Kohn Risks

This centralized page, for all Kohn projects, is aimed at identifying the risks as they are foreseen within the release life cycle.

A Risk that materialized becomes an Issue.

Status:

  • Identified: a risk that has been identified, but has not yet been analyzed / assessed yet 

  • Assessed: an identified risk which currently has no risk response plan 

  • Planned: an identified risk with a risk response plan

  • In-Process: a risk where the risk response is being executed 

  • Closed: a risk that occurred and is transferred to an issue or the risk was solved/avoided

  • Not occurred: a risk that was identified but that did not occur 

  • Rejected: created and kept for tracking purposes but considered not to be used yet



Risk ID

Project Team or person identifying the risk

Identification Date

Risk (Description and potential impact)

Team or component impacted by the risk

Mitigation Plan

(Action to prevent the risk to materialize)



Contingency Plan - Response Plan

(Action in case of the risk materialized)

Probability of occurrence (probability of the risk materialized)

High/Medium/Low

Impact

High/Medium/Low

Status

Notes

Risk ID

Project Team or person identifying the risk

Identification Date

Risk (Description and potential impact)

Team or component impacted by the risk

Mitigation Plan

(Action to prevent the risk to materialize)



Contingency Plan - Response Plan

(Action in case of the risk materialized)

Probability of occurrence (probability of the risk materialized)

High/Medium/Low

Impact

High/Medium/Low

Status

Notes

1

CPS

Jul 7, 2022 

Scope creep in work item #1 (state handling) (CPS R11 Release Planning#CPS-CORE/CPS-NCMPRequirements) corresponds to a delay in other work items such as #4 (reading data (single CM handle, synchronous only)

CPS

Better up front analysis of requirements and breakdown of jiras 

Move some tasks to future work items to ensure timely finish of work item

High

Medium

Identified



2. 

DCAE 

Jul 11, 2022 

REQ-1211  - COMPLETION OF JAVA LANGUAGE UPDATE (v8 → v11)

dcaemod-designtool & dcaemod-nifi-registry has dependency on upstream (NiFI) project which is currently on java8

DCAE

Continue current version for Kohn and assess /plan component (MOD) retirement for London release

Extend the Waiver/Exception filed for Kohn release

High

Low

Identified

07/11/22 - To be discussed with SEECOM on waiver extension

3

AAI

Jul 12, 2022  

Lack of resources to deliver Kohn high bugs/issues & global requirements

REQ-1207 

REQ-439

REQ-441

AAI-3494: PACKAGES UPGRADES IN DIRECT DEPENDENCIES FOR KOHNClosed

AAI-3292: fix CRITICAL weak-cryptography issues identified in sonarcloudIn Progress

AAI

Make best efforts to resolve the global requirements and high issues

Raise an exception for this release and make best efforts to resolve

High

Low





4

AAI

Jul 12, 2022  

Janusgraph does not support Java 11

REQ-438 - COMPLETION OF JAVA LANGUAGE UPDATE (v8 → v11)

AAI

Not much we can do

repos affected: aai-common, aai-graphadmin, aai-resources, aai-traversal

Raise an exception for this release and hope janusgraph supports java 11 in the coming release

High

Low





5

POLICY

Jul 13, 2022  

Very limited resources are available to deliver the Policy for the 5G SON use case, see POLICY-4108: Control Loop Policy for A1-based action for SON Use CaseClosed

POLICY

If the amount of work is small, we can take the work during routine maintenance activities.

Use the existing policy and try to secure resources in future releases.

Low

Medium

Identified

Discussed with the 5G SON team

6

OOM & Integration

Jul 20, 2022 

no PTL on both projects for this release

OOM & Integration

Ask community for Someone to take over the PTL roles

TBD

High

High

Identified



7

DCAE 

Aug 11, 2022 

Due to recent changes in resource availability from Huawei India team, DCAE Kohn commitments have to be reprioritized and adjusted.

DCAE

Make best efforts to resolve the key requirements and high priority issues

Defer impacted features/Jira to next release

High

Medium

Identified



8

DCAE 

Sep 6, 2022 

New ML MS introduction under  REQ-1215 E2E Network Slicing use case enhancements  is under risk due to pending build issues and code refactoring resolution

DCAE

Make best efforts to resolve the open issues; logged LF ticket IT-24493 for troubleshotting jenkins issue

Proceed to merge once latest updates are verified successfully (both tox and docker execution); jenkins job error resolution can be worked in-parallel through LF ticket

High

Medium

Identified