...
Projects Name | OOM | Notes | ||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Health Check | PASS | pass sdc windriver lab | ||||||||||||||
CLAMP ↔ DCAE BLOCKED | PASS |
3 loop templates have been deployed successfully
| ||||||||||||||
CLAMP ↔ Policy | BLOCKED |
Waiting JORGE answer about that issue | ||||||||||||||
DCAE deployment issue encountered (FIXED):
| ||||||||||||||||
CLAMP ↔ Policy | PASS |
| ||||||||||||||
CLAMP ↔ SDC | PASS | Tested on SDC windriver lab in CLAMP tenant (node 10.12.6.10) Distribution from CLAMP to SDC - PASSED | ||||||||||||||
CLAMP → AAF | PASS | Login with the P12 certificate, all rights are well present - PASSED Bug detected when trying to login with AAF credentials instead of the X509 certificate (FIXED)
| ||||||||||||||
CLAMP ↔ CDSBLOCKED | PASS | Tested on Windriver, lab in clamp tenant (node 10.12.16.10) When a "onap.policies.controlloop.operational.common.Drools" or "onap.policies.controlloop.operational.common.Apex" is inserted to the loop, the list of payloads for policy was well provisionned by the CDS Call - PASSED |