Skip to end of metadata
Go to start of metadata

You are viewing an old version of this page. View the current version.

Compare with Current View Page History

« Previous Version 15 Next »

zoom bridge: https://zoom.us/j/283628617

Duration 60 minutes

DurationAgenda ItemRequested byNotes / Links
START RECORDING
5minOpen Issues Review
5min

Emergency Maintenance Release - Tag: 3.0.2

  • Known participants: A&AI, DMaaP, CLAMP, VID, Policy, Portal
  • Possible security patches (Non certif) from: SDNC (python lib), APPC, CCSDK
  • Integration needs 5 working days to complete the sanity and verify use cases.
  • Readthedocs

TSC-120 - Getting issue details... STATUS

Timeline:

  • Updated images available:2019-04-04
  • Basic sanity test complete: 2019-04-05
  • Use case testing complete: 2019-04-08
  • Release notes updated: 2019-04-10
  • ONAP component images publicly available: 2019-04-10

Current status: Partial testing complete and use cases, focused testing on basic functionality. Document updates required for all the changed components and use case docs. Need update at top level of RTD.

5min

M4 Preparation

  • Integration Blockers
  • Risks
  • Projects
  • Requirements
  • oParent Integration
  • Containers Procedure from Integration/OOM Teams

Please update M4 checklist by April 10th, 2019 noon - thank you

Former user (Deleted)

Code Freeze. Mark the end of the Features coding.

Jira issues are either fixed in the current release or assigned to next release.

100% of Functional Test Case are automated.

End 2 End Release Test Cases are implemented (Integration Team).

All new VNF Requirements planned for the release reviewed and  implemented in VNF Requirements project.

10minCII Badging Grant/Right AccessProvide the procedure to add CII badging Grant/Access
10minOOM/Integration process
10minOne LDAP group per repo - a proposal
5min

grafana (http://onapci.org/grafana/login)

External Labs Jenkins Jobs: https://jenkins.onap.org/view/External%20Labs/

cl664y@att.com

AAF calling conventions

With Dublin, AAF needs the Namespace in the URL.

If your URL has "https://aaf-locate:8095/locate/org.osaaf.aaf.service:2.1", it needs to be

WHERE NS=onap

https://aaf-locate.onap:8095/locate/onap.org.osaaf.aaf.service:2.1

If you go direct:

https://aaf-service.onap:8100/....


AAF Team does not know how teams are currently deploying their Configs.

Please contact Jonathan for help here, and/or with new Cert Volume method... Need to have this deployed before we change these others.


OOM commits processMandar Sawant

Action Items

  • 2/11: Migrate Docker image releases from Nexus3 into Docker Hub (Architecture Independence) by Dublin M4. 
    <2-15-2019> Preparing a preso for review of all known infrastructure change requests for review at PTL meeting 2-25-2019
    <2019-04-08: global-jjb progress report: start on DCAE soon - focus on El Alto delivery (precursor to Dockerhub)
  • Oom values.yaml or integration repo manifest ( TSC-86 - Lock down docker image tag name source of truth - oom values.yaml or integration repo manifest - A: both but manifest is the source SUBMITTED ) Michael O'Brien

    if not covered - see TSC 2019-01-10

    Quick discussion on nailing down whether we need a yaml override of the deployable

    docker image tags in the oom repo (understanding is no) - with the integration docker manifest

    (manifest is currently a copy of the oom values.yaml tags - not the reverse)

    If not - then we need a documented procedure wiki/RTD on running a derived values.yaml override for the entire system before deployment

    AAF is only an example here

    https://git.onap.org/oom/tree/kubernetes/aaf/charts/aaf-service/values.yaml?h=casablanca#n28

    image: onap/aaf/aaf_service:2.1.8

    drives

    https://git.onap.org/integration/tree/version-manifest/src/main/resources/docker-manifest.csv?h=casablanca#n11

    onap/aaf/aaf_service,2.1.8
    20190318: discussed discrepancy with Orange in OOM call last week - manifest is still in use to manage versions until merges come into OOM from the teams and we finish the architecture of the merged manifest in oom

    OOM Meeting Notes - 2019-03-13

    <1-7/2019> Integration team to document the procedure.<01/13/2019> Answer from Integration team: docker manifest under integration repo is the source of truth, and is used by Integration team to override OOM values.yaml when deploying ONAP in Openlab. See the instructions at the bottom of page https://onap.readthedocs.io/en/casablanca/submodules/integration.git/docs/onap-oom-heat.html#onap-oom-heat-template
    <1-21/2019> Procedure should include Timers, dependencies, etc.
    just need to define all the --set and -f overrides like the following 

    sudo helm deploy onap local/onap --namespace $ENVIRON -f $DISABLE_CHARTS_YAML  -f $DEV0_YAML $APPENDABLE_ENABLED_FLAGS --verbose

    <1-28-2019>: Document how to handle the latest 3rd party image from github.
    <2019-02-19>: One over-ride that will be shared, parent over-ride for docker versions, Michael O'Brien to modify TSC-86 to reflect process. Still looking at tool to institute changes for all projects (single commit). Mike Elliott FREEMAN, BRIAN D Gary Wu Sylvain Desbureaux to follow up offline. 
    It should also consider the problem identified with the Casablanca Maintenance Release:https://lists.onap.org/g/onap-tsc/message/4641
    <2019-03-01 - Need a date for the delivery of the procedure >

  • Tlab persistent storage IO architecture cl664y@att.com
  • How to consume Alpine? Adolfo Perez-Duran (Deactivated)
  • Modify code freeze checklist to include a certificate expiry check Former user (Deleted)
  • What is the plan for the June ONAP Developers Forum - dates/location/etc  Kenny Paul
    <includes outreach to education - looking at universities>
    <Virtual meeting? - still under investigation>
  • Helm Chart Transfer: 4 projects have been identified for trial: A&AI, Log, Policy, APPC, CLAMP and ONAP CLI. Mike Elliott will work with PTL to gather/transfer knowledge and create training materials. Training to be done the week of Jan 14 and PTL to provide their commitment or not by M1 on Jan 24.
    <1-7/2019>: Work in progress. Schedule might shift to another week. Michael will follow-up with Mike. Training will be open to everybody. The objective is that each team will take over the management of their Helm Charts. 
    <1-28/2019>: Meeting is organized on 1/29 with LF. Training will be organized early in February. Additional information on the next PTL call (2/4)
    <2019-2-19: Meeting on this topic today - review the process - develop training material. OOM subcharts complete - A&AI this week>
    <2019-03-04: Ready to do the first project A&AI; after testing on the first project make video on process flow, several others will follow Jessica Gonzalez Mike Elliott>
    <still working out the A&AI details - in progress; once the POC is complete the other repos will follow>
    <2019-04-08: LF releng - Pushed a patch to a code transfer (test) branch to test out an approach and testing verify job. Once proved out need to work with down stream CI/CD before wholesale push. >


  • No labels