...
Project Name | OOM | Notes | |
---|---|---|---|
Health Check | Passed | Based on gating jobs on OOM (as of 03/24) | |
Data flows for all use case | VES data reception (VNF to VES simulated) | Passed | VES-Flows_PairwiseTest_Logs.txt |
VES ↔ TCA , via DMaaP | Passed | (results captured on log above) | |
TCA ↔ Policy, via DMaaP | Passed | (results captured on log above) | |
DCAE (TCA) ↔ AAI, via API | NA | NpteNote: To be validated part of integration test | |
DCAE (VES) ↔ Holmes (track metrics data), via DMaaP | NA | NpteNote: To be validated part of integration test | |
VES → TCA-gen2 | Passed | (results captured on log above) | |
TCA-gen2→ Policy via DMaaP | Passed | (results captured on log above) | |
Control flow for supporting CLAMP | DCAE↔ CLAMP (CLAMP trigger blueprint deployment) , via DCAE Deployment Handler API | Pending Integration team supportPassed | 0401-CLAMP-deploy_undeploy.txt |
SDC↔ DCAE (blueprint distribution from SDC to DCAE Service Change Handler) | Pending Integration team supportPassed | Validated in SB01 | |
DCAE (Policy Handler) ↔ Policy, via API Retrieval | Passed | ||
Policy → DCAE (Policy Handler), via API | Passed | 0402-Policy-UpdateFlow.txt |
ONAP Bootstrapped services (non-usecase specific) | |||||||||
---|---|---|---|---|---|---|---|---|---|
PNF Reg Flows | VES ↔ PRH, via DMaaP | Passed |
| ||||||
PRH ↔ AAI, via API | Passed | logs in the file above | |||||||
PRH ↔ SO, via DMaapDMaaP Note: Scope of this test is to validate DMaap notification/structure (E2E PNF registration flow to be verified during integration phase) | N/A | ||||||||
HV-VES | WTP:GPB message ↔ HV-VES (tcp/socket) | Passed |
| ||||||
HV-VES ↔ DMAAP/kafka | Passed | logs in the file above |