Skip to end of metadata
Go to start of metadata

You are viewing an old version of this page. View the current version.

Compare with Current View Page History

« Previous Version 249 Next »

The page is intended to summarize all the requirements for Casablanca Release. These requirements will need to be prioritized to realistically fit within the Casablanca Release Timeline.

This is not yet the Casablanca Release scope. Release Scope will be finalized by M1 Release Planning.

Projects intended to participate within Casablanca release are posted in wiki.

New projects proposal are posted here. These projects need to be reviewed and approved by TSC.

Some of the Use Cases, Functional and non functional requirements are carried over from previous Amsterdam and Beijing Releases as they required multiple releases to be implemented.

The Requirements extracted from SP lists of priorities for Casablanca are covered either by the Use Case, the functional requirements, the non functional requirement or within a project scope of work.


Use Cases 

Use CaseOwner

Projects or functional requirements Impacted

for Casablanca

Link(s) to High Level Design (HLD) /Low Level Design (LLD) (if any)Dependency (from/to) another project(s)T-Shirt Size (XS, S, M, L, XL)*Project's Impact: Test Only (TO), Code (C)Committed (C)/Partially Committed (P) or not (N) per Impacted projectsIf Partially or not Committed, then what are the gaps per impacted project (people/FTEs; HLD/LLD; etc)Company EngagementNotesM4 Status
vFWAT&THPA


All: Test OnlyN/A - part of regression testsN/A - part of regression tests


vDNSAT&THPA


All: Test OnlyN/A - part of regression testsN/A - part of regression tests


VoLTE

China Mobile

HPA


All: Test OnlyN/A - part of regression testsN/A - part of regression tests


vCPEKang XiHPA


All: Test OnlyN/A - part of regression testsN/A - part of regression tests


CCVPN

SO,OOF,  SDNC,UUI, integration

Stretch goal:

SDC, DCAE, external API.

NOTE: No project should be code impacted by this use case.

Materials Lin Meng. Material Jianguo Zeng

All; Test

Code:

SO,OOF,  SDNC,UUI

Stretch goal:

SDC, DCAE, external API, CCSDK

SO:committed,

OOF:committed (Huawei resources as required).

UUI:committed

Integration: committed

SDNC: (Huawei resources as required).

Stretch goal:

DCAE :  Not committed(Huawei &CMCC plan to contribute)

SDC: Not committed

External API:(VDF & huawei plan to contribute)

CCSDK: (Huawei resources as required).

if projects not committed is just in strech goal, then we will dev based on exist features, may impact some usibiligy, but won't impact the final result.

DCAE : From discussion with Xin Miao (Huawei), this usecase requires new RESTCONF collector to be added into DCAE.This cannot be committed for R3 due to pending requirement clarification and architectural alignment besides resourcing constraint.

China Mobile, Vodafone

Contingent that Use Case owner are able to add resources on impacted projects and Integration agreement

ON TRACK

POC Demo planned for ONS at Amsterdam

OSAM/PNF

SO, Portal, External API, APPC, DCAE

HPA

**NOTE: OSAM uses the PNF capability similar to 5G use case. No new development efforts were identified to support OSAM using PNF

VNFRQTS (include PNFs)

OSAM Material

All: Test Only

ATT, Turk Telecom, SwisscomContingent that Use Case owner are able to add resources on impacted projects and Integration agreement

DELAYED

Not M4 Gating

No Component development required for this usecase in Casablanca

Integration testing delayed due to resource contraint.

May need to defer to Dublin

(star) T-Shirt Size: Ballpark estimation for assessing the development/testing activities performed by the project team; not the integration team

  • XS - <4 Man/Weeks;
  • S - ~6 Man/Weeks;
  • M - ~8 Man/Weeks;
  • L - ~12 Man/Weeks;
  • XL - > 12 Man/Weeks.


Functional Requirements 

Functional RequirementsOwner

Projects Impacted

for Casablanca

Link(s) to High Level Design (HLD) /Low Level Design (LLD) (if any)

Priority

(from SP perspective)

Dependency (from/to) another project(s)



T-Shirt Size (XS, S, M, L, XL)*Project's Impact: Test Only (TO), Code (C)Committed (C)/Partially Committed (P) or not (N) per Impacted projectsIf Partially or not Committed, then what are the gaps per impacted project (people/FTEs; HLD/LLD; etc)Company EngagementNotesM4 Status
HPA

VNFSDK (minor)
SDC (minor)
Policy
OOF (minor)
SO (minor)
AAI,
Multi-Cloud
VNFRQTS

HPA Enhancements (For Casablanca Release)

Orange: 2

ATT: 2

China Telecom: 2

China Mobile: 1

Verizon: 2

Vodafone: 2

VNFSDK: none

SDC: VNFSDK, VNFD model

Policy: SDC

OOF: SO, Policy, AAI

AAI: Multi-CLoud


VNFSDK: M
SDC:XS
Policy: M
OOF: S
SO: S
AAi: S/M
Multi-Cloud: M 

VNFSDK (C)
SDC (TO/C)
Policy (C)
OOF (C)
SO (C/TO)
AAI (C)
Multi-Cloud (C)


Policy: Committed based on Intel providing resources

OOF: Committed

VNFSDK: Committed

SDC: committed based on Intel contribution.

SO: committed

AAI: committed based on Intel resources.

Multi-Cloud: committed



Intel
China Mobile
AT&T
VMware
ARM


ON TRACK

All code has been or will be submitted

WARNING

Unresolved dependency on SDC - two bug fixes required.

Change Management -
Flexible designer/orchestrator

SDC, SO, VID

Link to Slide

Orange: 1

ATT: 1

China Telecom: 2

China Mobile: 2

Verizon: 1

Vodafone: 2

VID: on SO

SDC: on SO

SDC:XL

VID: M

Code: SO,VID,SDC

VID: Not committed (Note: VID part is "nice to have" - no dependency on VID from other projects)

SDC: committed based on Amdocs contribution

SO : Committed (with support from ATT resources)


VID: requires additional resources


AT&T, Amdocs


M4 READY

Details

M4 READY

Details

Change Management - traffic migrationSDNC, APPC, VNFSDKLink to Slide

Orange: 1

ATT: 1

China Telecom: 2

China Mobile: 2

Verizon: 1

Vodafone: 2


Code: SDNC, APPC

SDN-C: committed

APPC: Not committed

Orange: Committed

APPC: Not enough details on requirements, plus limited resourcesAT&T, Orange, Intel

M4 READY

Details

M4 READY

Details

Change Management - 5G PNF software upgradeSO, A&AI, Ansible/EM - test only support; SDNC (SDNR)- dev to incorporate 5G PNFsLink to Slide

Orange: 1

ATT: 1

China Telecom: 2

China Mobile: 2

Verizon: 1

Vodafone: 2



SDN-C: CommittedSDN-C: Will use the SDN-R sub-project capabilitiesAT&T, China Mobile, Huawei

M4 READY

Details

M4 READY

Details

Change Management - CM scheduler

OOF, VID

VID - Nice to have - the functionality can still be delivered with OOF only (scheduler would need to be invoked through CLI)

Link to Slide

Orange: 1

ATT: 1

China Telecom: 2

China Mobile: 2

Verizon: 1

Vodafone: 2
VID on OOFVID: SCode: OOF, VID

OOF: Committed

VID: Not committed

(this can still be delivered with OOF)


VID: requires additional resources

AT&T

M4 READY

Details

M4 READY

Details

Scaling

Closed Loop Scaling

(High Priority)

Policy, CLAMP, SO, DCAE


Link to Slides   

Orange: 1

ATT: 1

China Telecom: 1

China Mobile: 1

Verizon: 3

Vodafone: 1

   

CLAMP: on Policy

Policy: on SO

CLAMP: M

Code: SO, CLAMP, Policy

Test: DCAE




CLAMP: Committed with risks (dependency on Policy)

Policy: Committed with risks (TBD)

SO: Committed

DCAE: Committed


AT&T

ON TRACK

All code has been or will be submitted

Scaling

Beijing Improvements

(High Priority)

 Scott BlandfordAPPC, SDNC, SO, AAI, VID

 VID: on SO

APPC: on SO

VID: XS

AAI: XS

Code: APPC, SDNC, SO, AAI

AAI: Committed

APPC: Committed

SDNC: Committed

SO: Committed

VID: Committed


 AT&T

ON TRACK

All code has been or will be submitted

(VID is having issues with test environment) 

Scaling

Controller_Topic_ID

(Medium Priority)

 Scott BlandfordSO

Code: SO

SO: Committed


 AT&T

ON TRACK

All code has been or will be submitted

Scaling

Homing and Capacity Check

(Low Priority)

 Scott BlandfordMulti-VIM, OOF, SDNC, SO OOF: on Multicloud and PolicyOOF: SCode: OOF, SO, SDNC, Multi-VIM OOF: Partially CommittedOOF: Resource issue if R2 solution needs to be extended for new policy constraints. AT&T

POSTPONEDPushed to Dublin

5G/PNF

Plug and Play

SDC, SO, SDN-C, A&AI, CDT, Modeling, VID, DCAE, DMaaP

Link to Slide

Orange: 2

ATT: 1

China Telecom: 3

China Mobile: 1

Verizon: 1

Vodafone: 2

VID: on SO



VID: S

AAI: XS? need clarification on what's expected

OOF: No impact


Code: VID

Test Only: SDC

Code : DCAE


VID: Committed based on Nokia's contribution

SDNC: committed

SO: Committed (with resources from Nokia)

SDC: support based on current sdc capabilities from Beijing.

APPC: No impact

AAI: No code change, only modeling changes

OOF: No impact

DCAE: committed

DMaaP: committed

APPC: Per review of slides, does not appear to be anything specific for APPC in Casablanca. Items mentioned are more longer term, roadmap items

AAI: Expecting this to be modelling/schema updates only but unclear. Need additional information and analysis by AAI SMEs

OOF: Additional information required on policies required for PNF placement


DCAE: Committed based on Nokia's contribution on PRH

AT&T, Nokia,

SUBMITTED

Code has been developed and submitted.

ON TRACK

SO Code Merge

PENDING

Health Checks (PRH wrking) need to be introduced. E2E.Test cases need to be updated (for integration & testing) after1st run of whole flow. Sunny Day scenarios to be prepared (for testing).

5G/PNF

Software Version Reporting

 CCSDK, SDN-CLink to Slide



CCSDK: committed

SDN-C: committed


AT&T



ON TRACK

A&AI and SDC support has been developed.

POSTPONED

Usage in the 5G Software Upgrade Use Case is pushed to Dublin

5G/PNF

Lifecycle Management Support

(Restart, Suspend of PNF)

SDN-C/SDN-R. Controller support for operations. SDNC (SDNR) dev to incorporate 5G PNFsLink to Slide



OOF: Committed

SDN-C: Committed

Will address this via Change ManagementAT&T, China Mobile, Huawei

INVESTIGATING

SDN-C Interfaces need investigation. Want to make sure SDN-C is supporting Ansible.

5G/performance Analysis and Optimization

High Volume and RT Data Collection of PM

DCAE, DMaaP, SDN-R, Link to Slide

Orange: 2

ATT: 2

China Telecom: 1

China Mobile: 3

Verizon: 3

Vodafone: 3

DCAE: on DMAAP (native Kafka support)

OOF: M

DCAE: L


code change: OOF

Code : DCAE


CCSDK: committed

SDN-C: committed

OOF: No Impact

DCAE: Committed (based on Nokia contribution) with dependency risk

OOF: Limited resources


AT&T, Nokia,

DCAE: Edge deployment support for R3, DDS-VES and new analytic platform (flink) not committed due to resource constraint



ON TRACK & CODE SUBMITTED

Code is developed & Submitted.

5G/performance Analysis and Optimization

Bulk PM

 DCAE, DMaaPLink to Slide
DCAE: on DMAAP-DRDCAE:L

code change: DMaaP

Code change: DCAE

DCAE:  DataFileCollector- Committed (based on Ericsson Contribution) with dependency risk

PMMapper - Partial Commit (Based on Ericsson contribution) + dependency risk Not a hard requirement


DCAE: Dependency on DMAAP-DR + PMMapper (Stretch goal)


AT&T, Ericsson



ON TRACK

DMaaP Data Router

PENDING

File collector available but with a few pending tasksPOSTPONED

PM Mapper postponed to Dublin at M3

5G/performance Analysis and Optimization

Optimization Framework Enhancements (Placement, Formulation, Solving)

 OOF

Link to Slide

OOF: Mcode change: OOFOOF: Committed to SON
AT&T, Nokia, Reliance Jio

ON TRACK

All code has been or will be submitted

5G/Network slicingWithdrawn from Casablanca release by the requirement owner

Orange: 3

ATT: 3

China Telecom: 1

China Mobile: 2

Verizon: 2

Vodafone: 3









Centralized Representation and Consistent ID of Cloud Regions,

Plan B, Phase 1: Centralized Representation of Cloud Regions

SO, Integration



Centralized Representation and Consistent Identification of Cloud Regions In ONAP

Orange: 1

ATT: 2

China Telecom: 2

China Mobile: 3

Verizon: 1

Vodafone: 1



code :

SO, Integration


  SO: committed based on Intel's contribution

  Integration: committed






To align MVP, propose alternative action plan B: break this requirement into 3 phases.

Phase 1 is to centralize the representation of cloud regions;

Phase 2 is to apply consistent ID across all related ONAP projects.

Phase 3 is to correlate and align dcaeLocation to AAI's cloud region. This phase requires further discussion, hence not listed here.

Note on "Intel's contribution": This is the synergy effort with HPA, no further special changes needed here. hence this can be deemed as a dependency on HPA's impact on SO.

SO: will be ready to test soon.

Integration: Not started yet.


Centralized Representation and Consistent ID of Cloud Regions,

Plan B, Phase 2: Consistent ID of Cloud Regions

SO,VID,SDNC,OOF,VFC, UUI,MultiCloud.Centralized Representation and Consistent Identification of Cloud Regions In ONAP

Orange: 1

ATT: 2

China Telecom: 2

China Mobile: 3

Verizon: 1

Vodafone: 1

VID/SDNC: on SO

SO/OOF/VFC: MultiCloud

VID: XS

MultiCloud: S

VFC:S

code :

SO,VID,SDNC,OOF,VFC,

UUI,MultiCloud

 SO: not committed

 VID: Not Committed

 SDNC: Not committed

  OOF: Committed

  MultiCloud:Committed 

  VF-C :Committed

  UUI: committed

SDNC: Limited resources

VID: requires additional resources



MultiCloud: Ready to test

VFC: not started yet

UUI: not started yet

Edge Automation Through ONAP (EA)A&AI, Multi-Cloud, OOF, SO

Edge Scoping MVP for Casablanca - ONAP Enhancements

  1. Cloud-agnostic Placement/Networking & Homing Policies (Phase 1 - Casablanca MVP, Phase 2 - Stretch Goal)

Orange: 3

ATT: 3

China Telecom: 3

China Mobile: 3

Verizon: 2

Vodafone: 1

OOF: on MultiCloud & SO

Multi-Cloud: on A&AI



SO: XS

AAI: XS

OOF: M

Multi-Cloud: M-L

Code: OOF, Multi-Cloud, A&AI, SO

Test: Integration (vFW use case)

Casablanca MVP:

  • OOF: Committed
  • Multi-Cloud: Committed
  • A&AI: Committed
  • SO: Committed




M4 on target in relevant projects

Integration Test Plan in Progress: HPA & Cloud Agnostic Intent - R3 Test Plan (In Progress)

Edge Automation Through ONAP (EA)Multi-Cloud

Edge Scoping MVP for Casablanca - ONAP Enhancements

2. Edge Scoping MVP for Casablanca - ONAP Enhancements#ONAPEnhancements-AggregatedInfrastructureTelemetryStreams(AlignswithHPArequirements,CombiningeffortswithHPA)

Orange: 3

ATT: 3

China Telecom: 3

China Mobile: 3

Verizon: 2

Vodafone: 1


Multi-Cloud: M-LCode: Multi-Cloud

Casablanca MVP:

  • Multi-Cloud: Committed



M4 on target in relevant projects

Start Small MVP "Node metrics and HPA metrics from Grafana dash board"

No plan for integration testing.


(star) T-Shirt Size: Ballpark estimation for assessing the development/testing activities performed by the project team; not the integration team

  • XS - <4 Man/Weeks;
  • S - ~6 Man/Weeks;
  • M - ~8 Man/Weeks;
  • L - ~12 Man/Weeks;
  • XL - > 12 Man/Weeks.

Non Functional Requirements 

Non Functional RequirementsOwnerSub-categoryProject Impacted for CasablancaLink(s) to High Level Design (HLD) /Low Level Design (LLD) (if any)Dependency (from/to) another project(s)T-Shirt Size (XS, S, M, L, XL)*Project's Impact: Test Only (TO), Code (C)Committed (C)/Partially Committed (P) or not (N) per Impacted projectsIf Partially or not Committed, then what are the gaps per impacted project (people/FTEs; HLD/LLD; etc)Company EngagementNotesM4 Status
S3P
  • Performance
  • Stability
  • Resiliency
  • Security (see below)
  • Scalability
  • Manageability
  • Usability

Likely ALL depending upon TSC determination of new level requirements per category


Materials

Usability:  New API’s adhere to Versioning strategy

Versioning & API Documentation Recommendations

Manageability: Adherence to ONAP Logging Spec v1.2




Portal: on AAF, MUSIC, OOM

VID, Policy, SDC, AAI: on Portal

Portal: XLPortal: Code

Portal: Not Committed

APPC: Partial

DCAE: Partial

SDC: committed

VID: Partial (depends on Portal)

AAI: Partial

Portal: See Risk #2

APPC: Please refer to M1 Planning template for details

DCAE: Refer to DCAE R3 M1 Release Planning#PlatformMaturity for details

AAI: Please refer to AAI R3 Platform Maturity




Portal: IBM (only forAngularupgrade - shown interest, but not committed yet)

Portal:

1) Looking for resources who can help with adhering logging standards, API versioning and kubernetes deployment of Portal dockers.

2) Furthermore, Portal requires a security expert in addressing angular upgrade to address the Nexus-IQ reported vulnerability (the angular upgrade its self is XL t-shirt size task).


Security

Note: This does not cover what is in S3P. However, based on that it is expected to have a certificate or use CADI to get certificates to enable secure communication

Pluggable authentication and Authorization (Use of CADI and ?):

  • JAVA projects to use CADI client and enforcement point
  • Non-JAVA projects:Wait until there is multi-language.
  • All projects either need to have certificates (for secure communication) (based on a common trust store of AAF).  The certificate distribution can be part of deployment mechanism and will be further detailed.

Secure communication toxNFs(Security for 5G Use cases). DCAE, APPC, VFC? VNF requirements. (Secure Communication to Network Functions)
- TLS and/or SSH for netconf (APP-C, SDN-C, CCSDK)
- HTTPS security for VES (DCAE) (with certificates, slowly deprecating username/pasword)

  • Description of how the xNFs will get their certificates (VNFreqs). 

Vnf package security following SOL 004: SDC, VNFreqs, VNF SDC


Materials

CADI/AAF Integration:


Portal: on AAF

Test coverage (js):

(1) js Sonar plug-ins activation

(2) min. 3 additional containers per application

=> Jenkins enhancements

(3) Maven build to be updated

Risk #1

DMaaP on AAF

DCAE on AAF, OOM,DMAAP

OOF on AAF

Portal (CADI): M

DCAE: XL

SDC: L

Test coverage (js):

All: M/L


Portal: Code

SDC: code

VID: Code

Portal: Not Committed

APPC: Partial

OOF: Partial

DCAE: Not Committed

SDC: Partial

VID: Partial (depends on Portal)

AAI: Partial


Portal: See Risk #3

APPC: Please refer to M1 Planning template for details

DCAE: Refer to DCAE R3 M1 Release Planning#PlatformMaturity table for open issues/question with current proposal

OOF: Please see OOF Casablanca M1 Release Planning Template

SDC: because of the size of the sdc source code we will be able to reach only 10% unit test coverage on the Javascript. VNF package security missing information.

AAI: Please refer to AAI R3 Platform Maturity


Portal: Looking for resources who understand the AAF based certificate management to upgrade using CADI client in Portal.


OOF: Need more clarity on AAF support for python projects in Casablanca


Upgrade (from Beijing to Casablanca)



All: XL

APPC: Not Committed

CLAMP: Not Committed

DCAE: Not Committed

SDC: not commited

VID: Not Committed

AAI: Not committed

APPC, CLAMP, Portal, SDC, DCAE, VID, AAI: Lack of resources require additional information (does it include rollback, retrofit, no impact on run-time, etc)?





Architecture Alignment

  • API improvement
  • Realtimestreaming
  • K8S Support (for VNFs)



DCAE on DMAAP (for DR)

DCAE:XL

DCAE:Partial Commit (New service committed based on Ericsson/Nokia)

SDC: partial

MultiVIM: Committed

External API: Committed

SO: Partially committed

A&AI: partially committed

CCSDK: committed

DCAE:  DDS-VES and new analytic platform (FLINK) not committed due to resource. xNF-DCAE authentication not committed due to open issue listed under security.

SDC: policy designer not planned for Casablanca, ETSI compliance only sol004 is planed. PNF suport will be done ontop of the existing capabilities. RTC stretch goal. DCAE-DS committed. Flow designer committed.

ExtAPI: Interlude is a stretch goal

SO: "decomposition" committed; "service instantiation" stretch goal

A&AI: abstract topology sync-up committed



Reviewed and accepted at M3 reviews
HEAT support

HEAT-based ONAP deployment support should be dropped once OOM-based ONAP deployment's issues are fully identified and resolved.

Recommendation from TSC: keep supporting HEAT in Casablanca for testing and integration purposes. However, HEAT won't be a gating item at Release Sign-Off.


Portal: on OOM

Portal: S

SDC:S

Portal: Code

SDC: code

Portal: Not Committed

APPC: Will support Heat partially

OOF: Support HEAT for testing

SDC:committed

VID: Partially

Portal: See Risk #4
Portal: Switching CSIT jobs from using HEAT based to OOM based requires resources who can understand the current setup.
Internationalization language supportTao Shen
  • User Experience

Design language/internationalization component in Portal and provideserviceapistopartnering apps like Policy, VID, SDC, AAI

Note: This will need to go through the whole process (Architecture review,...) to understand whatthesdk will be providing and dependenciesonother ONAP project (Portal, SDC,...)

As per Lingli and Tao from chinamobile, this is reviewed and approved by Arch Team.


UsecaseUI: on PortalPortal: LPortal: Code

Portal: Partial

APPC: Not Committed

CLAMP: Not Committed

SDC: Not committed

VID: Not committed

Portal: Limited resourcesPortal: AT&T, ChinaMobilePortal: Policy, VID, SDC, AAI can choose to use this Internationalization feature based on their capacity. Only UsecaseUI team is committed to develop and use this feature for now in Casablanca.

POSTPONED

Due to lack of resource, this is postpone to Dublin Release

Testing
  • Unit tests
  • CSIT tests

Most UI projects with javascript.

Recommendation from TSC: This is related to Code Coverage: recommendation is to keep 50% Code Coverage for Casablanca including JavaScript. (In Beijing Release code coverage was only covering Java and Python code, not javascript)


Linux Foundation Unit test and CSIT coverage framework,

Policy, VID, SDC, AAI: on Portal, DCAE (for JavaScript coverage)

Portal: XL

SDC:S

VID:S

Code: portal, SDC, VID


Portal: Partial (no Javascript)

APPC: Partial, Java code will maintain 50%, no commitment for Javascript

CLAMP: Partial, Java code will maintain 50%, no commitment for Javascript

DCAE:Partial (except javascript)

SDC: maintain 50% coverage for java and python

add 10% coverage for UI(java script)

VID: maintain 50% coverage for java

add 10% coverage for UI (java script)

AAI: Partial, Java code will maintain 50%, add 10% coverage for sparky (javascript)

Portal, APPC, CLAMP, DCAE: See Risk #1


Portal: AT&T, IBM, TechM

 modeling Hui Deng

 SDC: needs to support composite pattern in R3

SDC/SO/A&AI needs to support Service Order, Service Catalogue, service scaling

Modeling runtime needs to be supported by A&AI in release 3





SDC:not committed

SO

A&AI - changes to the run-time schema require significant refactoring in all of AAI's client applications. That refactoring might be planned and addressed in R4; for R3, perhaps mapping existing runtime schema to new model definitions can suffice?

SDC: late submission to the requirements for Casablanca, not clear on what are the requirements from sdc.


(star) T-Shirt Size: Ballpark estimation for assessing the development/testing activities performed by the project team; not the integration team

  • XS - <4 Man/Weeks;
  • S - ~6 Man/Weeks;
  • M - ~8 Man/Weeks;
  • L - ~12 Man/Weeks;
  • XL - > 12 Man/Weeks.



  • No labels