Documentation
That includes
- Team contributions to the specific document related to he project (Config guide, installation guide...).
- Team contributions to the overall Release Documentation and training asset
- High level list of documentation, training and tutorials necessary to understand the release capabilities, configuration and operation.
- Documentation includes items such as:
- Installation instructions
- Configuration instructions
- Developer guide
- End User guide
- Admin guide
- ...
Note
The Documentation project will provide the Documentation Tool Chain to edit, configure, store and publish all Documentation asset.
Other Information
Vendor Neutral
If this project is coming from an existing proprietary codebase, ensure that all proprietary trademarks, logos, product names, etc. have been removed. All ONAP deliverables must comply with this rule and be agnostic of any proprietary symbols.
Free and Open Source Software
FOSS activities are critical to the delivery of the whole ONAP initiative. The information may not be fully available at Release Planning, however to avoid late refactoring, it is critical to accomplish this task as early as possible.
List all third party Free and Open Source Software used within the release and provide License type (BSD, MIT, Apache, GNU GPL,... ).
In the case non Apache License are found inform immediately the TSC and the Release Manager and document your reasoning on why you believe we can use a non Apache version 2 license.
Each project must edit its project table available at Project FOSS.
Charter Compliance
The project team comply with the ONAP Charter.