Versions Compared
compared with
Key
- This line was added.
- This line was removed.
- Formatting was changed.
Info | ||
---|---|---|
| ||
|
Key Information About MultiCloud-landingpage
Project Approval Date | ||
Lifecycle Status | incubation | |
Project Technical Lead (PTL) | ||
Current Committers | ||
Honor Committers (Resigned Committers) | , zhang ab Xiaohua Zhang | |
Meeting Info | [multicloud] ONAP7, Wed UTC 13:00 / China 21:00 / Eastern 09:00 / Pacific 06:00 | |
Meeting Minutes | 2018 MULTICLOUD MEETING MINUTES | |
Mailing- List | #MULTICLOUD | |
Repo(s) | https://gerrit.onap.org/r/#/admin/projects/?filter=multicloud | |
JIRA | ||
Community Statistics | https://onap.biterg.io/goto/cabae96401aaa62d9b823caae094c565 | |
IRC (if used) | N/A | |
CII Badge | https://bestpractices.coreinfrastructure.org/en/projects/1706 | |
Code of Conduct | LFN code of conduct applies https://lfprojects.org/policies/code-of-conduct/ | |
Documentation | https://docs.onap.org/projects/onap-multicloud-framework/en/latest/MultiCloud-Architecture.html |
Description:
We need to clean up the wiki. Things are too hard to find. having a standardized landing page for each project will really help that problem.
Table of Contents | ||||
---|---|---|---|---|
|
Release Lifecycle Artifacts
Casablanca
- M1 Release Planning
- M1 Release Planning Checklist
- M2 Functionality Freeze
- M3 API/Data Model Freeze
- M4 Code Freeze
- RC0 Checklist
- RC1 Checklist
- RC2 Checklist
Beijing
- M1 Release Planning Checklist
- M2 Functionality Freeze Checklist link
- M3 API Freeze Checklist link
- M4 Code Freeze Checklist link
- RC0 Checklist link
- RC1 Checklist link
Amsterdam
M1 Release Planning Template
- M1 Release Planning Checklist
- M2 Functionality Freeze Checklist link
- M3 API Freeze Checklist link
- M4 Code Freeze Checklist link
- RC0 Checklist link
- RC1 Checklist link
Other Project Material
Meeting Minutes
Architecture Documents
High & Highest Priority Open Bugs
Jira Legacy | ||||||||||
---|---|---|---|---|---|---|---|---|---|---|
|