Merged list of R2 functional requirement candidates

Merged list of R2 functional requirement candidates

Req

Id

Functional   Requirement

Priority as   initially submitted

Agreed priority for   R2

Summary

Source

/ Use Case

New Component /   Enhancement

Related components /

Comments

Comments

Proposed Grouping /   Harmonization

Commitment

People/companies willing to work on the requirement

R1

Support for PNF   - Onboarding





https://lf-onap.atlassian.net/wiki/display/DW/Summary+of+Functional+Platform+Requirements+arising+from+5G+Use+Case

5G

New

SDC, AAI



Modeling /   On-boarding



R2

Support for PNF   - Data Collection & Monitoring





5G

New

SDC, DCAE, Portal



Modeling /   On-boarding



Monitoring



R3

Support for PNF   - Configuration & Control





5G

New

SDC, SO, SDN-C,   APP-C, AAI, Portal



Modeling /   On-boarding



R4

Slice Management -   Orchestration & Control





5G



SDC, SO, SDN-C,   APP-C, Portal

Applicable to   slicing subcase only

?



R5

Slice Management -   Definition





5G



SDC, AAI

Applicable to   slicing subcase only

?



R6

Slice Management -   Data Collection & Monitoring





5G



SDC, DCAE, Portal

Applicable to   slicing subcase only

Modeling /   On-boarding - Monitoring



R7

Slice Management -   Composition





5G



SDC, Portal

Applicable to   slicing subcase only

Slice management



R8

Optimization - Configuration   & Control





5G



SDC, SO, SDN-C,   APP-C, Policy, Portal



Slice management



R9

Optimization   - Data Collection & Monitoring





5G



SDC, DCAE, Policy,   Portal



Modeling /   On-boarding - Monitoring



R10

Optimization -   Onboarding





5G



SDC



Modeling / On-boarding   - Optimization



R11

Optimization -   Conflict Resolution 





5G



New ?, SDC,   Policy 



Modeling /   On-boarding - Optimization



R12

OOF -   Optimization 





5G



 OOF



Optimization



R13

OOF -   Multi-cloud 





5G



 OOF



Optimization



R14

SDWAN service   onboarding

1



https://lf-onap.atlassian.net/wiki/display/DW/Summary+of+Functional+Platform+Requirements+arising+from+SDWAN+Use+Case

SDWAN

Enhancement

SDC, SO, AAI, DCAE,   Policy



Modeling /   On-boarding



R15

Support for   selecting external or home brewed SDWAN controller

1



SDWAN

Enhancement

Resource   Orchestrator, AAI



?



R16

 Plugin/s for   interaction with external system/s

1



SDWAN

New

specificSdwanDriver,   OOM, RO



?



R17

Service Creation of   SDWAN branch

1



SDWAN

Enhancement

 VID, Resource   Orchestrator, specificSdwanDriver, AAI, ESR



Modeling /   On-boarding



R18

Overlay data   collection

2



SDWAN

Enhancement

specificSdwanDriver,   DCAE



Modeling /   On-boarding - Monitoring



R19

Correlations between   overlay and underlay

2



SDWAN

Enhacement

DCAE - Holmes



?



R20

Dynamic Bandwidth   Management for SDWAN

2



SDWAN

Enhacement

DCAE-holmes, Policy,   specificSdwanDriver, Resource Orchestrator, AAI



?



R21

Lifecycle management   of External SDWAN controller in Data Center

1



SDWAN

Enhancement

VID, AAI, SDNC, VF-C

External system   registration

?



R22

Life Cycle   management for multi vendor VNF, integration with SDWAN  

2



SDWAN

Enhancement

VID, AAI, SO, RO,   SDNC, VF-C

Manage Life   cycle and service integration for 3rd party VNFs

?



R23

Residential vCPE   Multi-cloud support 





https://lf-onap.atlassian.net/wiki/display/DW/Missing+Platform+capabilities

R-vCPE







Modeling/Onboarding



R24

Support real-world   service design in SDC with standard based TOSCA model







R-vCPE







Modeling /   On-boarding



R25

Unify all design   tools (DG, Policy, DCAE Template, CLAMP, Holmes, A&AI schema, etc) and   make them as integral part of service design

1



  •   What is the best approach to integrate workflow design, policy   design, CLAMP, DG design, and AAI schema design into SDC?

  •   What’s the best way to describe the relationship between   service model and flows?

  •   If not all can be realized in R2, which items have higher   priority?

  •   Is there a need to build a event catalog to define system-wide   events, which can facilitate various event-drive process design and test?









Modeling /   On-boarding



R26

VNF image management















Change Management

AT&T

R27

DNS name   configuration















?



R28

Enhanced   Platform Awareness Capability

2



https://lf-onap.atlassian.net/wiki/display/DW/Missing+Platform+capabilities

Performance





The capability   orchestrate and configure VNFs with EPA requirements.

Modeling /   On-boarding - EPA



R29

Locking   Mechanism.

4



Change management





Support of locking   mechanism that can prevent different parts of ONAP from accessing

Change Management

AT&T

R30

Platform   capabilities exposure.

1



Change management