Project Name | Status | Notes | |
---|---|---|---|
Health Check | TO BE DONE | ||
Data flows for all use case | VES data reception (VNF to VES simulated) | TO BE DONE | DCAE-TCA-Policy-PairwiseTest-10072021.txt |
VES ↔ TCAgen2 , via DMaaP | TO BE DONE | See above attachment | |
TCAgen2 ↔ Policy, via DMaaP | TO BE DONE | See above attachment | |
DCAE (TCAgen2) ↔ AAI, via API | TO BE DONE | 08032021-TCAv1.2.2-AAIEnrichment | |
DCAE (VES) ↔ Holmes (track metrics data), via DMaaP | NA |
ONAP Bootstrapped services (non-usecase specific) | |||
---|---|---|---|
PNF Reg Flows | VES ↔ PRH, via DMaaP | TO BE DONE | https://logs.onap.org/onap-integration/daily/onap_daily_pod4_master/2021-10/10_04-19/xtesting-smoke-usecases-robot/pnf-registrate/pnf-registrate/report.html |
PRH ↔ AAI, via API | TO BE DONE | ||
PRH ↔ SO, via DMaaP Note: Scope of this test is to validate DMaap notification/structure (E2E PNF registration flow to be verified during integration phase) | TO BE DONE | ||
HV-VES | WTP:GPB message ↔ HV-VES (tcp/socket) | TO BE DONE | https://logs.onap.org/onap-integration/daily/onap_daily_pod4_master/2021-10/10_04-19/xtesting-smoke-usecases-robot/hv-ves/hv-ves/report.html |
HV-VES ↔ DMAAP/kafka | TO BE DONE | ||
Bulk PM usecase | VES ↔ DFC, via DMaaP | TO BE DONE | https://logs.onap.org/onap-integration/daily/onap_daily_pod4_master/2021-10/10_04-19/xtesting-smoke-usecases-robot/5gbulkpm/5gbulkpm/report.html |
DFC datacollection | TO BE DONE | ||
DFC↔ PM-Mapper, via DMaaP/DR | TO BE DONE | ||
PM-Mapper ↔ Dmaap | TO BE DONE | ||
CMPv2 usecase | DCAE (VESCollector) deployement using CMPv2 cert | TO BE DONE | https://logs.onap.org/onap-integration/daily/onap_daily_pod4_master/2021-10/10_04-19/xtesting-smoke-usecases-robot/cmpv2/cmpv2/report.html |
DCAE (VESCollector) Validation against PNF simulator | TO BE DONE |
E2E slicing related flows are validated part of usecase testing tracked under this page - R9 Integration Testing (this includes flow/CL support through Slice-Analysis, KPI-MS)