...
Use Case | Lab | Responsible | Status | Video URL | Use Case Details Testing Status | Quick Notes | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
1 | vFW / vDNS | Intel / Windriver | Complete | vFW closed loop worked with instantiation from GUI (SDC/VID). Based on new closed loop for scale out (see test number 8), the old vLB/vDNS use case is onboard and instantiate regression only, which worked successfully. | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
2 | vCPE Integration Test Case | Intel / Windriver | Complete | VNF onboarding and service creation passed Service distribution passed Infra instantiation passed customer instantiation passed ONSET event generated by DCAE Policy send restart request to APPC APPC send restart stop/start request to Openstack .Test cases are complete. Closed loop vGMUX restart failed due to server | System Jira | serverId | 4733707d-2057-3a0f-ae5e-4fd8aff50176 | key | APPC-1371and vGMUX restarted | BRG tap-0 and tap-1 ports stay up for a minute before going down. Asking Intel team to look at the VNFs. Resolved after a meeting with Eric and documented the solution on use case wiki.
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
3 | vCPE with TOSCA VNF Test Case | CMCC | Completed | ONAP installation and hearth check: 100% VNF onboarding and service design passed service distribution passed service instantiation passed service termination passed | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
4 | 5G - Real Time PM and High Volume Stream Data Collection - Integration Test Status | TLab | Completed | TLAB unavailable so using SB-05 instead. 24.01.2019 r: Unable to test due to issues with pods for example dmaap-message-router and 56 another ones Comment from Yang: Marcin Przybysz Can you try again on SB-00? Now all dmaap pods are up on SB-00. | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
5 | 5G - PNF PnP - Integration Test Status | TLab | Completed | TLAB unavailable so using SB-05 instead. 24.01.2019 r: Unable to test due to issues with pods for example dmaap-message-router and 56 another ones root@oom-rancher:~# kubectl get pods -n onap | grep message 26.01.2019r. We observed an issue in PRH and reported a bug
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
6 | 5G - Bulk PM - Test Status | Intel / Windriver | Completed | TLAB unavailable so using SB-05 instead. | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
7 | 5G - OOF and PCI - Integration Test Cases | Intel / Windriver | Completed | Only OOF module was part of intergration testing (using Windriver Lab). Rest of use case was implemented as PoC only in Rutgers Winlab ONAP Wireless Lab (OWL) | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
8 | Scale Out - Integration Test Cases and Status | Intel / Windriver | Completed | Tested manual scale out with SDNC and automated scale out with APPC and guard policies. No issues reported.
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
9 | CCVPN Integration Test Cases | CMCC | 94%Completed | Two set of ONAP installation and hearth check: 100% Resource onboarding and Service Design: 100% service distribution: 100%(SOTNVPNInfraService SDWANVPNInfraService and SDWANVPNInfraService WanConnectionService distribution passed, but site service distribution error) Topology discovery: 100% SOTN Link Management: 100% SOTNVPNInfraService create: 100% SDWANVPNInfraService:100% SDWAN service create: 100% SiteService create: 100% WanConnectionService create: 100% Close loop: 50%100% | Site service Model parse error.
SDC-1955 have been verified and now it can parse site service correctly. Updated the new SO version and retesting. | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
10 | vFW/vDNS HPA Testing(Test Plan 1 inHPA & Cloud Agnostic Intent - R3 Test Plan) | Intel / Windriver | Completed |
|
| ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
11 | Change Management - Flexible Designer & Orchestrator | Intel / Windriver | Completed | Tested designer/orchestrator end-to-end on 1.3.5 Release with SO catalog-db-adapter being on 1.3.6. Successfully tested the end-to-end functionality – activities distribution from SO to SDC, workflow creation and distribution to SO, and workflow execution in SO. For SO activities only the A&AI-interfacing activities were functionally tested during workflow execution, since no suitable VNFs were available for testing APP-C-related ones, but used APP-C-related activities to create valid workflows. | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
12 | Change Management - Traffic Management- | Intel / Windriver | Work in progressCompleted | Need to onboard dedicated version of vFW for Distribute Traffic 80%: 100% APPC-CDT 0%Configuration: 100% Ansible server must be configured also 0%: 100% Test DistributeTraffic LCM and check traffic: 100% | Test on SB-00. So far tests are blocked and vFW DT service instance cannot be created.
. Service model cannot be distributed. No artifact are being distributed - in consequence service model is invisible in VID. Comment from Yang: I just tested model distribution on SB-05, it works. So please use SB-05 to test. SB-00 fails model distribution, but SDC health check passes and SDC DMAAP shows up, so please create a JIRA on SDC project. Test is completed on SB-05 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
13 | Intel / Windriver | Completed | LCM:upgrade-pre-check test: 100% LCM:upgrade-software test: 100% LCM:upgrade-post-check test: 100% | Comment from Yaoguang: due to VPN issues to Windriver lab, these tests were done at Huawei local lab. Note that only SDNC/CCSDK and the external controller/PNF impact the UC in R3. | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
14 | Change Management - Schedule optimization | Intel / Windriver | Completed | Functional testing completed by Jerry. |
...