/
5G - Bulk PM - Test Status - Dublin

5G - Bulk PM - Test Status - Dublin

For full description of the test cases below see Test Cases description , executed on SB-02 deployment



TC ID

TC Name

Status

Comment

TC ID

TC Name

Status

Comment

Bulk_PM_E2E_01

Ensure that the 'FileReady' VES event is sent from the simulated xNF via the VES collector.

PASSED



Bulk_PM_E2E_02

Ensure that the unauthenticated.VES_NOTIFICATION_OUTPUT topic is present once it received "File Ready" VES notification from VES Collector.

PASSED



Bulk_PM_E2E_03

Ensure that the Data File Collector starts to download the xml PM file(s) from the simulated xNF once it receives the 'FileReady' VES event via the VES collector.

PASSED



Bulk_PM_E2E_04

Ensure that the PM xml file(s) are published to the Data Router.

PASSED



Bulk_PM_E2E_05

Verify the Data File Collector Metadata file is valid

PASSED



Bulk_PM_E2E_06

Verify 3GPP PM Mapper subscribes to feed on the Data Router and maps the PM xml file onto the Message Router as a VES Message(s)

PASSED



Bulk_PM_E2E_07

Verify that "simulated PM VES Consumer" receive VES events from Message Router topic.

PASSED