Information for PTL
This template is to be filled out for any project wishing to move to the "Mature" phase of the ONAP project lifecycle.
Once completed, remove this info box and the send the link for this page to onap-tsc@lists.onap.org to initiate the maturity review.
Per the ONAP Technical Community Document, the metrics for maturity review are:
›Successful participation in releases: The project demonstrates stable output (code base, documents) within its history of releases in accordance with the release policy.
›Architecture has been reviewed by the Architecture Committee
›Project is active and contributes to ONAP: The project demonstrates a stable or increasing number of contributions across recent releases. Contributions are commits which got merged to a repository of an ONAP project or a related upstream project. Commits can for example be patches to update the requirements document of a project, code addition to an ONAP or upstream project repository, new test cases and so forth.
›Mature artifacts produced: The project demonstrates that the artifacts produced by the project are deployable (where applicable) and have been successfully deployed, configured and used by end users (typically, service providers).
Review Submission Date:
Project Description:
Holmes is deployed and managed as an analytics application of DCAE. As a part of the closed control loop, it targets at digging out correlations between different alarms, identifying root alarms and child alarms, and triggering corresponding actions by sending the root alarm as a control loop event to the Policy Framework.
Project Landing Page:
Project Meeting Minutes:
Leadership Resources :
add lines if necessarry
Role | Name | Linux Foundation Login (LFID) | Email Address |
---|---|---|---|
PTL | Guangrong Fu | GuangrongFu | fu.guangrong@zte.com.cn |
Committers | Guangrong Fu | GuangrongFu | fu.guangrong@zte.com.cn |
tangpeng | tang.peng5@zte.com.cn | ||
Project & Release History
- How long the project has been an active: At launch
- Release Participation: Amsterdam through El Alto (Absent from Frankfurt due to lack of required materials for M1)
- Engagement levels for past releases (up to 3):
Statistics data from Bitergia from the very beginning
Release Name and Timeframe | Commits | Contributors | Companies | Notes |
---|---|---|---|---|
Amsterdam | 360 | 10 | 5 | |
Beijing | 136 | 13 | 6 | |
Casablanca | 134 | 10 | 4 | |
Dublin | 85 | 7 | 4 | |
El Alto | 21 | 1 | 1 |
- Use Cases:
- VoLTE
- CCVPN