Notes
- JIRA board - https://jira.onap.org/secure/RapidBoard.jspa?rapidView=53&view=planning&selectedIssue=LOG-248&epics=visible
- RC2 pushed out to 2 days from now.
- Meetings Past
- Last 2nd friday - Log(ELK) security review - https://lists.onap.org/pipermail/onap-discuss/2018-May/009695.html
- Last 2nd Friday - ELK performance review - was private - all onap and acumos meetings should be posted to onap-discuss
- Last 2nd Monday - Acumos Log Spec Sync (AT&T and Amdocs only - next one will be in public)
- Last Thu - ELK performance hands on 2 - https://lists.onap.org/pipermail/onap-discuss/2018-May/009822.html
- Last Fri - ELK security review 2 - https://lists.onap.org/pipermail/onap-discuss/2018-May/009833.html - not enough traffic to verify
- Today - Arch subcommittee review of POMBA
- Meetings Future
- follow up - ELK performance hands on 3 - To book
- follow up - ELK security review 2 - To book with AAF - friday
- Patches Merged - https://gerrit.onap.org/r/#/q/status:merged+project:+logging-analytics, https://gerrit.onap.org/r/#/q/status:merged+project:+oom
- Log4j Wrapper code
- - LOG-115Getting issue details... STATUS
- https://gerrit.onap.org/r/#/c/48433/
- - LOG-181Getting issue details... STATUS
- https://gerrit.onap.org/r/#/c/48139/
- Log4j Wrapper code
- Patches Pending - https://gerrit.onap.org/r/#/q/status:open+project:+logging-analytics.
- Critical JIRAs
- - LOG-258Getting issue details... STATUS
- - LOG-409Getting issue details... STATUS
-
-
LOG-230Getting issue details...
STATUS
- Logging Pair Wise Testing for Beijing Release - needs more "component logs make to ELK" testing
- - LOG-245Getting issue details... STATUS
- - LOG-399Getting issue details... STATUS
- Scope Changes
- Scope Change: POMBA architecture scope change review postponed until post 22 May (arch conference) - now 29th May
-
-
LOG-196Getting issue details...
STATUS
- https://lists.onap.org/pipermail/onap-discuss/2018-May/009660.html
- Logging Scope Change for POMBA seed code
- will likely be raised by Chris after - ONAPARC-153Getting issue details... STATUS
- Scope Change: integration with acumos logging
- TBD
- Scope Change: CD/deployment scripts templates (rancher, azure, cd) - moved from OOM-710 to
-
LOG-320Getting issue details...
STATUS
- merged - planning scope change review by Arch team 5 June
- Healthcheck up to 41/43 https://lists.onap.org/pipermail/onap-discuss/2018-May/009814.html
- both systems in sync
- Cross Team
- Collaborate with the AAF project on securing our 3 ELK ports
- CLAMP is running a full ELK stack - raised collaboration JIRA to move the stack to a common chart (we are on 5.5.0 they are one 5.5.9)
- External ELK stack discussion Shishir Thakore - LOG-190Getting issue details... STATUS
- Acumos integration Shishir Thakore and Michael O'Brien - - LOG-264Getting issue details... STATUS
- TODO:
- ? June - 2nd log spec demo - arch review
- Review service mesh log overlap
- review MDC grouping
- Provide MDC documentation for Acumos in ONAP - expand our doc
- governance: Shishir Thakore Q: logging compliance - TSC requires 2 things - logs make it to the elk stack, and that the MDC format/req are in spec (need a junit? to point to or for the teams to run)
- Lee Breslau and Cheuk Yiu Horace Ip - thank you very much
- Mike to post wiki grid checklist from TSC for PTLs to fill out - eventual goal is an lf jenkins job - via ciman