Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

1. Project Overview

...

2. New component capabilities for Guilin, i.e. the functional enhancements


DCAE Focus for R7 

  • Address ONAP R7 Usecase & Functional requirement 
  • Address TSC/SECCOM MUST-HAVE non-functional requirements
  • General platform optimization 
    • DCAE Bootstrap/CM Manager optimization 
    • MOD catalog/UI redesign (POC)
    • Addressing DCAE back logs  + security fixes

Refer DCAE Guilin Scope  for more details


Following new components introduced for Guilin part of E2E slicing usecase

Event Processors

  • DCAEGEN2-2258 - Data Extraction Exposure Service (DES) under DataLake Handlers framework.

...

For Guilin, new MOD Front-End and Back-end components is being worked as PoC tracked under REQ-326 -Self Serve Control Loops (this would eventually replace NiFI based UI/processor in subsequent ONAP release)


Image RemovedImage Added

3. New or modified interfaces

...

  • VESCollector - Yes

4. Interface naming

https://wikilf-onap.onapatlassian.orgnet/wiki/display/DW/DCAE+R4+M1+Release+Planning#DCAER4M1ReleasePlanning-APIIncomingDependencies

5. Reference to the interfaces

...

VES Collector Performance Test

PM-Mapper performance baseline

Datafile Collector (DFC) performance baseline results

HV-VES Performance Test


7. Involved use cases, architectural capabilities or functional requirements

...