VID Beijing S3P Status

Platform Maturity Integration Testing

Area

Actual Level

Targeted Level for current Release

Evidence/Associated User Story

Comments

Area

Actual Level

Targeted Level for current Release

Evidence/Associated User Story

Comments

Performance

Level 0

Level 1

VID-157: Non-Functional requirements - PerformanceClosed

Pending test from Integration team

  • 0 -- none

  • 1 – baseline performance criteria identified and measured

  • 2 & 3 – performance improvement plans created & implemented

Stability

Level 0

Level 1

VID-154: Non-Functional requirements - StabilityClosed

Heat and OOM deployments have the instances running for more than 72 hours - https://jenkins.onap.org/view/External%20Labs/

  • 0 – none

  • 1 – 72 hours component level soak w/random transactions

  • 2 – 72 hours platform level soak w/random transactions

  • 3 – 6 months track record of reduced defect rate

Resiliency

Level 1

Level 2

VID-148: Non-Functional requirements - ResiliencyClosed

Tested locally & delivered, health check passes

  • 0 – none

  • 1 – manual failure and recovery (< 30 minutes)

  • 2 – automated detection and recovery (single site)

  • 3 – automated detection and recovery (geo redundancy)

Security

Level 0

Level 1

VID-161: Non-Functional requirements - Security (CII passing badge + 50% test coverage)Closed

https://sonar.onap.org/component_measures?id=org.onap.vid%3Avid-parent&metric=line_coverage

  • 0 – none

  • 1 – CII Passing badge + 50% Test Coverage

  • 2 – CII Silver badge; internal communication encrypted; role-based access control and authorization for all calls

  • 3 – CII Gold

Scalability

Level 0

Level 1

VID-160: Non-Functional requirements - Scalability Closed

Tested locally & delivered, health check passes

  • 0 – no ability to scale

  • 1 – single site horizontal scaling

  • 2 – geographic scaling

  • 3 – scaling across multiple ONAP instances

Manageability

Level 0

Level 0

VID-155: Non-Functional requirements - ManageabilityClosed

instantiation in < 1 hour is already supported. No plan to support single loging in Beijing.



  • 1 – single logging system across components; instantiation in < 1 hour

  • 2 – ability to upgrade a single component; tracing across components; externalized configuration management

Usability

Level 1

Level 1

VID-158: Non-Functional requirements - UsabilityClosed

https://onap.readthedocs.io/en/latest/submodules/vid.git/docs/index.html

  • 1 – user guide; deployment documentation; API documentation

  • 2 – UI consistency; usability testing; tutorial documentation