- June 28, 2017 Workflow review
Chengli Wang and Lingli Deng from China Mobile presented VoLTE use case. They went through the work flow for service design, instantiation, auto healing/auto scaling and termination. 31 Participants joined the meeting and discussion. The meeting recording can be accessed here: https://zoom.us/recording/play/zClGuWa2cFq-g3YEWC-sZ74V9iJaHAx2Iw7ePKuhh1q1ttjSSFXRyoJhYxpmk8bC
Meeting minutes:
At high level, there are edge and core data centers in the use case. EPC components split between edge and core data centers. Similarly IMS components also split between edge and core. A WAN network with underlay and overlay connects the two data center.
...
5. Depend on the interface and capability of SDN local controller, we will decide in the next meeting how modules (MultiVIM, Neutron, SDN local controller, SDN WAN controller, DC-GW) work together to provide VXLAN overlay between data centers via EVPN.
July 20, 2017 DC Gateway Local Controller Interface
During the meeting, we discussed local DC gateway controller sample APIs to manage EVPN VXLAN overlay network between two data centers.
- Explained one option of how DC gateway controller interacts with DC gateway, Neutron and compute node.
- Discussed DC gateway controller sample APIs to create L2&L3 EVPN VXLAN overlay network between DCs. Other APIs to support read, update and delete EVPN VXLAN overlay network are also available. SDN-C team agreed that the APIs looked good.
- VIM team and Multi-VIM team also described other options for DC network to support VXLAN overlay. We will have further discussions of those options after R1.
The action items:
- Have a table to define the source for the parameters (import route target, export route target, networks, etc.) used in controller APIs. The source can be from vendor or SDC, etc.
- Should make decision on whether L2, L3 or L2&L3 VXLANs are required for R1.
The slides used in the meeting: volte-overlay-dist.pptx
July 28, 2017 VoLTE Use Case Status Update
We reviewed the following topics during the meeting, and the details are in the attached slides:
1) The use case current status
2) The blocking issues raised during virtual developer event, see July Virtual Developers Event Blockers
3) The next steps
4) Testing strategy for VoLTE use case. One comment was g-vnfm driver from VFC can be used as base for developing mock vnfm driver.
The slides used in the meeting: VoLTE Use Case Status Update 07-28-2017.pdf. Recording: Status update and testing strategy 07-28-2017.mp4
August 4, 2017 VoLTE TOSCA Template and Network Service Discussion
We reviewed the following topics and some details are in the attached slides:
1) Reviewed the latest SDC and SO plans to support VoLTE
2) Looked into VoLTE TOSCA template example from Open-O, with focus on Network Service template
3) Proposed an approach for Virtual Link implementation in WAN scenario
The slides used in the meeting: VoLTE TOSCA Template and Network Service.pdf
August 7, 2017 Discussion of Two Blocking Issues Raised by DCAE Team
Two issues regarding ONAP service url registration and discovery were raised by DCAE, see B26 and B27 on July Virtual Developers Event Blockers.
Through the discussion it became clear how the parameters are passed to DCAE when ONAP components are installed by HEAT as VMs. When ONAP components are deployed as containers directly by OOM through Kubernetes, further discussion is needed with OOM team.
Here is the meeting recordings: Meeting with DCAE Team on Two Blocking Issues.mp4
August 15, 2017 VoLTE Draft Test Cases Review
We reviewed the draft of VoLTE Test Cases. Here is the recording: VoLTE Draft Test Cases Review.mp4
September 6, 2017 A&AI Portal App Demo
Arul Nambi gave a demo of A&AI portal app. The new portal app visualizes the nodes and connections between nodes. The meeting recording is here: A&AI Portal App Demo.mp4
September 27, 2017 VoLTE Service Creation
David gave a demo of VoLTE Service Creation in Paris F2F conference. VoLTE Service Creation Demo.mp4