Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

...

The integration test case for CCVPN use case, it incloud include third party system registration, SDC design, service LCM, closed loop.

...

Module introduction:

Module

Function

ONAP

The onap ONAP system for automation operation.

SOTN Controller

A third party controller for OTN network.

SD-WAN Controller

A third party controller for SD-WAN solution

...

The test for ONAP to SOTN choreography of the business management, business deployment environment adopting physical manual deployment patterns, ONAP not deploy work, only do business configuration and otns OTN PNF SOTN automatically discover functions. The network elements of this test include CPE, NCE 3rd SOTN controller and OTN equipment.

5.1  Test Accounts

Name

Responsibility

Account

Administrator

Responsible for system management; Personnel permission configuration; ONAP external system registration; Operational life cycle management

demo/demo123456!

DisignerDesigner

Service template design

cs0008/demo123456!

Tester

Service template test

jm0007/demo123456!

Governor

Service template approve

gv0001/demo123456!

Operator

Service template distribution

op0001/demo123456!

...

Test No:

TEST-01

Project:

ONAP ESR

Sub Project:

3rd SDNC controller registration

Objective:

support SOTN controller registered to ESR-SDNC

Pre-conditions:

  1. 3rd SOTN Controller have beed been installed

Test step:

  1. Login to ONAP by administrator user.
  2.  In the ONAP esr-sdnc UI, click Register button to Register SDNC information (IP, port, authentication information, etc.) of SDNC manufacturer, click next to fill in the next page, and finally click save button to complete registration.


Test Result:

  1. We can find SOTN controller registered in ESR-SDNC portal.

Observation:

When SOTN controller registered to ONAP. Wait for minutes, SDNC will synchronize the network topology to ONAP. Please check the topology datas data of AAI.



6.2  SD-WAN Controller Registration

Test No:

TEST-02

Project:

ONAP ESR

Sub Project:

3rd SDNC controller registration

Objective:

support SD-WAN controller registered to ESR-SDNC

Pre-conditions:

1. AC have beed 3rd SD-WAN controller have been installed

Test step:

  1. Login to ONAP by administrator user.
  2.  In the ONAP esr-sdnc UI, click Register button to Register SDNC information (IP, port, authentication information, etc.) of SDNC manufacturer, click next to fill in the next page, and finally click save button to complete registration.


Test Result:

  1. We can find AC 3rd SD-WAN controller registered in ESR-SDNC portal.

Observation:


...

Test NO:

TEST-04

Project:

SDC Service Design

Sub-project:

Design CCVPN services: SOTN VPN Infra Service?, Site Enterprise Service?, Site DC Service?, SDWAN VPN Infra, Wan Connection Service

Objective:

SDC support to design CCVPN services

Pre-condition:

  1. All resources have been ready.

Test step:

  1. Designer login to ONAP?click “add service” to create a service template?

2. Enter the service general parameters?

inclouding

including name?category?select ‘E2E service’??description?contact ID?project code etc

?

. click

‘Create”t

‘Create” to create service template.

‘Saved successfully’ information will be shown.

3. Enter ‘Composition’ item?select resources needed for the service.

4. Enter ‘Properties Assignment’ item?config the

paramters

parameters of the resources?click ‘Declare’ button to declare the parameters of resources as service inputs.

5. Click ‘submit for testing’? ‘Submitted for testing

successfully’will

successfully’ will be shown.

6. Tester login to ONAP?click the service to test?and then click ‘start testing’ to test the service template. After test, click ‘accept’.

7. Governor login to ONAP to approve the service template.

8. Operator login to ONAP to distribute the service template.


Test result:

  1. The services for CCVPN created successfully.
  2. 2.        CCVPN services distributed to A&AI and SO.

Observation:





...

8.1  SOTN TOPO Automatically synchronization.

Test NO:

TEST-05

Project:

Servoce Service LCM

Sub-project:

SOTN network topology synchronized to ONAP

Objective:

SOTN network topology can be synchronized to ONAP and be saved in A&AI.

Pre-condition:

  1. All OTN network PNFs are ready.
  2. NCE 3rd SOTN controller is ready and the OTN PNFs have been added to NCEit.

Test steps:

  1. Administrator login to ONAP?click “AAI UI ->view & inspect”?to view the topology synchronized from 3rd SOTN controller.
  2. Check the nodes of A&AI that used to save topology information.

Test result:

  1. We can find the topology data in A&AI

Observation:


...

8.2  SOTN cross-domain/cross-onap ONAP link management

Test NO:

TEST-05

Project:

Servoce Service LCM

Sub-project:

SOTN network topology management

Objective:

UUI can support to view the topology of network and create cross-domain/cross-onap ONAP links.

Pre-condition:

  1. All OTN network PNFs are ready.
  2. NCE 3rd SOTN controller is ready and the OTN PNFs have been added to NCEit.
  3. NCE 3rd SOTN controller have been registered to ONAP ESR

Test steps:

  1. Administrator login to ONAP?, click “UUI ” “UUI” to Enter enter the use case UI.
  2. Click ‘Topology management ’ management’ to manage the topology of OTN network.
  3. Click ‘Add link’ to add cross-domain/cross-onap links.

Test result:

  1. We can find the topology data in UUI. To show the ONAP topologies.
  2. When we add the cross-domain link , a link will be shown between different domains.
  3. When we add the cross-onap ONAP link, a link with an onap ONAP icon will be shown in the portal.

Observation:


...

Test NO:

TEST-06

Project:

Service LCM

Sub Project:

Service instantiation for CCVPN services: SOTN VPN Infra Service?, Site Enterprise Service?, Site DC Service?, SD-WAN VPN Infra service, WAN Connection Service.

Objective:

The services for CCVPN can be instantiated and the CPEs from two different service provider can talk with each other.

Pre-condition:

  1. Four services for CCVPN have beed been designed and distribute successful.
  2. The 3rd SOTN controller and SD-WAN controller have been installed and registered to ONAP.
  3. The topology of the network have beed been synchronized to ONAP and the links cross domain/cross onap ONAP have been created by UUI.

Test step:

  1. Administrator login to ONAP portal?select ‘UUI-biz’ to entery entry use case UI.

2.Click

Usecase UI

UUI item “Services”?and select ‘Services’ Tab.

3. Select customer and

serviceType

service type

4. Click ‘create’ to create services.

5. On ‘Create Service’ dialog, select the service template and enter the inputs for the service.

6. Click ‘OK’ to instantiate a service.

7. We need to create the services follow the sequence: SOTN VPN Infra Service, SD-WAN VPN Infra Service, Site Enterprise Service, Site DC Service.



Test Result:

  1. All service can be created successfully.


Observation:

  1. Check the SOTN controller, we can find the SOTN EPL created.
  2. Check the SD-WAN controller we can find the SD-WAN instance created.
  3. Check the terminal points that connect to CPE/vCPE for OTN network, they can reach to each other.
  4. Check the sites between two different ONAP, try to ‘Ping’ from one CPE to another,

It can connect to each other.

  1. For two CPEs, they can connect to each by internet or OTN sepecial special connectivity.

8.4      Service termination

Test NO:

TEST-08

Project:

Service LCM

Sub-project:

Service termination for CCVPN services: SOTN VPN Infra Service?, Site Enterprise Service?, Site DC Service?, SD-WAN VPN Infra service, WAN Connection Service

Objective:

The services for CCVPN can be terminated.

Pre-condition:

  1. Four services for CCVPN have been created successfully.

Test step:

  1. Administrator login to ONAP portal?select ‘UUI-biz’ to entery entry use case UI.

2. Click

Usecase UI

UUI item “Services”?and select ‘Services’ Tab.

3. Select customer and

serviceType

service type

4. Select service and click ‘delete’ to delete services.

5. Click ‘OK’ to terminate a service.

6. We need to delete the services follow the sequence: Site DC Service, Site Enterprise Service, SD-WAN VPN Infra Service, SOTN VPN Infra Service.

Test Result:

  1. All service can be deleted successfully.


Observation:

  1. Check the SOTN controller, we can find the SOTN EPL deleted.
  2. Check the SD-WAN controller we can find the SD-WAN instance deleted.
  3. Check the AAI in two ONAPs, all services for CCVPN are deleted.

...

Test NO:

TEST-09

Project:

Closed Loop

Sub-project:

Closed Loop in ONAP SOTN link

Objective:

ONAP can find SOTN network cross domain link interruption automatically, and rebuild SOTN business automatically.

Pre-condition:

  1. All elements of OTN network TOPO environment has been completed.
  2. CCVPN services have been created and bussness bussiness is working fine.

Test step:

  1. Interrupt the cross domain link in the CMCC side ONAP manually.


Test Result:

  1. Closed-loop triggered automatically, SOTN link will be recreated through another cross domain link.


Observation:

  1. Check all the CCVPN services are work fine as in “CCVPN Service Instantiation”

...