Skip to end of metadata
Go to start of metadata

You are viewing an old version of this page. View the current version.

Compare with Current View Page History

« Previous Version 5 Current »

Attending

Andreas Geißler Andrea Visnyei Sofia Wallin Timo Perala Thomas Kulik Eric Debeau

Topics, Notes, Status and Follow-Up Tasks


TopicNotes / Status / Follow-up
  • PTL election

Voting done. Sofia Wallinwaiting for final result to be ready for announcement. Congratulations Thomas Kulik!!!

  • Objectives for Honolulu (and onwards)

Jira ticket walkthrough,

type key summary assignee reporter priority status resolution created updated due
Loading...
Refresh

The team will investigate further with the OOM team on how to enable a non-voting job for warnings. 

  • Guilin Maintenance Release 

All done for the doc project (date in the release note might need to be updated). Still lacking some project updates

  • Architecture documentation 

For future collaboration and facilitation we will ask for a time slot in the arch subcommittee meeting to inform and educate how to work with docs.

https://gerrit.onap.org/r/c/doc/+/115497


David McBride will join to discuss this further. 

Active projects vs maintenance projects. 

  • Update "Documentation improvements for end to end usage of ONAP"

@Aarna Networks

Call scheduled for Tuesday WW13

Many links ara managed in RTD

  • local links within a repo
  • inter-project links using inter-links from sphinx
  • links to code repo
  • external links to web sites

There is a problem when a documentation linkes to a repo => the branc is not indicated. As result, the link points to the latest release

Propostion to provide guidelines to be then presented for PTL


Many links are broken => need to include a test in JJB and provide information about broken links

Feedback has been given, positive output. Next step, bring to PTL 

Sill required from the project to test




  • No labels