2017-11-26 Doc Project Meeting

Topics, Notes, and Follow-Up Tasks

Topic

Notes

Follow-up

Topic

Notes

Follow-up

Release / Branching Strategy

  • Both master and amsterdam are being published at read the docs.  The default when someone enter http://docs.onap.org is master and the the developer wiki download link currently points to master.    Should we change this?

Create JIRA ticket(s) for each item below  @Rich Bennett
Switch DW download link to RTD amsterdam when branches above are completed @Rich Bennett   



What needs to change for the latest vFW instructions? @Eric Debeau
Do we need something for new users (not developers) that want to understand use cases, try higher level service/policy scenarios, etc?  @Eric Debeau



Wiki Migration

Sub Tasks for:

  • Setting Up ONAP

  • Integrating with ONAP

  • Using ONAP

  • Architecture

  • Documenting ONAP

  • Developing ONAP

DOC-179: Migrate Release Controlled Wiki ContentClosed

Start with (oom kubernetes,  quickstart, heat template ), set example / define a best practice for collecting/refining documentation on wiki, following a process with wiki labels, JIRA tickets, etc that keeps everyone aware of state and transition to change controlled documentation in gerrit

Structure Clean-Up

  • Developing ONAP:   Structure and Headings clean-up

New JIRA Issue

Carrier Grade

  • "Carrier Grade" usability - what does that mean for Documentation?

  • Insuring standards/consistency across projects (e.g. terminology, monitoring, clustering)

  • Usability (e.g. Designer, VNF Providers, Operations)

New JIRA Issue

APIs

  • Differentiate:

  1. REST API

  2. HealthCheck API

  3. Components API (eg Java class API)

New JIRA Issue

Glossary

Modeling team responsible

  • Definitions to RsT

  • Indexing / tagging to enable Searching

Address during Release 2

Create JIRA issue - Greg follow up

Tooling / Utilities documentation

How to:

  • Gerrit guide

  • Guidelines (Builds, etc.)

  • Utilities:  Jenkins, Conversion tools (e.g. LFPandocs)



New JIRA Issue
(LF pursuing Quarter 3, 2018)