Table of Contents:
Status | Choose One: DRAFT |
---|---|
Submitter | Abdel Rabi (Vodafone) |
Contributors | Bryan Whittle (iconectiv) Kanagaraj Manickam (huawei) |
Proposed Release | Dublin Release |
JIRA Ticket(s) |
Overview
Abstract
This proposal is to add dynamic checks within SDC to (1) Query a certification repository such as OVP to what certification a VNF has undergone and (2) invoke VTP to run custom Ad-hoc testing (checks) against VSP (VNF) prior accepting the VSP (VNF).
Rationale
- Industry standard certification program repositories such as the OVP portal or third-party repositories can be checked in order to minimize or even remove the need for local testing. The first part of this proposal is to add the support within SDC to query a certification repository.
- Currently, metadata values passed by the VSP package can contain values that are not compliant with either general ONAP requirements or specific requirements of the CSP installed deployment environment. That can lead to VNF deployment failure. Reducing the risk of such failure can be achieved by checking the metadata passed by the VSP against criteria in VTP or third-party testing frameworks. Examples of metadata passed by the VSP to be checked for compliance against a specific deployment environment are:
- Compute flavor check as to whether it is supported by underlying NFV Infrastructure.
- SR-IOV PCIe Pass through to a specific Network Interface Card as to whether that is available in the underlying NFV Infrastructure.
This second part of the proposal will add a capability within SDC to perform custom tests against a given VSP (VNF). This can be done by invoking VTP framework to run that tests and get the result back into SDC,
Other Options Considered
It has been considered that these compliant checks can be carried out offline but this will be restrictive in the following way:
- It is a big overhead to carry out those checks offline especially as VID deployments might vary from one instance of ONAP to another and hence the compliance criteria will change.
- Integrating it into SDC will allow queries to industry standard certification program repositories such as the OVP portal, as well as to third-party repositories, to perform certification checks.
- Integrating it into SDC will allow queries to VTP, as well as to third-party repositories, to perform deployment environment checks.
- Integrating it into SDC will allow for better integration with CI/CD tools and automate the checks, especially when rolling out VNF updates.
Code Structure
ONAP code can be found in: https://git.onap.org/
Will follow soon.
Proposal
From a high-level perspective, the proposal will allow VSP, when uploaded into SDC, to go through a set of checks to make sure it (1) has gone though certifications process and the result is satisfactory. (2) is compliant to the deployment environment and custom requirements.
Those checks can be done during the VSP validation stage by implementing plug-ins to SDC and introducing both a "certification repository" and a testing framework to be consulted. Figure 1 shows the proposal in a high-level view.
Figure 1: High-Level proposal.
As outlined in the Rationale section above, integrating these checks into SDC will allow queries to VTP and the OVP portal as well as to third-party repositories. Thus the APIs will be designed to interoperate SDC with that range of end-points. In order to meet the Dublin release schedule for the development of plug-ins and APIs, a registry is planned to be implemented as a discrete hosted component outside ONAP. Integration to VTP and OVP portal can be performed when those environments are ready.
Impacts
Project | Usage | Impact |
SDC |
| New functionality. |
VNF Test Platform (VNFSDK) |
| Provide the required NBI for supporting the requirements. |
Documentation |
|
|
References
Links to any additional resources referenced in or related to this proposal.
VTP New API changes for this
Project Action Log
Cloud & Automation E2E | |||||||||||||
ID (Unique Ref.) | Origin | Workstream \ Area | Detail | Dependency | Assigned To (Responsible) | Date Raised (Meeting Date) | Due Date | Date Closed | Status | Critical Path Y\N | Update \ Comment | ||
1 | WorkShop (15/01/19) | Technical | Arrange meting with VTP PTL to understand if they can act as a broker and iConnective registry and be the main end point (also retain API Specs, can I use inside or outside, suncrouns vs async) | Bryan | 15/01/2019 | 19/01/2019 | Open | ||||||
2 | WorkShop (15/01/19) | Technical | Need to discuss whether the call can be aync or sync, PUB SUB or what ? | 1 | Bryan | 15/01/2019 | 19/01/2019 | Open | |||||
3 | WorkShop (15/01/19) | Technical | Need to discuss the UI and subsequent approval of user experience with PTL of SDC and PTL of VTP | Prabhu Balan | 15/01/2019 | Open | 15/01/19 : Prabhu to provide a proposal for UI and to present this to SDC team to approve | ||||||
4 | WorkShop (15/01/19) | Project Management | Forward all SDC meetings to Prabhu | Susan | 15/01/2019 | Open | 15/01/19 : Susan from iconetiv and prabhu from vodafone to attend weekly SDC meetings. | ||||||
5 | WorkShop (15/01/19) | Technical | Find the VTP API specification to keep the experience similar to what it is today | 1 | Bryan | 15/01/2019 | Open | ||||||
6 | WorkShop (15/01/19) | Project Management | We need to define a way of working and list of stories that can be delivered in Dublin | 15/01/2019 | Open | ||||||||
7 | WorkShop (15/01/19) | Technical | Atul to come up with an example document to come up with a user story -> user manual -> user guide | Atul | 15/01/2019 | Open | |||||||
8 | WorkShop (15/01/19) | Documentation | Documentation for the E2E scenario that goes live with Release D –we need to discuss the delivery milestone (what EPIC it relates to etc) | 7 | Everyone | 15/01/2019 | Open | ||||||
9 | WorkShop (15/01/19) | Technical | What parser we need to use – J-PARSER ?, is that a wrapper called SDC TOSCA Parser ? need to talk to VNF SDK PTL, reason is there are two parsers, one for package and other for payload – Viktor Gao? | Susan, Martin | 15/01/2019 | Open | |||||||
10 | WorkShop (15/01/19) | Project Management | agree framework and Setup scrum meetings | David, Robin | 15/01/2019 | 21/01/2019 | Closed | ||||||
11 | WorkShop (15/01/19) | Lab Management | Give lab access to iconectiv | Prabhu Balan | 15/01/2019 | 18/01/2019 | 16/01/2019 | Closed | |||||
12 | WorkShop (15/01/19) | Lab Management | Instructions of how to upload to lab and use it. | Prabhu Balan | 15/01/2019 | 18/01/2019 | 16/01/2019 | Closed | |||||
13 | WorkShop (15/01/19) | Communications | Slide update to inlcue VTP as a broker | Bryan | 15/01/2019 | 19/01/2019 | 15/01/2019 | Closed | |||||
14 | WorkShop (15/01/19) | Technical | update impact table in wiki | Bryan | 15/01/2019 | 19/01/2019 | 15/01/2019 | Closed | |||||
15 | WorkShop (15/01/19) | Documentation | Present slides to SDC on Tuesday 15th | Bryan + Rabi | 15/01/2019 | Open | |||||||
16 | WorkShop (15/01/19) | Project Management | Keep/Upload this sheet in ONAP wiki | Rabi | 15/01/2019 | 15/01/2019 | Closed | ||||||
17 | WorkShop (15/01/19) | Project Management | David and Robin to figure out a plan for syncing delivaries, etc. | David, Robin | 15/01/2019 | Open | |||||||
18 | WorkShop (15/01/19) | Technical | Create JIRA stories in ONAP Jira | Susan | 15/01/2019 | Open | |||||||
19 | WorkShop (15/01/19) | Technical | Confirm with Offir what he needs from us by the deadline. | Susan | 15/01/2019 | Open | |||||||
20 | WorkShop (15/01/19) | Technical | Add workflows into Sprints and share with vodaofne to confirm. | Bryan | 15/01/2019 | 20/01/2019 | Open | 15/01/19 : Bryan to flesh out sprints and share with vodafone in next Monday meeitng to confirm | |||||
21 | WorkShop (15/01/19) | Testing | Unit testing for BES | iconectiv | 15/01/2019 | Open | |||||||
22 | WorkShop (15/01/19) | Testing | Unit testing for Fes | Vodafone | 15/01/2019 | Open | |||||||
23 | WorkShop (15/01/19) | Testing | E2E test | ? | 15/01/2019 | Open | 15/01/19 : need to create that before deadline of commiting code. Do we need one. | ||||||
24 | WorkShop (15/01/19) | Technical | CI/CT & CI/CD | Prabhu Balan | 15/01/2019 | Open | |||||||
25 | WorkShop (15/01/19) | Technical | Code commit and upstream | Vodafone | 15/01/2019 | Open | |||||||
26 | WorkShop (15/01/19) | Project Management | Timeline Creation | David, Robin, | 15/01/2019 | Open | |||||||
27 |