Skip to end of metadata
Go to start of metadata

You are viewing an old version of this page. View the current version.

Compare with Current View Page History

« Previous Version 4 Next »

Topics:

Project Status in Guilin Release

Guilin Milestone Status

Guilin Impact View per Component

Guilin Release Requirements

Guilin release - non-functional requirements proposed list


Agenda :

5G slicing discussion on the SO impacts - Reshma / Priya., RAN/TN/CN NSSMF Workflow

xNF Software upgrade - Rahul Tyagi

Service Mesh PoC Plan and presentation - Fabian, Service Mesh PoC plan

SO_weekly_update



El-Alto :

SO 1.5.4

https://gerrit.onap.org/r/c/so/+/110179  is committed pending for merge.    – Done

Release test is blocked due to SDC distrbution and SO - Openstack integration issue. - In progress (/ Blocked)

Action : Seshu to check with Sylvain and get the updates.


Frankfurt Maintenance Release - done

Action : Seshu to update the Release notes, its been reviewed by the team and agreed upon.

SO-1.6.4 release readiness check.

         Action:

                   Venkat to change the so code to use appc orchestrator and validate the flow on 1.6.3- snapshot version.

                    To validate the delete of the MDNOS - Srini (Fujitsu) 

                    ETSi certificate validation as the MSB cert is changed during the RC2. -  Waqas (E///)

                    

Guilin Release:

SOL-002 Adapter will be deprecated for Guilin the changes will be merged to the Frankfurt release and retained there. Seshu Kumar Mudiganti  - Done

SO Guilin Architecture Review  - Done

Service Orchestrator Guilin Release M1  - Done

Elena - Appc Orchestrator future to be concluded as the Appc module is removed from ONAP (Guilin) scope. 


Action :

Java 11 upgrade to be compiled and tested on the openJDK - To be completed before the M2 - 

                Action : Seshu to start the activity and take the help f the module owners on need basis.

Discuss with integration team of the gating - Seshu

 - Closed  : Resolution is to have the gating as part of teh verify jobs in future, Integration team is working with LFN on this.

Security based TSC P1 to discuss and confirm with seccom SMEs - Seshu and Ramesh

             > Max to brief the details

             > Components may use HTTP as server and client  (API hanlder and SO monitoring) - 

             > Ingress from Nodeport (30225 and 30227 port based communication) - 

Closed :  Identification is closed as part of the REQ-364. Orange will support us on the initial impl and Ramesh (ATT), Byung (Ericsson) and Seshu to handle the specifics.

REQ-323 Vulnerability removal / addressing - (Seshu  to check the accessibility of the page with Amy)

             > Max to help of the details

Closed :  Seshu handle this with the help os specific module owners, granting permissions to all is not possible at the moment.


All containers must run as non-root user  discuss with Integration  - Seshu to get the confirmation from Sylvain

Closed : The final glitch is corrected. We are ok on master.



Topics for Guilin (Master Branch)


Topic Java 11 upgrade : Arun (Huawei) is working on this. The first version of changes will be merged 29th July.

The basic push has been made necessary for the java 11 are pushed, they are being tested in the ATT lab (JDK 11.13??) internally at the present and the required changes would be merged as and when needed

The questions that needs to be addressed are 

  1. The JDK version (need to refer to the integration refered one)
    1. move to the open JDK 
    2. oparent changes to be taken into consideration
  2. Docker dependencies
  3. Build and Jenkins jobs dependencies
  4. the code specific dependencies (from JDK 8 to JDK 11)
  5. Mocking dependencies  

SO simulator package - 

Action : Ramesh Parthasarathy  to Dmitry and check and get back with an example for usage.

Docker compose Mukesh Paliwal

Older docker files to be updated

  1. need to update the documents of the dockers how to use in the dev env
  2. for the new pods included to improve the documentation and usage - developer friendly

The Password removal from the OOM - AAF integration / Service mesh (AAA)...

  1. To consult the integration and security teams (Sylvain and Krzystof )
  2. Draft the plan to make sure what is the way out
  3. work on the most required pieces of the code and resolve the listed issues


Action Items from Jira :

Action : Seshu to create a new label to track the generic issues. - done


Meeting recording:


Frankfurt Release Integration Test Blocking Issues

Integration Weather Board for Frankfurt Release

Review 

ARC Service Orchestrator Component Description - Frankfurt

Issues open :


key summary type created updated due assignee reporter priority status resolution
Loading...
Refresh





  • No labels