Project Name | Enter the name of the project |
---|---|
Target Release Name | Dublin Release |
Project Lifecycle State | Incubation. Refer to ONAP Charter, section 3.3 Project Lifecycle for further information |
Participating Company | AT&T, Tech Mahindra, Ericsson, Orange, IBM |
...
- Upgrade of ODL to Fluorine SR2 (CCSDK dependency)
- Platform Maturity (i.e., S3P items) https://wikilf-onap.onapatlassian.orgnet/wiki/display/DW/Dublin+Release+Platform+Maturity
- Green color → Target level ( details see Platform Maturity below)
- Performance: Level 1, Level 2 (Stretch)
- Level 1: baseline performance criteria identified and measured (such as response time, transaction/message rate, latency, footprint, etc. to be defined on per component)
- Level 2: performance improvement plan created
- unzip feature.zip during building docker.
- Remove un-used bundles from CCSDK’s odlsli - depends on CCSDK
- Stability: Level 1 (remain test coverage 50%)
- Level 1: 72 hour component-level soak test (random test transactions with 80% code coverage; steady load)
- Level 2: 72 hour platform-level soak test (random test transactions with 80% code coverage; steady load)
- Configuration Enhancement https://wikilf-onap.onapatlassian.orgnet/wiki/display/DW/APPC+Configuration+Enhancement - Stretch goal
- Resiliency: Level 2
- Level 2: support automated failure detection & rerouting
- within a single geographic site
- stateless components: establish baseline measure of failed requests for a component failure within a site
- stateful components: establish baseline of data loss for a component failure within a site
- OOM: move to variable for database’s user/password
- CSIT OOM - Integration team
- Level 2: support automated failure detection & rerouting
- Security: Level 1, level 2 (Stretch)
- Level 1: CII Passing badge
- Including no critical and high known vulnerabilities > 60 days old
- Level 2: CII Silver badge, plus:
- All internal/external system communications shall be able to be encrypted: there is http internal connection between CDT and APPC, we need to find the resource to migrate from http to https.
- All internal/external service calls shall have common role-based access control and authorization using CADI framework.
- Level 1: CII Passing badge
- Scalability: Level 1
- Level 1: supports single site horizontal scale out and scale in, independent of other component
- APPC does not support dynamic cluster configuration in k8s only support static cluster configuration
- Clustering env with downstream: netconf, ansible
- Using Alpine linux distribution docker image as base.
- Manageability: Level1, Level 2 (Stretch)
- Level 2:
- A component can be independently upgraded without impacting operation interacting components
- Component configuration to be externalized in a common fashion across ONAP projects
All application logging to adhere to ONAP Application Logging Specification v1.2Implement guidelines for a minimal container footprint - See this presentation and follow the Container Image Minimization Guidelines
- Level 2:
- Usability: Level 1
- Level 1:
- User guide created
- Deployment documentation
- API documentation
- Adherence to coding guidelines
- Level 1:
...
Sub-components are repositories and are consolidated in a single centralized place. Edit the Release Components name for your project in the centralized page.
...
Indicate where your project fit within the ONAP Archiecture diagram Dublin+Architecture.
Block and sequence diagrams showing relation within the project as well as relation with external components are expected.
...
Platform Maturity
Refering to to CII Badging Security Program and Platform Maturity Requirements S3P, fill out the table below by indicating the actual level , the targeted level for the current release and the evidences on how you plan to achieve the targeted level.
Area | Actual Level | Targeted Level for current Release | How, Evidences | Comments | ||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Performance | 0 | 1 2 - Stretch goal |
| |||||||||||
Stability | 1 - project team 2 - Integration team | 1 - project team but we may not reach 80% code coverage 2 - Integration team Assume Integration team will address Level 2 - 72 hour test in Dublin | *current (1/13/19) code coverage is 67.9%
| |||||||||||
Resiliency | 2 | 2 | ||||||||||||
Security | 1 | 1, 2 (partial, please see the comments) | there is http internal connection between CDT and APPC, we need to find the resource to migrate from http to https. | |||||||||||
Scalability | 1 | 1 | ||||||||||||
Manageability | 1 | 1, 2(partial, please see the comments, APPC will comply two items on level 2) |
| |||||||||||
Usability | 1 | 1 | Recommendation for Casablanca is Level 2; however, we cannot meeting Level 2 All new API’s must adhere to the ONAP API Common Versioning Strategy and Documentation Guidelines; - There was an issue with ODL & API version - need to investigate further |
...
List the API this project is expecting from other projects.
Prior to Release Planning review, Team Leads must agreed on the date by which the API will be fully defined. The API Delivery date must not be later than the release API Freeze date.
Prior to the delivery date, it is a good practice to organize an API review with the API consumers.
...
API Description | API Definition Date | API Delivery date | API Definition link (i.e.swagger) | |
---|---|---|---|---|
SDC | REST API | Currently Available | TBD | |
AAI | REST API | Currently Available | TBD | |
CCSDK | OpenDayLight, SLI, AAI Client, dblib | End of March | TBD | |
DMaaP | API to publish/subscribe to events sent for VNF/VM action requests. | Currently Available | TBD | DMaaP API |
AAF | Application Authorization Framework | Currently Available | Currently Available |
...
Risk identified | Mitigation Plan | Contingency Plan |
---|---|---|
ODL upgrade to Fluorine - depends on CCSDK projects | Fall back to Nitrogen |
Resources
Fill out the Resources Committed to the Release centralized page.
Release Milestone
...