STATUS: DRAFT
Remove: Please copy, change the title, and fill the contents. Extra material can be added as attatchments to the wiki page.
1. Scope
DESCRIPTION: << Insert short description of the flow >>.
WHEN EXECUTED: << Inform of when it is executed >>
PURPOSE: << Inflorm of the purpose of this flow >>
Information Model: Main information being used and a reference to the information model
ACTORS:
- << Actor 1 >>
- << Actor 1 >>
<<Optional: Replace with figure illustrating the scope >>
2. Pre-Conditions
The preconditions are:
- << List preconditions here >>
3. Information Flow
<<Remove: this is a plantUML macro to show the information flow. Syntax can be found here: http://plantuml.com/sequence-diagram >>
<< what >> – Flow description according to numbering. Include interface (e.g. SDCE-6) and main information (can have a link to the information link).
4. Post Condition
The post-conditions are:
- list of post conditions.
5. References
<<interface name (e.g. SDCE-6) >> https://wiki.onap.org/display/DW/SDC+Distribution+client+AID
<< models >> <<link>>