Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

The page is intended to summarize all the requirements for Dublin Release.

...

The Release Scope was finalized during the M1 Release Planning milestone at the TSC on January 31st.


The Requirements extracted from SP lists of priorities for Dublin are covered either by the Use Case, the functional requirements, the non functional requirement or within a project scope of work.

...

  • Green: The functional requirement will be fully implemented and tested
  • Yellow:  The functional requirement will be partially implemented. It is possible to identify capabilities for this functional requirement that can be tested (phasing approach).
  • Red: The functional requirement can not be partially delivered, min. requirements can not be met in order to define a testing strategy

...

M3 checklist for Consistent ID of a Cloud Region

...

APPC(TO, code already exists),

SDN-C: test support only

...

SO: Support testing effort, changes are likely in.

VFC:Committed

UUI:Committed

VID: Committed based on ATT resources

...

AT&T

China Mobile

...

Status
colourGreen

...

Y

...

M3 Gate (Dublin HPA)

...

Pending code review and integration

<please provide gerrits awaiting review>

...

AAI: TO

SO: Code Hardening, Expansion of use-case support, testing

...

Intel

ARM(???)

...

Status
colourGreen

...

Status
colourGreen

M3 Gate (Dublin Scaling)

...

Status
colourGreen
titleGreen

...

CLAMP: Committed (Based on TechM resource commitment)

Policy: Committed (Based on TechM Resource Commitment)

...

Status
colourGreen

...

Y

Status
colourGreen

M3 Gate for "K8S based Cloud Region Support"

...

Status
colourGreen
titleGreen

Code delivered in SDC, SO and MultiCloud. Pending Integration.

...

...

SDC & SO: Committed based on Intel/VMWare contribution

AAI: Partially committed

...

AAI: assuming schema/model changes only contributed by community. Also depends on AAI modelling SME availability

...

SO (AT&T) and VID

(Nokia) Testing confirmed by CM Team (AT&T)

...

Y

...

VID functionality completed; SO blocked by SDC issue in deploying workflow into SO

<if feature not complete already - move to OUTPLAN>

...

...

SO (C),

VID (C)

...

SO: Committed (AT&T)

VID: pending final decision from Nokia (stretch goal)

...

AT&T

Nokia

2

...

Status
colourGreen

Testing confirmed by Orange and AT&T

...

Traffic Distribution

APPC Dublin M3 Deliverables for API Freeze Milestone Checklist Template

...

Functionality completed; Working on code coverage; code is yet to be merged;The portion of code in APPC has been merged.

<if feature not complete already - move to OUTPLAN>

...

...

APPC (C),

OOF (C),

A&AI (TO)

...

APPC: Committed (Orange)

OOF: Committed (Orange)

...

Orange

...

Status
colourGreen

Testing confirmed by AT&T

...

New CMSO APIs in Dublin

...

Feature completed; working on code coverage

...

...

OOF (C),

Policy (TO)

...

Status
colourGreen

Testing confirmed by AT&T

...

Y

...

...

Status
colourGreen
titleGreen

...

...

Model driven Control Loop Design

...

DCAE: AT&T Committed

CLAMP: Committed

Policy: Committed

...

AT&T commits to finding the required resources

...

SO Only

Testing confirmed by SO Team

Y

...

...

SO, SDC, VFC, APPC, SDNC

https://wiki.onap.org/download/attachments/45293323/2018-12%20Virt%20F2F%20-%20%20Dublin%20Architecture%20Requirements-pa3.pptx?version=1&modificationDate=1544650581000&api=v2

https://jira.onap.org/browse/CCSDK-575

...

SDC: Not committed

APPC: Not committed

SO: Committed based on the code from R3

SDNC: Not committed

VFC: Partially committed

...

SDC: no resources, not enough info

APPC: no resources

SDNC: no resources

VFC: optimize DB microservice

CDS project will provide Resource assignment functionality

...

ETSI Alignment

SOOL003 plug-in to SO

Ericsson confirmed the integration testing resource for the ETSI SOL003-plugin support

...

Y

...

Status
colourGreen
titleGreen

Code delivered in SO and A&AI; working on VNFM Simulator for integration testing

...

ETSI Alignment

SO plugin to support SOL003 to connect to an external VNFM

...

...

SDC: Partially committed (based on Ericsson contribution)

SO: Committed (SOL003) based on contribution from Nokia and Ericsson

AAI: Not Committed

SDC: no resources

.AAI: no resources (detailed impact to be discussed) Action Byuong

...

Architecture did not approve

...

...

...

...

Prabhu Balan – (prabhu.balan1@vodafone.com) from Vodafone.

...

...

Y

...

...

 SDC

CLI/VNFSDK

...

Vodafone, iconectiv, huawei


(star) T-Shirt Size: Ballpark estimation for assessing the development/testing activities performed by the project team; not the integration team

...

  • Green: The non-functional requirement will be fully implemented and tested
  • Yellow: The non-functional requirement will be partially implemented. It is possible to identify capabilities for this non-functional requirement can be tested (phasing approach).
  • Red: The non-functional requirement can not be partially delivered, min. requirements can not be met in order to define a testing strategy

...

TSC M1

Approval

...

...


...

(star)

...

  1. Support TOSCA network constructs
  2. Single click instantiation (Using VID)

Y

...

Status
colourGreen

...

Status
colourGreen

End 2 End tests to start

...

...

SO
SDC
CCSDK
OOM
Testsuite
Documentation

...

Jira Legacy
serverSystem Jira
columnskey,summary,type,created,updated,due,assignee,reporter,priority,status,resolution
serverId4733707d-2057-3a0f-ae5e-4fd8aff50176
keyTSC-53

https://wiki.onap.org/download/attachments/48529726/ONAP-E2E-Automation-v3.pptx?api=v2

...

Code:
SO
SDC
CCSDK
OOM
Testsuite

APPC (CDS)

TO:
AAI
DMaaP
Policy

SDC:
TechM (C)
IBM (C)

CCSDK:
ATT (C)
Bell   (C)
IBM (C)
Ericsson (C)
TechM (C)

SO:
Ericsson (C)
Bell (C)
ATT (P)

OOM:
Orange (P)
Bell (C)

...

T

...

Documentation:
Orange (C)
Bell (C)
Dutch T (C)

AAI: TO

...

AT&T
Bell Canada
Ericsson
Huawei
IBM
Orange
Tech Mahindra

...

Container optimization : on –going (eg SDNC)

Testing Strategy

https://lists.onap.org/g/onap-tsc/message/4605

...

Status
colourGreen

Reduction effort between Casablanca and Dublin

Some old images to be renewed

CIA team will endorse SDC

Optimized Docker excpected to be ready for RC0

...

Status
colourGreen

...

S3P - Footprint Optimization (Integration with Alpine)

Alpine is the target, but possibility to use oother based OS (cf TSC 2019-02-28)

...

...

-

...

CIA Dublin Release Planning

Documentation by PTL no more useful: the wiki page will provide weekly information:

Effort also required to avoid old images, cf JIRA tickets

Jira Legacy
serverSystem Jira
columnskey,summary,type,created,updated,due,assignee,reporter,priority,status,resolution
maximumIssues20
jqlQuerykey in ()
serverId4733707d-2057-3a0f-ae5e-4fd8aff50176

...

SDC: N

CCSDK, CLAMP: Committed

Multi-VIM/loud: committed

Policy: committed

DCAE: Not committed

SDC: no resources

DCAE: Resource constraint

...

Orange

OAM

Amdocs

+ PTL

...

Component/memory optimization: Ongoing Assessment

Testing Strategy

https://lists.onap.org/g/onap-tsc/message/4605

...

Global effort to optimize resources for small installation

Capabilities to configure JAVA_OPTS for Java based images

...

Status
colourGreen

The ONAP Minimal Deployment target OK.

Some attention required for AAI

...

...

https://wiki.onap.org/download/attachments/45293323/Dublin-Footprint-Optimizations.pdf?version=1&modificationDate=1544543600000&api=v2

CIA Dublin Release Planning

Checklist and wiki to be published.

...

SDC: N

CCSDK, CLAMP: Committed

Multi-VIM/loud: committed

Policy: committed

DCAE: Not committed

SDC: no resources

DCAE: Resource constraint

...

Orange

OAM

Amdocs

...

Global optimization (e.g. shared DB) - stretch goal=shared PostgreSQL; shared MariaDB

Testing Strategy

https://lists.onap.org/g/onap-tsc/message/4605

...

Shared DB instance creation on-going

First integration with ONAP component on-going

...

Status
colourYellow
titleYELLOW

Code OK for Mariadb-galera cluster and Cassandra cluster

A&AI Integrated with Shared Cassandra. SDC has been tested but in discussion with PTL on merging into release.

SDNC and SO (in test - awaiting PTL approval) with mariadb-galera.

...

...

https://wiki.onap.org/download/attachments/45293323/Dublin-Footprint-Optimizations.pdf?version=1&modificationDate=1544543600000&api=v2

CIA Dublin Release Planning

First component using Shared DB: AAI using Cassandra

List of JIRA tickets

Jira Legacy
serverSystem Jira
jqlQuerytext ~ "sharing"
serverId4733707d-2057-3a0f-ae5e-4fd8aff50176

...

SDC: N

CCSDK, CLAMP: Committed

Multi-VIM/loud: committed

Policy: committed

DCAE: Not committed

SDC: no resources

DCAE: Resource constraint

...

Yes with limited scope: Manual PH1

...

Healthcheck gate is operational

...

Status
colourGreen

Infrastructure up , per commit triage working well- thank you Orange 

...

TSC Task Force:

Michael O'Brien

Jessica Gonzalez

Bengt Thuree (Unlicensed)

Sylvain Desbureaux

Morgan Richomme

Mike Elliott

Gary Wu

OOM + Integration

(Infrastructure)

Jira Legacy
serverSystem Jira
columnskey,summary,type,created,updated,due,assignee,reporter,priority,status,resolution
serverId4733707d-2057-3a0f-ae5e-4fd8aff50176
keyTSC-25

...

Jira Legacy
serverSystem Jira
serverId4733707d-2057-3a0f-ae5e-4fd8aff50176
keyLOG-310

...

Integration

Logging

OOM

+ ALL (helm charts)

...

no except devops/scripts

in

oom/integration

...

OOM:

Linux Foundation (C)

Orange (C)

Bell (C)

Amdocs (C)

Logging:

Bell (C)

Amdocs (C)

Integration:

...

Amdocs

Orange

Linux Foundation

Bell

Huawei

...

Status
colourGreen

...

...

Status
colourGreen

Security Checklists integrated to the Release Milestone templates

Yes

...

Status
colourYellow
titleYELLOW

Yellow

  • Vulnerability Review Tables not complete for some projects
  • Some projects missing answers for CII Passing badge

...

https://wiki.onap.org/download/attachments/45293323/2018-12%20Virt%20F2F%20-%20%20Dublin%20Security%20-%20Requirements-pa2.pptx?version=1&modificationDate=1544453068000&api=v2

...

De-scoped from Dublin - TSC decision on 2/21

...

Status
colourGreen

...

Status
colourGreen

In progress:

Jira Legacy
serverSystem Jira
serverId4733707d-2057-3a0f-ae5e-4fd8aff50176
keyOOM-1240

...

Transfer for A&AI targeted for April 18th,2019. Once successful, will transfer:

  • policy
  • aaa
  • appc
  • dcae (awaiting review of documented process before proceeding - see below)

OOM - Development workflow after code transfer to tech teams

...

...

No enforcement to make it happen for all project in Dublin release, but expectation to to completed within El Alto release. This could potentially be a S3P items.

...

Status
colourGreen

...

Security Subcommittee

Yang Xu

...

AAI, DCAE, DMaaP, Holmes, Logging, Modeling, MSB, Multi-Cloud, ONAP CLI, UUI, Policy, Portal, SO, VFC, VNFSDK, AAF,CLAMP, MUSIC: Already Integrated

ExtApi, VID: Committed

SDC: Not Committed

CCSDK/SDNC, OOM, APPC, OOM: No

CCSDK/SDNC, APPC: dependency on ODL

OOF (HAS, OSDF): python, not Java

SDC: No resource

OOM: No java code

...

Reviewed on 2/14 with the Integration Team

Final presentation to the PTLs on 2/19

Yes

...

Some teams raising requests/risks to get help achieving this by M4.

...

Status
colourRed
titleRed

Lack of people

See Risks

...

Integration Team

Morgan Richomme

ChrisC

cl664y@att.com

...

View file
nameDev Testing_Enhancement for Dublin.pptx
height250

...

See Dublin Release Platform Maturity

...

OOF is running in multiple geos. Portal also using MUSIC. SDC & Policy will be in next release.

...

...

OOM (introduction of CNI)/MUSIC capabilities leveraged by initial ONAP Components i.e. OOF, Portal, SDC

...

Status
colourGreen

...

Yes

...

Jira Legacy
serverSystem Jira
columnskey,summary,type,created,updated,due,assignee,reporter,priority,status,resolution
serverId4733707d-2057-3a0f-ae5e-4fd8aff50176
keySDC-1980

...

Jira Legacy
serverSystem Jira
columnskey,summary,type,created,updated,due,assignee,reporter,priority,status,resolution
serverId4733707d-2057-3a0f-ae5e-4fd8aff50176
keyVNFSDK-342

...

Testing confirmed by Nokia - Przybysz, Marcin

...

Yes

...

ONLY DCAE component. No other projects securing the xNF comms.

...

xNF communication security enhancements.

...

...

Slide presented on PTL Call (1/14/2019)

DCAEGEN2-1101 - DCAE enhancements to support certificate authentication for HTTPS.  All HTTPS connections from xNFs go to DCAE so no other projects need to be updated.

DCAEGEN2-978 - DCAE replaces clear text password with hash.

DCAE - Committed based on Nokia's contribution

...

see yellow/red in

Image Removed

in progress

log, aaf cli, consul, contrib, dcae, dmaap, nbi, oof, sdnc, so, uui, vid, vnfsdk, vvp

good

aai, appc, clamp, esr, multicloud, policy, pomba, portal, sdc, vfc

...

Library: In progress portal/sdk and possible so library adjustment

Jira Legacy
serverSystem Jira
serverId4733707d-2057-3a0f-ae5e-4fd8aff50176
keyPORTAL-348

Infrastructure: dmaap is adding containers, need to work with other teams in red

Jira Legacy
serverSystem Jira
serverId4733707d-2057-3a0f-ae5e-4fd8aff50176
keyDMAAP-853

as part of overall

Jira Legacy
serverSystem Jira
serverId4733707d-2057-3a0f-ae5e-4fd8aff50176
keyLOG-487

...

Log

OOM

Portal

SO

AAI

...

OOM (c)

LOG (c)

Portal (c)

SO (c)

AAI (c)

Multicloud(c)

LOG/POMBA

OOM

Amdocs

AT&T

Bell

Hauwei

Intel

...

No particular Integration Testing required.

Portal/UUI Teams will provide the testing resources

...

Implementation complete - test phase

...

...

Code:
PORTAL, UsecaseUI

...

Development Stretch Goal for Dublin. No particular Integration Testing required. Portal container at RC0 will be the final version to be tested

...

Implementation and documentation of the Angular upgrade that is scoped in Dublin is complete. Further, new screen changes are being planned to E release (as the Angular upgrade is a huge XL sized effort)

...

...

Jira Legacy
serverSystem Jira
serverId4733707d-2057-3a0f-ae5e-4fd8aff50176
keyPORTAL-345

Jira Legacy
serverSystem Jira
serverId4733707d-2057-3a0f-ae5e-4fd8aff50176
keyPORTAL-330

...

Code:

PORTAL

TO:

Policy, VID

...

(star) T-Shirt Size: Ballpark estimation for assessing the development/testing activities performed by the project team; not the integration team

...

POC Definition - (In Progress)

...

Self Serve Control Loop (Closed Loop Subcommittee)

...

...

Model driven Control Loop Design

This is a stretch goal for Dublin.  We are still trying to align resources so that this can be accomplished this release

...

DCAE: Stretch Goal

Policy: Stretch Goal

SDC: Stretch Goal

...

Status
colourRed
titleRed

Due to Resource Constraint this will be pushed to the next feature release

...

https://wiki.onap.org/download/attachments/45293323/2018-12%20Virt%20F2F%20-%20%20Dublin%20Architecture%20Requirements-pa3.pptx?version=1&modificationDate=1544650581000&api=v2

...

OOF: Committed

MultiVIM/Cloud: Committed

End-to-end Use Case Integration: Stretch Goal (due to several workflow changes)

IBM, AT&T, VMware (Architecture/Modelling), Intel (Architecture),

...

...

https://wiki.onap.org/display/DW/2019+Silicon+Valley+Meeting+Proposals?preview=/53248195/60889728/DataLake-Architecture-implementation.pptx 

...

Status
colourRed
titleRED

Software is still under development.

...

CI/CD

Magic word "run-helm-deploy" in queue at LF, Orange and Log team

Move to POC

...

OOM + Integration

(Infrastructure)

...

Amdocs

Orange

Linux Foundation

Bell

Huawei

...

...

-Healthcheck

-vFW

...

Progress stalled - Global - jjb is a higher priority.

...

SO plugin to support SOL005 to connect to an external NFVO

...

...

https://wiki.onap.org/pages/viewpage.action?pageId=58229331

https://wiki.onap.org/download/attachments/45293323/2018-12%20Virt%20F2F%20-%20%20Dublin%20Architecture%20Requirements-pa3.pptx?version=1&modificationDate=1544650581000&api=v2

Functional Requirements

...

Distributed Analytics as a Service (Dublin Summary) - Edge Automation

Dileep Ranganathan

Ramki Krishnan

...

Demo

...

Day-2 Config  and Visualization package is pending.

...

S3P - Provide Upgrade Capabilities PH1

...

...

OOM supported by A&AI, SO, SDC and SDNCWaiting for inputs

...



(star)T-Shirt Size: Ballpark estimation for assessing the development/testing activities performed by the project team; not the integration team

...