Wiki to the "Base" PNF Plug and Play Page: 5G - PNF Plug and Play
DEVELOPMENT IMPACTS
PROJECT | PTL | User Story / Epic | Requirement |
A&AI | |||
AAF | |||
APPC | |||
CLAMP | |||
CC-SDK | Epic#1: Controller to PNF exchange (Epic) STEP 37 | Epic #1:
| |
DCAE | Epic #2: Adjust VES collector to SECCOM requirements | Epic #2: | |
DMaaP | |||
External API | |||
MODELING | Epic #2: Geolocation parameters | Epic #2:
| |
Multi-VIM / Cloud | |||
OOF | Shankaranarayanan Puzhavakath Narayanan | ||
POLICY | |||
PORTAL | |||
SDN-C | |||
SDC | Epic #6: CDS Integration with SDC (Low priority) | ||
SO | Epic #3: SO Building Blocks. | E#3a: Change to the onboarding (definition) of the BPMN workflow. To bring war file with the workflow. E#3b: Migrate existing workflows to existing building blocks. - SO-2556Getting issue details... STATUS Need to sync on the VID implementation of 5G VID Instantiation/orchestration. | |
VID | Epic #3: SO Building Blocks | Need to sync on the VID implementation of 5G VID Instantiation/Orchestration. VCPE also wants to use these building blocks, a fully generic solution is desired here. | |
VNFRQTS | |||
VNF-SDK |
List of PTLs: Approved Projects
EPIC / REQ
The Plug and Play Epic for R6 Frankfurt is Jira REQ-134 :
- REQ-134Getting issue details... STATUS
DCAE
Frankfurt Work Item | DESCRIPTION |
---|---|
DCAE2: Adjust VES collector to SECCOM requirements | Secure VES collector - make sure client certificate authentication (together with Basic authentication) is default authentication method (according to SECCOM requirements). OPEN: Use Cert w/ border components (not in R6). Modified config of VES collectors option #1/#2. Cnfg "set basicauth" and "noauth" (refactored) |
SO IMPACTS
AssignPnfBB
- Responsibility: Creates PNF entry in A&AI
- Makes a link in AAI between service entry and PNF entry
- currently implemented in CreateAndActivatePnfResource.bpmn
WaitForPnfReadyBB
- Responsibility: Waits for "PNF ready" event sent from PRH to DMaaP
- Currently implemented in CreateAndActivePnfResource.bpmn
ConfigAssignPnfBB
- Responsibility: Runs config assign via CDS
- Currently implemented in ConfigurePnfResource.bpmn
ConfigDeployPnfBB
- Responsibility: Runs config assign via CDS
- Currently implemented in ConfigurePnfResource.bpmn
SO PNF PNP migration is being documented: https://wiki.onap.org/display/DW/PNF+PnP+workflow+migration+to+Building+Blocks
The JIRA to track progress: https://jira.onap.org/browse/SO-2556.
Lukasz Grech and Lukasz Muszkieta (Nokia) are leading the SO changes related to migration of PNF PnP sub-flows (sub-Processes_ to building blocks.
This link is about the current (Dublin + El Alto) implementation: https://wiki.onap.org/display/DW/PNF+PNP+workflow+-+current+implementation
The SO BPMN code can be found at CreateAndActivatePnfResource.bpmn.
This is where the implementation is stored today.
Also refer to the following topic in Gerrit: pnf_bb
https://gerrit.onap.org/r/#/q/status:merged+project:so+branch:master+topic:pnf_bb
This is where other changes expected for the PNF PnP BBs are expected to be added.
A few building blocks will be created in R6 (expected by end of February 2020).
The currently available workflows dealing for PNF PnP can be seen at the PNF PnP test-cases descriptions in the ONAP Integration project.
VID IMPACTS
R6 ITEM | DESCRIPTION |
---|---|
VID1 Migration of Sub-worksflows (Post-poned to R7) | Migration of existing PNF PnP sub-workflows to a new BB approach (probably we will be creating 4-5 new BBs). VID Impact: Within “old” VID macro orchestration pages, a special field to provide a pnf-id parameter (shall be actually called “correlationID” or “PNF correlationID”) has been displayed under the following conditions:
When we migrate to BB approach, we`d keep the possibility to provide this parameter (PNF correlationID) to the SO API call as input. How this will change with SO/BB approach, and with new VID GUI targeted at macro (GR) flows – we`d see exactly, after we execute some tests with new VID UI, and updated SO PNF BB code. In R6: only accessible via SO API not the VID GUI, E2E tests prepare environment cover case w/ SO API. |
CONTROLLER IMPACTS
PnP R6 WORK ITEM | DESCRIPTION |
CTL1: Controller PNF Interaction | [CONTROLLER] Controller definition (SDN-C) came so late in Casablanca, we had defined some additional optional parameter for the step37 Service Configuration but likely more evolution needs to be done. SDN-C was not the theoretical proper controller and people objected as this is conceptually the L0-L3 controller. [STEP 35-37] - The SO to SDN-C and Controller to PNF exchange (Ansible or NetConf) was a carry-over item from R3. This requires that an API between SO to SDN-C is in place to support this. It requires that SDN-C support the appropriate Ansible Playbook and Directed Graph. Generic API. CDS has its own API to SO. The work being done with the CDS work is re-used for PnP U/C, so no new development needs to be done. ASSOCIATED DEVELOPMENT: (Jira) Controller Design Studio (Design Time) - to customize configuration. This might be used to set the values of parameters that might be send down to a PNF. NetConf - see the NetConf 5G U/C Wiki: 5G - Configuration with NETCONF |
PRH IMPACTS
PnP R6 Frankfurt Work Item | DESCRIPTION |
---|---|
BBS Event Processing Micro-Service
PnP R6 Frankfurt WORK ITEM | DESCRIPTION | ||||||||
PRH(discuss): Step 37a PNF "Activated" message to ONAP BBS event processing micro-service. (Being done by the BBS U/C team) Post-poned to Rx | State Change VES Event (type = State Change) Old state & New State. CPE Authentication Notification BBS U/C is using this flow to "update" ONAP letting ONAP know that the PNF has been successfully been activated. From VES Event Listener Document:
R6 - No Changes. BBS will test what was there, will do re-test in R6. |
A&AI IMPACTS
R6 ITEM | DESCRIPTION |
A&AI2: External Manager (EMS/NMS) [ESR] | [A&AI] IP address or association with the External Manager. Is the ESR concept sufficient? https://onap.readthedocs.io/en/beijing/submodules/aai/esr-server.git/docs/ During PnP, the IP address of the External Manager would saved/stored or set by user or by the PNF. Where would that be stored? would it be in A&AI. Information about the External Manager is discovered & stored. Note: The External Manager info is optional LOW PRIORITY |
A&AI3: Cloud Home Server (A&AI) | [A&AI] Tracking the Cloud Home Server (CLLI, Cloud ID); is the association with the COMPLEX Object sufficient? How-To: Register a VIM/Cloud Instance to ONAP LOW PRIORITY |
A&AI / Model MODELING | [A&AI] GeoLocation information for the PNF reported via pnfRegistration VES Event This will ONLY be modeling work in R6, functionality it moved to future release MODELING WORK ONLY |
A&AI4: A&AI pnf-id as INDEX for PNF CANCELED | [A&AI] New A&AI schema adaptations: discrepancy between PNFs and VNFs; VNFs are identified via VNF-ID (UUID), and PNFs - via PNF-name. PNF-id should be used for Identities. This differentiates the way that PRH is searching for PNFs in A&AI, when PRH does the PNF registration in A&AI (may also require SO change). July 31th 2019 → AAI team has cancelled this request (redacted). CANCELED |
MODEL IMPACTS
R6 ITEM | DESCRIPTION |
Model | [Modeling] GeoLocation alignment in Modeling with RFC 6225 and the PNFD, A&AI schema, and SDC AID Data model. (Sept 5) "Place" object (off of the Root) platform ONAP info-model. GB922 Location standards Latitude/ Longitude / Altitude (RFC 6225) > TMF GB922 > ONAP > Complex & Place object. LOW PRIORITY (Nice to have) |
SUPPORTING FILES & PRESENTATIONS
Presentation | File |
---|---|
Presentation for Epic #4: Secure Communication between xNFs & ONAP | |
Slides for SO work (Generic SO BBs for PNFs) | |
Presentation given at the DDF (Prague Jan 13-16) https://wiki.lfnetworking.org/pages/viewpage.action?pageId=25364127 | |
MEETINGS & RECORDINGS
DATE | TOPIC | WIKI |
---|---|---|
| Discussion of Geolocation / PNFD/ Civic Address parameters | PNF: PnP - PNFD/SDC AID/AAI Schema Modeling - for GeoLocation |
| Discussion of Modeling | PNF: PnP - PNFD/SDC AID/AAI Schema Modeling - for GeoLocation Discussion Sept 5 2019 |
| Discussion of Civic Address / Place-Location Model | PNF: PnP - PNFD/SDC AID/AAI Schema Modeling - Discussion Oct 3 2019 |
| Presentation of Place concept Model | PNF: PnP - PNFD/SDC AID/AAI Schema Modeling - Discussion Nov 7, 2019 |
| Discussion of 5G Service Model analysis from 3GPP TS28.541 | PnP - PNFD/SDC AID/AAI Schema Modeling - Discussion Dec 12, 2019 |
| Review of Items | PnP - PNFD/SDC AID/AAI Schema Modeling - Discussion Jan 2, 2020 |
| Team discussion | PNFD/SDC AID/AAI Schema Modeling - Discussion Mar 26, 2020 |
| Team Discussion | PNFD/SDC AID/AAI Schema Modeling - Discussion Apr 2, 2020 |
REFERENCES
- DCAEGEN2-1775Getting issue details... STATUS
INTEGRATION & TESTING
This section discusses the Testing & Integration for R6 PnP
- WHO IS TESTING - what company, team, and people will be doing the testing & responsibilities for testing.
- TEST ENVIRONMENT - which does the lab & test environment.
- RESOURCES NEEDED - what resources are needed.
- WHO IS CONTRIBUTING RESOURCES - what resources will be provided and by whom/what company.
- NETWORK CONNECTIVITY - How will a PNF make connectivity to ONAP DCAE VES Event Listener
- TEST/INTEGRATION LEADER - Marcin Przybysz
- INTEGRATION LEAD DEFINITION - ONAP "Use Case/Requirement" Integration Lead
PNF PnP Integration Test Cases. These can be navigated to from the Integration team page hierarchy.
5G - PNF PnP - Integration Test Cases
Testing Status
Dublin 5G - PNF PnP - Test Status
DEMOS
Demo | File/Recording |
---|---|
ONAP/ ORAN Plugfest Demo for Plug and Play (Brunswick NJ - Rutgers OWL WinLab) | |
ONAP/ ORAN Plugfest Slides for Plug and Play Presented at ONAP Plugfest
| |