12-12-2017 - Control Loop Sub Committee - Santa Clara F2F
Duration 90 minutes - 3:30pm PST
Discussion items
Duration | Agenda Item | Requested by | Notes / Links |
---|---|---|---|
START RECORDING | |||
10 min | Logistics | @Pamela Dragosh |
|
10 min | Network Policy | @Robert Tao |
|
|
|
|
|
|
|
|
|
|
|
|
|
Action items
@Pamela Dragosh - will initiate Chair voting with LF and ask TSC for guidance
Kenny gave us guidance, we initiated the nomination/election process.
In Progress
@Ron Shacham - lead gather Control Loop Guiding Principles
TBD
@Pamela Dragosh - lead to start gather Information and Data models being used for Control Loop
TBD
@Scott Seabolt - vFirewall use case, ModifyConfig payload.
TBD
@Gervais-Martial Ngueko - Arrange meeting with Use Case SD-WAN questions - invite owners of that to present to sub committee
Martial contacted Alla, the use case does not exist anymore.
CLOSED
@Scott Seabolt - Need clarification from Enterprise vCPE Use Case on the Control Loop. VFC vs APPC?
TBD
Need to identify/fix VOLTE gaps from Amsterdam - will wait for @Guangrong Fu next week to help drive this.
Gap 1: Configuration from DCAE, not able to distribute to Holmes. TODO: Open JIRA's in Policy/DCAE. Need @Lusheng Ji to confirm if fix is for Amsterdam or Beijing.
Gap 2: CLAMP only able to configure one rule for Holmes, would like multiple rules.
TODO: Holmes and Policy meet to share GUI for BRMS Rule Creation.
Notes:
Reviewed last weeks action items (see above). Notably we initiated the Chair election process.
@Robert Tao presented a potential VOLTE Use Case for Traffic Protection Network Policy (Control Loop)
@Yuan Liu presented VOLTE auto-scaling Control Loop proposal for R2
Recording