...
USE CASE / REQUIREMENT | DESCRIPTION | WIKI |
---|---|---|
OOF SON (PCI) | Optimization and SON functions for 5G RAN which provide for self-optimization, self-healing and self-configuration | R7 OOF SON Use Case |
5G SERVICE MODELING & DEFINITION | Defining and modeling a 5G Service (in Design Time) and the associated Modeling (Platform information & data model). This is driven by 3GPP TS28.540 and TS28.541, the 5G NRM. | R7 5G Service Modeling |
ONAP/3GPP & O-RAN Alignment: Standards Defined Notifications over VES | The capability to receive, validate and process standards defined notifications encapsulated in VES events in ONAP. | ONAP/3GPP & O-RAN Alignment-Standards Defined Notifications over VES |
ONAP/3GPP & O-RAN Alignment: A1 Adaptor Extension | A1 Adaptor extension for Standards Harmonization. ONAP acting as Non RT-RIC; ONAP sending policies A1 policy. | ONAP/3GPP & ORAN Alignment: A1 Adapter extensions |
5G NRM (CM) | 5G Network Resource Model introducing Configuration Management (CM Updates) using RESTful (HTTPS) Interface (instead of NetConf) | 5G Network Resource Model (NRM) Configuration in R7 |
E2E NETWORK SLICING | 5G Network Slicing defines slices to be used in 5G RAN systems. Network Slicing is a long-lead multi-release development. | E2E Network Slicing Use Case in R7 Guilin |
BULK PM: PM CONTROL | PM Control/“PM Control plane” in ONAP has been introduced in Rel 6 to complete Bulk PM use case enabling configuration of PM jobs/subscriptions on xNFs. | Bulk PM/ PM Data Control Extension |
INTENT BASED NETWORK | The Intent-based Network (IBN) is applied to the configuration and optimization of network functions based on the Intents. The current version of IBN is applied to the opening and closed-loop operation of network slices in the 5G use case. | Intent-Based Network |
CCVPN - Transport Slicing | Realization of 5G TN NSSMF by using standards, models, and architectures from ETSI ZSM, IETF/ACTN, 3GPP, etc. We also leverage the existing functionality from CCVPN (e.g., physical network configurations). Furthermore, Transport Slicing is integrated with the E2E Network Slicing use case. | https://docs.onap.org/projects/onap-integration/en/latest/docs_CCVPN.html |
...
USE CASE REALIZATION CALLS (MOM)
R7 Use Case Realization Meetings Meeting Register MoM
SUPPORTING DOCUMENTATION & PRESENTATIONS
...
U/C | AAI | AAF | CLAMP | CCSDK | DCAE | Ext API | Model | M-VIM | OOF | Policy | Portal | SDN-C | SDC | SO | UUI | VID | VNF REQTS | VNF SDK |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
OOF SON | YES C&PS Depend | YES | YES | YES | YES | |||||||||||||
5G Svce | YES | |||||||||||||||||
SD VES | YES | YES | YES | |||||||||||||||
A1Adap | YES | Possible | YES | |||||||||||||||
NRM | YES | Possible | ||||||||||||||||
E2ESlice | YES | YES C&PS Depend | YES | YES | YES | YES | YES | YES | YES | YES | ||||||||
PM Ctrl | YES | |||||||||||||||||
PnP | CMPv2 Depend | YES | YES | |||||||||||||||
POB | YES | |||||||||||||||||
SW Upg | YES | YES | ||||||||||||||||
C&PS | TEST | YES | Depend | Possible | YES | YES | ||||||||||||
CMPv2 | YES | YES | ||||||||||||||||
License Mgmt | YES | YES | ||||||||||||||||
MDONS | (Test Only) | YES | (Test Only) | YES | YES | |||||||||||||
IBN | YES | YES | YES | YES | YES | YES | ||||||||||||
Use Case | AAI | AAF | CLAMP | CCSDK | DCAE | Ext API | Model | M-VIM | OOF | Policy | Portal | SDN-C | SDC | SO | UUI | VID | VNF REQTS | VNF SDK |
...
...
Topic | Link | ||||||||
---|---|---|---|---|---|---|---|---|---|
Use Case Way of Working | ONAP Use Case / Requirements Teams Process Way of Working (WoW) | ||||||||
Use Case Template | |||||||||
MODELING Planning Page | ONAP R7 Modeling High Level Requirements | ||||||||
MODELING Generic Information Element Template | Generic Information Element Template | ||||||||
R7 Requirements Proposal Page | Guilin release - functional requirements proposed list | ||||||||
ARCHITECTURE Review Template | R7 Guilin Architecture Review (template) - functional requirements | ||||||||
ARCHITECTURE Review Process | Project Architectural Review Requirements and Process (Draft) | ||||||||
Business Driver Template | Business Driver Template for Use Cases | ||||||||
REQ-1 |
| ||||||||
R7 Release Tracking Page Jira Dashboard | Guilin Release Requirements | ||||||||
Use Case Realization MOM | R7 Use Case Realization Meetings MoMMeeting Register MoM | ||||||||
R7 ONAP Marketing Key Updates | Guilin Release Key Updates |