5G Use Case Meeting notes for Apr 30, 2020

5G Use Case Meeting notes for Apr 30, 2020

Meeting Time (Mar-Oct 11AM GMT 3PM)

Apr 30, 2020

Attendees

  • @Benjamin Cheung

  • @Vimal Begwani

  • @Zu Qiang

  • @SALVATORE RICCI

  • Marge Hillis

  • Xuan Thuy Dang

  • @Bob Papa

  • @Joanne Liu Rudel

  • -

Discussion items

Item

Who

Notes

Item

Who

Notes

Discussion this week 

  1. READ THE DOCS - Mar 4 2020 U/C Realization. Intention by docs team to move all the wiki pages into the readthedocs. Sofia will talk again at a U/C realization call. Create Jira ticket in Integration Project / In Integration project FOLDER / update RST file (on RST file per Use Case). @Andreas Geißler suggested making Use Case Repo for U/C Documents.

  2. Architecture S/C Presentations - for R7 Req/UCs - "Due by M1" ~Mid June 2020

  3. 5G U/C wikis moving under Architecture directory Tree - (Done)

  4. VF2F Slides for 5G team - @wangyaoguang should submit to the R7 should we redact the R7 work (Status Update)

  5. R6 Moved out by 1 week (June 4 2020)

Release 7 GuiLin Release

All in 5G U/C team

R7 GuiLin Requirements & Proposals -

TIMELINES: R7 GuiLin Release M0 - April 22/23 (may shift due R6)

Requirements S/C page: Requirements subcommittee

R7 new requirements, currently proposals in R7: Guilin release - functional requirements proposed list

Take a R7 - example page.

PNF & 5G USE CASES/REQUIREMENTS:

Guilin release - functional requirements proposed list#E2ENetworkSlicing

Guilin release - functional requirements proposed list#SupportxNFSoftwareUpgradeinassociationtoschemaupdates

Guilin release - functional requirements proposed list#OOF-SON:5GSelf-OrganizingNetwork(SON)usingONAPOptimizationFramework(OOF)

Guilin release - functional requirements proposed list#RunTimeConfigurationDatabase/DataPersistencyServiceProject

ORAN-ONAP Harmonization Use Case (needs Placeholder) - Needs 3GPP approval (April/May) → Sync Marge & Vimal → pending meeting to add R7 req proposal. → new specification from ORAN

CMPv2 work → Proposal to be presented Apr 6, 2020 

PNF Plug and Play → Added Req Proposal will be presented Apr 6, 2020 

PNF Onboarding / Pre-onboarding → Added proposal → present on Apr 6, 2020 

5G Service Modeling (Modeling) → Continue modeling work → present Apr 6, 2020 

Licensing Management (Modeling/Arch) → R7 need to plan contribution.

5G Bulk PM / RT PM / PM Dictionary → R7 align to 3GPP specification RT PM meta-data, changes to collector. PM Control Data Extension

5G FM - (1) 3GPP standards & VES , (2) A1 Adaptor Extensions→ R7 possible FM updates.

5G NRM

R6 Frankfurt

M4 / RC0 Deadline Deliverables

All in 5G U/C

RC0-2 for R6 Deliverables

R6 Frankfurt Release: Frankfurt Milestone Status

Release Planning Page: Release Planning

M1 Deliverables Checklist: Deliverables for Planning Milestone Checklist Template

Deliverables by Milestone: Frankfurt Deliverables by Milestone

 

M4 Deliverables:

  • Code Freeze. Mark the end of the Features coding.

  • JIRA ISSUES - Jira issues are either fixed in the current release or assigned to next release.

  • AUTOMATED - 100% of Functional Test Case are automated.

  • INTEGRATION & TESTING - End 2 End Release Test Cases are implemented (Integration Team).

  • All new VNF Requirements planned for the release reviewed and  implemented in VNF Requirements project.

  • Documentation

(CONTINUOUS) - DOCUMENTATION - Documentation (Read the Docs) - M1 - M4

"Are you referring to MS1 and the preliminary documentation?

https://lf-onap.atlassian.net/wiki/display/DW/Frankfurt+Documentation

This is mainly relevant to new projects. The link that you provided below covers that, since the 5G use case team is not a new project, your documentation is already published on RTD."

  - Gerrit Files, Gerrit Review, Main Branch, Update file, create Gerrit Review,

RC0 Mar 26, 2020  RC1 Apr 9, 2020  RC2 Apr 23, 2020 

Project Team focused its effort on:

  1. supporting integration testing

  2. closing high priority defects

  3. supporting Documentation team

CONFERENCES & DEMOS

All in 5G U/C

CONFERENCE

PLUGFEST

  • POC & Plugfest in End June 2020 - BRONZE Release of ORAN.

  • WINLAB? A1/O1 ORAN & ONAP Joint Plugfest.

  • @Tracy Van Brakle  @Martin Skorupski  @Marci Haas

  • Panel Discussion - // Possibly planned for Feb 2020.

CONFERENCES

April 20-21 Open Network & Edge Summit (ONES) - Los Angeles - GuiLin R7 (Planning).

April 21-23

https://wiki.lfnetworking.org/display/LN/2020+April+Virtual+Technical+Event

  Virtual Technical Event

Early June DDF - (GuiLin R7)

ACTION: Will remote presentations be possible, links to remotely attend? When is final schedule up.

Configuration & Persistency Service

 

@Joanne Liu Rudel

@Benjamin Cheung

Architecture S/C presentation for Run Time DB.

Team is working to define the Proposal (see wiki).

Then it will be presented at the Arch S/C and then TSC.

Sync with Sandeep - will meet with Sandeep Fri 7 2020. Ted Johnson. Existing interface.

For R6, will be part of CC-SDK. Met with @Yuriy Malakov  & @Dan Timoney . CONFIGURATION & PERSISTENCY SERVICE not a separate component in R6.

CMNotify - The DCAE, CMNotify VES event (proper) are pushed to R7

  • STEP 1 GENERATE: xNF (RAN Simulator) GENERATES a VES CMNotify - Wipro SON (R6)

  • STEP 2 RECEIVES: DCAE VES Collector RECEIVES the CMNotify - Nokia (R7)

  • STEP 3 DCAE: DCAE PROCESSES Event- Nokia (R7)

  • STEP 4 DMaaP: DCAE PUBLISHES onto DMaaP - Nokia (R7)

  • STEP 5 LISTEN: CCSDK (Controller) LISTENS to DMaaP - SandeepShah (R6)

  • STEP 6 RTCfgDB: RTCfgDB UPDATES with info - SandeepShah / Techmahindra Devendra Chauhan (R6)

Feb 3-7 Nokia has confirmed that Step 2/3/4 is in R7 due to VES review.

Meeting setup with Sandeep - R7 planning. Need to make a presentation for Alla's call: ONAP Use Case / Requirements Teams Process Way of Working (WoW)

R7 - Decide if we can to be a separate component. need to find a PTL lead. Feb 14, 2020 

Automation tool integration. Schema details.

Q#1 (Seshu) RunTime Catalog in CCSDK vs DPS - they are different & have different purposes. Reuse of existing database.

Q#2 questions controller have config data why isn't that sufficient why can't we store this in A&AI.

 "Source of truth" - controller would be allowed to change / update info for Configdata others Read.

Catalog/  model driven Use Case onboarding package, SO not impacted.

Q#3 - why don't we have this as part of A&AI in Eric Debeau - storing not just inventory, but configuration information and additional information. multiple persona a common data is more elegant than each controller having its own database. 35 databases in ONAP.

Q#4 - structured database / justify the technology selected for this work.

Q#5 - Roadmap of functionality

Q#6 - scalability / performance need queries are not complicated & volume of information will not be as high performance - performance

Read the Docs entry https://onap.readthedocs.io/en/latest/submodules/integration.git/docs/docs_usecases.html navigate to USER GUIDES > VERIFIED USE CASES.

Network Slicing R6 Proposal

@Borislav Glozman

Shankar PN

@Swaminathan Seetharaman

@LIN MENG

Update on slicing proposal. SO/Seshu presented.

Multiple functional requirements/Use Cases. Recursive orchestration of nested services. Didn't want independent W/F for flows but try to leverage/reuse work. Presented the End to End U/C with macro-view for E2E slice. and components impacted. Right now impact will be on SO, OOF, Policy, SDC and AAI. What controller will be used for managing slices? Focusing on design aspects and instantiation and activation. Put up logical E2E slice. Target simple VNFs. Focus to create VNF vs reconfiguring a VNF? Slice segments are going to be both dedicated/shared. Started with discovering existing resources; assume segments created with VNF/PNFs in inventory & discoverable. Spinup new slice instances.

Jan 2, 2020:

  • (1) ROADMAP - Proceeding with detail, developments for roadmap beyond R6.

  • (2) API - defining API in progress.

  • (3) PoC - Prototype of PoC from Orange focusing on VNF-portion.

  • (4) SO - Implementation in SO W/F and hierarchy using Svc ref concept to be discussed beyond R6.

  • (5) ORCHESTRATION - documentation what will ONAP do wr.t. slice orchestration

  • (6) MODELING - Discussing Modeling aspects, how to represent CSI, NSSI, NSSMF etc how to implement in SO how to communicate w/ external domain NSSMF.

  • (7) VID - Discussion: @Milind Jalwadi (Unlicensed)

    • JSON based screens for VID, Is there a slicing GUI that could be re-used.

    • would want to upstream that NSST NSSD

    • Part of the Network Slicing Use Case.

Presentation/slides at: NETWORK SLICING PoC in R6 Frankfurt (Obsolete)

Feb 13, 2020 - Development is proceeding. Start R7 release in next couple of weeks. Next week there will be presentation on requirements for R7.

R4 in 3GPP 28.541 - implemented as part properties of a service. didn't create separate TOSCA type for sliceprofile. Plan to introduce new serivce for serivce & slice profile properties in 3GPP those are recent doc updated in january. introduced many new properties from GSP. You've modeling team presentations were made, platform updated w/ network slicing.

Read the Docs entry https://onap.readthedocs.io/en/latest/submodules/integration.git/docs/docs_usecases.html  navigate to USER GUIDES > VERIFIED USE CASES.

ORAN/3GPP ONAP Harmonization U/C

@Vimal Begwani

@marge.hillis

Dongho Kim

Trying to settle on scope of the Use Case. List of many possible contributions that will take more than one release to complete. Impacts for items to be added to wiki (analysis).

Prioritize the work items what we could propose to accomplish.

CM Notify as a new domain has been accepted on the DCAE S/C today Oct 24 2019.

@Dongho Kim  will be creating the test/integration page.

Nov 21, 2019 - A1 & O1 test integration pages have been added & links. DongHo Kim leading the Integration

Jan 2, 2020 Sandeep code was merged w/ SDN-C branch. Current container has the latest code. Continuing to test. In AT&T lab now being tested

OOF SON PCI

@N.K. Shankaranarayanan

Jan 9, 2020 From SDN-R when we send config change align to NetConf Yang model avail. whatever yang model used, want config DB schema to be aligned w/ yang model to keep model driven. wanted Yang Models from ORAN if possible. In license catch-22. Some yang models for RAN on ORAN website due to licensing issues from @Martin Skorupski took 3GPP model converted to files to compile. Issue w/ ORAN getting ok from 3GPP that it is a valid rep of 3GPP model. Option (1) use previous yang model, or (2) switch to ORAN model if available immediately. yang to SQL schema. Only need some parts of the model for SON project. Currently MariaDB continue to use. Piotr, Marek, et al. If there are useful file wo/ IPR issues, should be a way to use interim files.

WoW w/ Model & Arch

 

Way of Working between Architecture , Modeling Subcommittee & Use Case Teams and what happens and touch-points at M0/M1/M2/M3.

Modeling Way of Working / Process:

Proposed ONAP Release Process Updates for Information and Data Modeling

Use Case Way of Working / Process

Use Case WoW Process: ONAP Use Case / Requirements Teams Process Way of Working (WoW)

Use Case Template

5G U/C Team

@Andy Mayer

@Scott Blandford

Use Case Template -

Ben talked w/ Andy Mayer U/CR call Oct 23. He said he is preparing the page, and would present here at the 5G U/C S/C call.

REQUIREMENTS SUBCOMMITTEE - requirements sub-group / not bring use cases any more, refer to them as requirements. / proposed change talk less about architecture in requirements mtgs & reviews. more clear split between req & arch discussion.   / Alla Goldberg changed U/C S/C to Requirements S/C. Security and ctl loop req will be discussed in those S/C; other things should go to Req S/C.

Monday - Feb 3, 2020 - what input for Req review; should not go into realization aspects should be moved out of req review. What type of info & how much info at M0. when just reviewing proposed req. Andy has said Proposed Functional Template for Use Cases this is ready to go live.

  1. New Use Case Template@Andy Mayer presented on new additions to Use Case Template: Use Case Tracking Template proposed for R7. If a U/C is extending from a Prior Release should we convert to new Template, or can we maintain. Use cases should to link to new req in the proposals.

 PM Dictionary, 5G NRM

5G U/C teams

 

 

PNF Pre-onboarding/ onboarding

PNF U/C teams

@Benjamin Cheung

R7 - Per artifact package security for the onboarding package. ETSI SOL004. Verified in VNF-SDK/VVP

R7 - dynamic schemas updates to the RTCfgDB with Yang model files.

PNF / SW Upgrade

@Zu Qiang

Reviewed with SO team.

Preparing for DDF. will discuss with Change Management team, might be presenting. R6 in progress.

Should be able to update/merge all Jiras by M4. No big risk. Integration RC0-RC2

5G/ Bulk PM

 

@Oskar Malm

Preparing presentations at DDF in Prague in DDF for R6 BulkPM functionality in Jan 2020.

R7 - Bulk PM

 

PNF / NetConf

@Oskar Malm

Basic U/C unchanged, support for NetConf over TLS. What is being worked on in R6 is to have a improved functionality around certificate handling. When you have a TLS 1.x for authentication for ONAP so the NF when it connects to ONAP it is a valid xNF. Authenticate user cert ONAP needs to get the certs from somewhere - a centralized solution w/ AAF. and connect to ext. PKI via CMPv2. ONAP component minimum version TLS 1.2. Dependency to REQ-140 (CMPv2); Controller-side NetConf over TLS REQ-76.

PNF / Plug and Play

@Benjamin Cheung

held meeting for discussing Civic Address elements & Geolocation information w/ the modeling S/C

PnP - PNFD/SDC AID/AAI Schema Modeling - Discussion Jan 2, 2020

Eventually will the PNFregistration VES event for PnP (R7).

SO presentations related to Building block definitions. Dependency to REQ-140. Option #2 new arch. is agreed. Option #1 continue w/ old. Use Case Realization Call: February 19, 2020

@Benjamin Cheung Find out if - will we support >1 PNF instance / template per service 5G Service (Run-Time). Plan to test/Integration how to do the instantiation. Use CLI to do instantition, limitation in SO workflow limitation in controller, PRH.

5G Service Modeling U/C

@Benjamin Cheung

WIKI: 5G RAN SERVICE MODELING & DEFINITION in R6 Frankfurt

CDS Data dictionary - Define attribute, in that entry tells you how to get that value. @Yuriy Malakov

If you needed the IP@ you can go that entry → points to the REST call. Used for instantiation and configuration management. Model driven ONAP. Modeling Concepts

3GPP TS28.541/TS28.540 - 5G NRM Network Resource Model analysis (spreadsheet). Looking parameters introduce

Classify parameters - CDS Data Dictionary, A&AI, RunTime Cfg DB.

Presentations - Modeling S/C, U/C S/C, U/C Realization, 5G U/C.

Modeling S/C - Experimental info model introduced (standards driven)

A&AI - classification of A&AI parameters. Commission (might need at installation & commissioning) → A&AI.

Onboarding - Onboarding, PNF PNFregistration, CMNotify (VES events), Pre-defined "load 3GPP model"

Information Flows - Where these might be used.

ORAN Standards - Usage of the 3GPP TS28.541 in ORAN Standards. Might want to consider which 3GPP parameters ORAN cares about & when. They might an opinion of when to incorporate parameters.

Presentation at Use Case Realization call Jan 29, 2020 

Use Case Realization Call: January 29, 2020 - next step to present to Modeling S/C.

CMPv2 Security (AAF enhancements)

@Pawel Baniewski

Hampus Tjader

M2/M3 CMPv2 & AAF status - CMPv2 GREEN at M2/M3 right now. https://lf-onap.atlassian.net/browse/REQ-140 have committers now. AAF S/W. CMPv2 protocol.

  1. REPO Avail - Nokia has created a repo, discussing architecture now.

  2. Access - Confirmed, we can access the Repo.

  3. Deliveries - Nokia planning to deliver the CertService (accept request from client), CertService Client (init container w/ ONAP apps), and integration with external CMP v2 service.

  4. Integration to Border Components - Integration with ONAP modules, DCAE/VES, SDNC, DCAE/DFC very likely to be post-posted to R7. High Risk The ONAP "bordering" components. Consequences - in scenario where you int ONAP w/ external function won't be able to dist cert generated in external Cert. Authority (CA) within ONAP; thus would still be able to integrate a NF to ONAP but would need to distribute manually bring the certs to ONAP. The Automation of distribution would be missing. The NFs contact the CAs to get certs. Integrate ONAP w/ CMPv2 w/ CertSvc to same Ext. CA. Integrate the xNF gets the cert to Ext. CA. ONAP gets matching trust anchors from same Ext. CA, loaded to an ONAP component. CertSvc bought back dist. within ONAP volume where cert is stored & consumed by ONAP component. 3GPP requires/originated. Consumes maximum of what 3GPP has.

  5. Slides - https://lf-onap.atlassian.net/browse/ONAPARC-553

  6. Integration - Separate integration efforts. 140 is the common part in AAF, including client component that can be reused, there is integration work which have separate requirements. This creates a dependency on those other requirements, being delivered with enough time to do integration.

  7. Plug and Play, Bulk PM, NetConf - CMPv2 PnP got descoped, secure Bulk PM is descoped, NetConf is proceeding see: Frankfurt Release Requirements

  8. REQ-76 - If we manage to complete the integration into SDN-C (REQ-76) additional integration related to that. https://lf-onap.atlassian.net/browse/REQ-76

  9. DEMO - Plugfest in June 2020 it might be nice to demo something.

SUPPORTING SLIDES

Document

File

Document

File

Arch Req

 

 

RECORDING

Recording

File

Recording

File

MP4 (Video + Audio)

Audio Only

M3U, Chat