Agenda
We should plan for Dublin scope - therefore next meeting we can review the prioritized list of epics to present to the architecture subcommittee. There is a meeting in montreal later this month we will do this.
- RC0 Release work
- in prep of the RC0 release - the jenkins jobs are blocking on any remaining snapshot artifact so...
Prudence and I are releasing all the artifacts in logging and POMBA working our way down the dependency tree - Release artifacts to nexus2 - see Logging Release Management
- 1.2.2. release started - next version 1.4.0-SNAPSHOT for dublin - will branch - https://gerrit.onap.org/r/#/c/69618/1
- CLM critical fixes (was 8 down by 1)
- CLM critical issues are being fixed, the logback library was updated thu
- https://gerrit.onap.org/r/#/c/69415/ logback 1.1.3 to 1.2.3
- CLM critical issues are being fixed, the logback library was updated thu
- pairwise testing
- Logging Pair Wise Testing for Casablanca Release
- POMBA Pair Wise Testing for Casablanca Release
- contrib/netbox is disabled again by default - https://gerrit.onap.org/r/#/c/69593/
- filling out Integration Weather Board for Casablanca Release - put link to live CD healthcheck
- Healthcheck - hourly minimal deploy of logging, pomba and robot
- in prep of the RC0 release - the jenkins jobs are blocking on any remaining snapshot artifact so...
- Development work
- logback.xml changes - testing now - https://gerrit.onap.org/r/#/c/62405/
- merge Luke's template for parameterization
- minor lag (hours) issue between gerrit/git - need to post to LF - https://git.onap.org/logging-analytics/pomba/pomba-audit-common/tree/version.properties
- queue
- single logback
- logging library retrofit of portal/sdk
- remove filebeat sidecars in favour of /var/lib/docker/ logs
- JIRA board
- Gerrit merges
- POMBA
- healthcheck for 3 containers in last wed https://gerrit.onap.org/r/#/c/68529/ will do kibana later this week
- pomba healthcheck failures from friday fixed late monday (raised at PTL meet monday) - were due to out of order oom/pomba merges
- https://lists.onap.org/g/onap-discuss/topic/cd_server_live_for_pomba_or/26570435?p=,,,20,0,0,0::recentpostdate%2Fsticky,,,20,2,0,26570435
- To assist the LF with a post merge JobBuilder step for CD I reenabled the system at jenkins.onap.info, kibana.onap.info:5601
Notes
- todo