Closed Loop Control

Slides: Use case 2 in Netsia_O-RAN_ONAP_RAN_Slicing_UseCases_23_07_20_v2.pptx.



Remarks

  1. In Guilin release, the update in the Policy shall also be communicated from ONAP to O-RAN using O1 interface. Beyond Guilin, it will be updated to A1.

  2. In addition to the PM data described in the ppt, the foll. data may also be used - ref. 3GPP TS 28.552 v16.5.0:

    • Number of octets of incoming GTP data packets on the N3 interface, from (R)AN to UPF (Core, from UPF) (Section 5.4.1.3)

    • Number of octets of outgoing GTP data packets on the N3 interface, from UPF to (R)AN (Core, from UPF) (Section 5.4.1.4)

  3. The Slice Analysis MS shall be responsible for performing all the necessary analysis.