CCVPN - Cloud Leased Line Integration Test Plan for Istanbul Release
Test Case Summary
Test Case Number | Test Case | Status |
---|---|---|
1 | Physical network discovery | completed |
2 | Create and delete single CLL instance which accesses single cloud | completed |
3 | Create and delete single CLL instance which access multiple clouds | completed |
4 | Create and delete multiple CLL instances which access single cloud | completed |
5 | Create and delete multiple CLL instances which access multiple clouds | completed |
6 | Create a CLL instance which have connection links with different bandwidth | completed |
7 | Modify the bandwidth of a connection link of an existing CLL instance | completed |
8 | Modify an existing CLL instance by add a new connection link | completed |
Test Plan
The Transport Slicing integration tests consist of eight (8) test cases. Each test case is broken down into a sequence of measurable checkpoints. These checkpoints are RESTful APIs, each of which has a specific set of input and output parameters which can be measured against. The checkpoints are illustrated below.
Test Case Details
The test procedures for the test cases are provided in the following table.
# | Test case | SO-NBI | SO-AAI | SO-SDNC | SDNC-AAI | SDNC-PNC |
---|---|---|---|---|---|---|
1 | topology discovery | N/A | N/A | N/A | Merge domain topologies and save in AAI | 1. Provide sample topology json -- design the topo for demo |
2 | test case #2 - #8 |
| 1. provide sample SO-AAI restful API (input/output) | 1. provide sample SO-SDNC restful API (input/output) | 1. provide sample AAI API and (CCVPN/ACTN) model content | 1. Provide sample ACTN MPI json (input/output) |