2020.02.04
Notes
- Swisscom lab:
- ONAP ElAlto is up again
- New SDNC DG:
- - SDNC-1021Getting issue details... STATUS
- Ran 1st test of new DGs in Swisscom lab
- Feedback from Prakash E: SO is triggering vnf-topology-operation DG with svc-action as "create" and request-action as "createnetworkinstance". Since request-action "createnetworkinstance" is not present in vnf-topology-operation, it's returned without calling any corresponding BBS DGs
- We may need changes in SO BPMN "CreateSDNCNetworkResource"
- SO:
- We need to double check the PNF READY timeout issue in Swisscom lab and provide logs in - SO-2608Getting issue details... STATUS
- Closed - SO-1994Getting issue details... STATUS
- DCAE:
- - DCAEGEN2-2047Getting issue details... STATUS
- - DCAEGEN2-1583Getting issue details... STATUS do we need it in Frankfurt?
- Policy:
- We cannot keep BBS APEX policy in ONAP's Policy repository. It was agreed in R4 that use case code will not be a part of the platform repos.
- New repository in gitlab for BBS APEX policy: https://gitlab.com/onap-bbs/apex-policy
- Closed ticket - POLICY-2333Getting issue details... STATUS
- Once the policy is ready, we need to consider moving the policy code to https://gerrit.onap.org/r/admin/repos/demo
- Other points?
2020.01.28
Notes
- New SDNC DG:
- - SDNC-1021Getting issue details... STATUS
- Moved HUAWEI branch from network-topology-operation to vnf-topology-operation (Prakash E )
- Installed in Swisscom lab for testing. Tests are pending due to issues with ONAP installation
- New SDNC DGs: dgs.zip
- Issues SO:
- - SO-2608Getting issue details... STATUS
- - SO-2609Getting issue details... STATUS
- - SO-2611Getting issue details... STATUS
- Issues DCAE
- Stavros Kanarakis to create JIRA tasks related to BBS-ep
- Integration testing
- No recommendation on which library/framework to use for a mock 3rd party controller from the Integration team
- We can start with our BBS's edge controller implementation and evaluate the option to make it generic and use it for Access. The mock should reply to CRUD calls coming from SDNC (AccessConnectivity, InternetProfile) and generate VES events (PNF registration, CPE authentication).
- Tim Carey to draft a proposal including CDS for 3rd party controllers in March (not for Frankfurt)
- Lab in UNH-IOL. No update for now