R6 5G-SPECIFIC USE CASES (Frankfurt Release)


Release 6 will be a "normal" release but with an extended M1 from June to Aug 29.


TITLEDESCRIPTIONCATEGORYWIKI
5G SERVICE MODELING & CREATION
Defining and Modeling a 5G Service for Design Time and use by other 5G Use Cases. Defining the Platform Data & Information model and PNF Resource for a 5G RAN.

5G FCAPS

Discovery

5G Operational

5G RAN SERVICE MODELING & DEFINITION in R6 Frankfurt
OOF SON ENHANCEMENTS

Optimization and OOF SON development. Dublin Carry-over items.

OOF (SON). SDN-R Network. Policy Control Loop Coordination.

5G Operational

Optimization

OOF (SON) in R5 El Alto, OOF (SON) in R6 Frankfurt
RunTime Data Persistency (RunTime Config DB)
Run-time configuration data persistency (Run Time Config DB/MariaDB).5G CM (FCAPS)5G CONFIGURATION (RunTime DB)
NETWORK TOPOLOGY MANAGEMENT5G Network Topology Management. 5G Network representation and management.5G OperationNETWORK TOPOLOGY MANAGEMENT (R7 GuiLin)
PERFORMANCE MEASUREMENTSPerformance Measurements Use Cases (including Bulk PM, RT PM and PM Dictionary)

Data Collection

5G FCAPS

PERFORMANCE MEASUREMENTS USE CASES: Bulk, RT, Dictionary

      BULK PM

     (PERFORMANCE

     MEASUREMENTS)

Performance Measurements 5G RAN Bulk Upload. The main proposed addition is PM control capability.

Partially 5G Specific, and Partially "Generic". Can be evolved for use with generic PNFs (beyond 5G)

Data Collection

5G FCAPS

5G Bulk PM in Frankfurt/R6

     5G PM DICTIONARY

     (PERFORMANCE

     MEASUREMENTS)

Support for handling & support for PM Dictionary & PM Schema (from standards).

Eventually other PNFs will support faults, but right now 3GPP specific formatting is used in the PM artifact. Can be evolved for use with generic PNFs (beyond 5G)

PNF Support

Data Collection

5G FCAPS

FM META DATA & PM DICTIONARY in R6 Frankfurt

5G FM META DATA

(FAULT MANAGEMENT)


Support for handling FM Meta Data.

Eventually other PNFs will support faults but right now 3GPP specific formatting is used in the FM. Can be evolved for use with generic PNFs (beyond 5G)

PNF Support

Data Collection

5G FCAPS

FM META DATA & PM DICTIONARY in R6 Frankfurt

NETWORK SLICING

END-TO-END NETWORK SLICING MANAGEMENT

Advanced 5G functionality, for Network Slicing development and early steps in long-lead development.

(CMCC) LIN MENG Lingli Deng Advanced 5G functionality, Management of Network Slicing development 

5G Operational

Optimization

NETWORK SLICING PoC in R6 Frankfurt (Obsolete)
MOBILITY STANDARDS STANDARDS HARMONIZATION WITH ONAP

There are many standards ORAN and 3GPP harmonization with ONAP.

O1, A1 definitions. Encoding protocol to use.

ORAN repository (proprietary to ORAN)


MOBILITY STANDARDS HARMONIZATION WITH ONAP

5G NRM (Network Resource Model) CONFIGURATIONConfiguration Management (CM Notify/ Update) using RESTful (HTTPS) Interface.

5G CM

(FCAPS)

5G Network Resource Model (NRM) Configuration in R6 Frankfurt


5G U/C COMMITMENTS BY PROJECT:

The following table indicates commitment by project. The impacts have been accepted and are supported by the PTL of each ONAP Platform component and corresponding Jira Tickets are in place. There are three states:

N/A = A "N/A" means that there is no interaction, no dependency, and no work for that Use Case for that component.

? = A "?" means that there is not final commitment from the PTL for that project, and no Jira ticket exists yet.

YES = This means that (1) PTL INFORMED & COMMITTED - has agreed to support the changes needed for that Use Case, (2) DEVELOPMENT SUPPORT - there is development (company) support (3) JIRA TICKETS - and a Jira ticket exists. Please see the corresponding WIKI page for that Use Case to find out more details on impact, PTL support and Jira Ticket(s).


NOTE: The CTRLR column includes CC-SDK, CDS, SDN-C, APP-C. Including what used to be SDN-R has been under the SDN-C "umbrella".


Use CaseSDCVIDPortalSOAAI ESR

CTRLR


DCAEOOFPolicyCLAMPDMaaPAAFVNF SDKREQTSModel S/COOMVIMPombaCIACLIConsulVF-C
Bulk PMN/AN/AN/AYESN/AN/AYESN/AYESYESN/AYESN/AN/AN/AN/AN/AN/AN/AN/AN/AN/A
FM PM DictN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AYESN/AN/AN/AN/AN/AN/AN/AN/A
OOF PCIN/AN/AN/AN/AN/AYESYESYESYESN/AN/AN/AN/AYESN/AN/AN/AN/AN/AN/AN/AN/A
SlicingYESN/AN/AYESYESYESN/AYESN/AN/AN/AN/AN/AN/AYESN/AN/AN/AN/AN/AN/AN/A
ORAN HarmonizeN/AN/AN/AN/AN/AYESYESN/AN/AN/AYESN/AN/AYESN/AN/AN/AN/AN/AN/AN/AN/A
Licensing ManagmtN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AYESYESN/AN/AN/AN/AN/AN/AN/A
5G NRMN/AN/AN/AYESN/AYESN/AN/AN/AN/AN/AN/AN/AYESYESN/AN/AN/AN/AN/AN/A
RunTime DBN/AN/AN/AN/AYESYESYESN/AN/AN/AN/AN/AN/AN/AYESN/AN/AN/AN/AN/AN/AN/A
5G Service ModelingN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AYESN/AN/AN/AN/AN/AN/AN/A


REQ = VNF Requirements Project. The VNF-RQTS project applies to both VNFs and PNFs. A "YES" here means that there are new requirements for the vendors.

Model S/C = Modelling Subcommittee. This U/C impacts the ONAP Platform Information and/or Data Model.

Ctrlr = This includes all of the controllers in ONAP including SDN-C, SDN-R, APP-C and VF-C

(star) Stretch Goal (N/A) but if extra resources are available some changes may be made.

Note (1): x

Note (2): x 


5G USE CASE ASSESSMENT:

The following table was to assess whether use cases are related to 5G (are 5G specific) or whether they are general PNF use cases.

The General PNF use cases have been moved to their own wiki: General PNF Support Use Cases

TITLERequirement / Platform Enhancement vs E2E Use Case
5G Specific
5G SERVICE MODELING

Requirement / Platform Enhancement

5G Specific
BULK PM

Requirement / Platform Enhancement

* Could be evolved eventually to be PNF & domain generic.

5G Specific *
5G FM META DATA & 5G PM DICTIONARY

Requirement / Platform Enhancement

* Could be evolved eventually to be PNF & domain generic.

5G Specific *

OOF SON ENHANCEMENTS

Requirement / Platform Enhancement

5G Specific
NETWORK SLICINGE2E Use Case

5G Specific

MOBILE SERVICE CHAINING

Requirement / Platform Enhancement 

General
PNF USE CASES: ( General PNF Support Use Cases )
PNF / PNF PRE-ONBOARDING & ONBOARDING Use Case

Requirement / Platform Enhancement


General
PNF / CONFIGURATION WITH NETCONFRequirement / Platform Enhancement

General

PNF / PNF PLUG AND PLAY
E2E Use Case

General

PNF / PNF S/W UPGRADE

Requirement / Platform Enhancement 

General

5G Use Case MEETINGS:

Links to the 5G Meetings & recordings:

DATEMEETINGLINK

 

5G U/C Network Slicing R6 Proposal (Shankar/Swami)5G Use Case Meeting notes for August 8, 2019

 

5G U/C Meeting Aug 15, 20195G Use Case Meeting notes for August 15, 2019

 

5G U/C Meeting Aug 22, 20195G Use Case Meeting notes for August 22, 2019

 

Presentation Preparation for AntwerpAntwerp Subcommittee F2F 5G U/C Presentation preparation Sept 5 2019

 

5G U/C Meeting Sept 12, 20195G Use Case Meeting notes for Sept 12, 2019

 

5G Use Case Meeting Sept 19 20195G Use Case Meeting notes for Sept 19, 2019

 

5G Use Case Meeting Oct 3 20195G Use Case Meeting notes for Oct 3, 2019

 

M1 Release Discussion5G Use Case Meeting notes for Oct 10, 2019

 

M1 Release discussion, Network Slicing Presentation5G Use Case Meeting notes for Oct 17, 2019

 

M1 Release discussion5G Use Case Meeting notes for Oct 24, 2019

 

M1 Release discussion5G Use Case Meeting notes for Oct 31, 2019

 

M1 Release discussion5G Use Case Meeting notes for Nov 07, 2019

 

5G Discussion5G Use Case Meeting notes for Nov 14, 2019

 

5G Service Modeling discussion5G Use Case Meeting notes for Nov 21, 2019

 

5G Discussion5G Use Case Meeting notes for Dec 05, 2019

 

5G Discussion5G Use Case Meeting notes for Dec 12, 2019

 

5G Discussion5G Use Case Meeting notes for Dec 19, 2019



SUPPORTING DOCUMENTS:

DocumentFile
Use Case TemplateUse Case Tracking Template
Use Case Analysis (from U/C realization Calls) / Sept 17 2019

Use Case Overview & Summary for R6


R5 El Alto Release

EUAG has decided that R5 El Alto will be a "maintenance/technical debt" release.

https://wiki.lfnetworking.org/display/LN/EUAG+2019-04-09+meeting+minutes

The El Alto release will be shortened (3-month cycle) and focused on internal (tech) debt and defect backlogs. And every 5th ONAP release will be a maintenance release.

PTLs had taken short cuts to meet deadlines, working but want to make the platform more robust. PTL driven code fixes and code hardening.

S/W Enhancements (e.g. GUI enhancements) would be pushed to R6. Feature enhancements would be pushed to R6

R5 will be focused on Refactoring, JIRA backlog reduction, vulnerability issues, Test Coverage, Test Automation (CI/CD pipeline), Deployment procedure, Documentation.

R5 - Security Scans, scan code reports sent to PTL for major things to fix. Vulnerabilities have been built. Vulnerability management process. Security gates checklist.

SUMMARY: There will be no new Software development for new functionality in R5; but there will be Jira tickets worked on (PCI/SON); and modeling work for 5G RAN.


TITLEDESCRIPTIONCATEGORYWIKI
PCI/SON ENHANCEMENTSOptimization and PCI (SON) development. Dublin Carry-over items will be worked in R5. There are two Jira tickets open for SDN-C.

5G Operational

Optimization

OOF (SON) in R5 El Alto, OOF (SON) in R6 Frankfurt
5G SERVICE MODELINGDefining and Modeling a 5G Service for Design Time and use by other 5G Use Cases. Defining the Platform Data & Information model and PNF Resource for a 5G RAN.

5G FCAPS

Discovery

5G Operational