Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.
Comment: Reverted from v. 5

Date

Attendees

DISCUSSION ITEMS LOG


CtgryItemWhoNotes
Meeting Notes Discussion

Discussion Notes from  

All Team members

Pltfm


PLATFORM TOPICS:

Controller to NF Association

See Slides Nov 6, 2018. Development of Controller to NF assignment association S/W.

CDS, VF-C, APP-C, SDN-R, SDN-C; will the CCSDK "merging" of controllers happen in R6?

USE CASE REALIZATION MEETING (Notes 2018-11-6) Ctrl-NF

Use Case

PLATFORM TOPICS:

Data Persistency, RunTime DB

RunTime Config DB is now a R6 use case :

USE CASE REALIZATION MEETING (Notes 2019-01-30) U/C Cross-Interaction, Persistency

5G CONFIGURATION (RunTime DB)CONFIGURATION PERSISTENCE SERVICE R6

Jan 22 - CMNotify; SA5 3GPP Meeting. CMNotify domain. VES Event spec 7.1.1. Alok Gupta has not updated the VES event. On a leave of absence (Hip surgery). CMNotify is going to be done by Nokia. Sync with Sandeep Shah

Pltfm

PLATFORM TOPICS:

Controller LCM API Evolution

https://wiki.onap.org/download/attachments/50202249/2019-04-09%20ONAP_LCM_API_Evolution_El_Alto.pptx?api=v2

Goals (Architecture Evolution)
  • Target is common LCM API in CCSDK usable by different controller personas to simplify for both clients and controller implementations
  • Support PNFs for applicable LCM operations in a consistent way
  • Enable use of CDS blueprint processor to customize behavior of LCM operations in the 'self-service' category
    • In ONAP R4, CDS can be used for pre/post-instantiation configuration. Generic and model-driven design should allow CDS usage to be extended for additional operations and use cases.
  • Evolution steps that preserve backwards compatibility for clients

Present at the Arch S/C Apr 9 (Tue) second presentation.

Use Cases

USE CASE/5G:

RAN (ORAN-3GPP) Standards Harmonization with ONAP

  • Orchestration at the Edge.
  • A1/O1/E2 communications. Edge to ENBs, Telemetry.
  • E2 will not have this info. O1 is I/F for PM counts. Not a management I/F.
  • WG3 (ORAN) is defining this.
  • ONAP w/ O1. Changes w/ O1 interface.
  • How to satisfy A1/O1 and in what time-frame.
  • U/C ORAN - ONAP harmonization. 3GPP ORAN ONAP.
  • Starting a new U/C in 5G. Marge, Vimal, Fred Feisullin
  • Edge inventory & topology. Transport BH consideration w/ real-time near-RT aspects
  • Akraino. MEC. Edge automation (Ramki).

Use Case WIKI: MOBILITY STANDARDS HARMONIZATION WITH ONAP

Use Cases

USE CASE/5G:

Licensing Management

New U/C added to the 5G Use Cases Wiki: LICENSING MANAGEMENT

(Oct 8 2019) Arch Samuli presented on Licensing Management.

Modeling work: ONAP R6 Modeling High Level Requirements

Kevin Skaggs Proposed Licensing Platform Model

Use Cases

USE CASE/5G:

OOF / SON / PCI

PoC for December 2019? SDN-R south-bound NetConf I/F w/ model

and also integration with Runtime DB work.

Use Cases

USE CASES:

BBS U/C Evolution

BBS Evolution - Slide set linked in R6 proposed U/C. List of proposals & functional requirements.

  1. Change Service - want to use ONAP platform.
  2. Full Closed Loop for Fault Management - CLAMP.
  3. Service Update API (SO) - will be developed

https://wikilf-onap.onapatlassian.orgnet/wiki/download/attachments/6088750416362101/BBS_R5_v1.pptx?version=1&modificationDate=1554180715000&api=v2

Use Cases

USE CASES/5G:

PM Dictionary/FM MD GUI

FM META DATA & PM DICTIONARY in R5
Use Cases

USE CASES/5G:

PNF S/W Upgrade

PNF software upgrade in R6 Frankfurt
Use Cases

USE CASES/5G:

Preonboarding/Onboarding

PNF PREONBOARDING / ONBOARDING in R5

VNF-SDK Artifact package security

Use CasesUSE CASES:

IoT Service Creation

IoT Create Services on 5G

5G Use Cases in R6 Frankfurt

June 19, 2019

Use Cases

USE CASES:

Modeling gNB/5G RAN

Align & harmonize information models to ONAP model and ONAP internal information & data model:

ETSI SOL001 ... 007 with ONAP internal Model, PNFD modeling (Model S/C), 5G Model (3GPP, RAN), ORAN (WGs, RAN), Open ROADM (reconfig optical add/drop multiplexer, Optical), ONF (Optical), ISOMII (Optical), OTCC (Optical transport config & control)

Use Cases

USE CASES:

5G NRM (Network Resource Model) Configuration

wangyaoguang

June 2019 LFN DDF, titled as '5G Provisioning management service to NRM

Presentation: 5G Network Resource Model (NRM) Configuration in R6 Frankfurt

Use Cases

USE CASES:

PNF / Plug and Play

Benjamin Cheung

PNF Plug and Play

M2/ - Pending 

Jira Legacy
serverSystem Jira
columnskey,summary,type,created,updated,due,assignee,reporter,priority,status,resolution
serverId4733707d-2057-3a0f-ae5e-4fd8aff50176
keyREQ-140
- CMPv2 Security enhancements to AAF (Netconf & PM impacts also).

Arch

Architecture S/C

PNF POB/OB Flow

Arch S/C Information Flows: Draft ONAP Information Flows

New Information flow for Preonboarding/Onboarding xNF packages/resources.

ARCHCOM: InfoFlow - Onboard Resource into SDC Flow

TSC

TSC:

PoC Definition

POC definition
TSC

TSC/USE CASES:

Test Automation Progress

Use Case Test Automation

Action Items: Use case subcommittee to reach the Dublin use case owner to provide the following information. what's the current percentage of testing automation regarding your use case and functional requirements; what will be the plan to be 100% and constraints (resources availability etc.)

Release TrackingR6 Frankfurt / M2All Team Members

Use Case Tracking Template

Need the U/C teams to fill out the Dev. Impacts.

More Generalized Use Case Template (discussed w/ Model team):

Use Case Tracking Template and Use Case Template

Frankfurt Release Requirements

Demos

Plug- fest

Demo Plugfest

POC & Plugfest in End June 2020

WINLAB? A1/O1 ORAN & ONAP Joint Plugfest

Panel Discussion - ? / Maybe in January-February

Setup. Bronze Release. / Slicing, Heart Beat-Health Check


Architecture TopicsArchitecture TopicsAll Team Memebers

Architecture Component Descriptions:

ONAP Architecture Component Description - Dublin

Architecture Flows:

Dublin ONAP Information Flows

Frankfurt Release Requirements

KEY PRESENTATIONS & OVERVIEWS & RECORDINGS

List of U/C Realization calls from R6 U/C Wiki: Release 6 (Frankfurt) proposed use cases and functional requirements

DATETOPICPRESENTERDESCRIPTION
Apr 10, 2019Controller LCM API Evolution
  • Target is common LCM API in CCSDK usable by different controller personas to simplify for both clients and controller implementations
  • Support PNFs for applicable LCM operations in a consistent way
  • Enable use of CDS blueprint processor to customize behavior of LCM operations in the 'self-service' category
    • In ONAP R4, CDS can be used for pre/post-instantiation configuration. Generic and model-driven design should allow CDS usage to be extended for additional operations and use cases.
  • Evolution steps that preserve backwards compatibility for clients

https://wiki.onap.org/download/attachments/50202249/2019-04-09%20ONAP_LCM_API_Evolution_El_Alto.pptx?api=v2

May 1, 2019A&AI GraphGraph Visualizer

Visualizer for A&AI Model Layout

Use Case Realization Call: May 1, 2019

May 8, 2019A&AI Model Browser, Sparky

A&AI developer Model Browser to navigate and viewing attributes, object types & edge view

Recording & Slides: Use Case Realization Call: May 8, 2019

May 15, 2019A&AI Run Time Browser (Sparky)A&AI Run-Time Browser
May 22, 2019Edge Automation Overview & Discussion

Central & Distributed Edge ONAP configuration.

Topics include: Onboarding, Instantiation, Edge Orchestration, A&AI, Architecture, Work-flows, Multi-Tenancy

Use Case Realization Call: May 22, 2019

May 29, 2019Modeling, Use Case & Arch S/C Way of Working

Model S/C (Sub committee) contributions page: Modeling sub-committee Contributions

https://wikilf-onap.onapatlassian.orgnet/wiki/display/DW/Proposed+ONAP+Release+Process+Updates+for+Information+and+Data+Modeling

Jun 5, 2019Use Case slides for Dev. ForumUse Case Realization Call: June 5, 2019
July 10, 2019R6: PNF Software Upgrade

ONAP Read the Docs/R4 Announcements

WIKI: PNF software upgrade in R6 Frankfurt Overview & Presentation

July 24, 2019R6: OOF/SON PCI Use Case DemoNK ShankarOOF / PCI / SON Use Case  Discussion and Overview

 

5G NRM Configuration U/C Overviewwangyaoguang5G NRM (Network Resource Model) Configuration U/C Overview & Presentation

 

ORAN Standards HarmonizationORAN Standards Harmonization U/C Overview & Presentation

 

Modeling S/C guidelines & Use Case Interactions

Modeling S/C Process Wiki: Proposed ONAP Release Process Updates for Information and Data Modeling with Use Case Tracking Template and Use Case Template

R6 Modeling Req Plan wiki: ONAP R6 Modeling High Level Requirements

 

Licensing Management OverviewIntroduction of Licensing Management in R6

 

SDC & R6 Use Case Impacts DiscussionOfir SonsinoDiscussion with SDC PTL Ofir w/ the Use Case Teams and SDC commitments. See the summary Table for SDC impacting Use Cases.

 

VID & R6 U/C Discuss


ittay

Use Case Teams

Discussion with VID PTL (Ittay Stern) for R6 Use Case Impacts discussion and commitments for VID impacting Use Cases

Preparing slides for Use Cases at the Technical Conference Antwerp (for 5G/PNF use cases)

 

A&AI & R6 Use Case Impacts Discussion

Discussion with A&AI PTL (Jimmy Forsyth) and Chandra Cinthala for R6 A&AI Use Case Impacts discussion and commitments.

Use Case Realization Call: September 25, 2019

 

DCAE & R6 Use Case Impacts DiscussionVijay KumarDiscussion with DCAE PTL (Vijay Kumar) for R6 Use Case Impacts discussion and commitments for DCAE impacting Use Cases

 

M1 U/C discussionUse Case Teams

R6 M1 Deadline (Oct 10 2019)

M1 Checklist: Deliverables for Planning Milestone Checklist Template

READ THE DOCS: http://onap.readthedocs.io/en/latest/guides/onap-developer/developing/index.html  > USER GUIDES > Verified Use Cases

and discussion with A&AI (James Forsyth ) continuing discussion from Sept 25.

Network Slicing has two proposals in R6 (LIN MENG CMCC and Swaminathan Seetharaman ). Need to align the two proposals and present at Use Case S/C meeting (Alla G.) and TSC and Architecture next week Oct 14.

 

PoC Planning & DiscussionTracy Van Brakle

Combination Plugfest & PoC 1st week of December bringing together subset of ONAP modules as SMO (svc mgmt orchestration) layer w/ other artifacts from ORAN S/W (LF). LF will publicize. Planned June 2020.

Co-Demo discussion Nokia & Ericsson: Plug Fest Planning Discussion Oct 28, 2019

 

RunTime Config DB (Data Persistency)

Discussion of the RunTime DB Use Case in R6 Frankfurt which introduces a Common Service Data Layer for a data lake to store configuration and operational parameters.

Component & Flows:

ARC RunTime DB Component Description - R6 Frankfurt

ARCHCOM: InfoFlow - RunTime Config DB Information Flow5G CONFIGURATION (RunTime DB)

CONFIGURATION PERSISTENCE SERVICE R6

 

OOF & R6 Use Case Impacts DiscussionShankar PN

Discussion with OOF PTL (Shankaranarayanan Puzhavakath Narayanan ) for R6 Use Case Impacts discussion and technical details for OOF impacting Use Cases

 

SO & R6 Use Case Impacts DiscussionDiscussion with SO PTL (Seshu Kumar) for R6 Use Case Impacts discussion and commitments.

 

PoC Planning & DiscussionTracy Van BrakleSync up on the Dec 5, 2019 ORAN/ONAP PlugFest & Demo

 

Network SlicingCMCC-Huawei-Tencent & Wipro-ATT-Amdocs joint Network Slicing proposal

 

No MeetingNo Meeting

 

MDONSXin Miao (Unlicensed)Presentation and discussion of Multi-domain Optical Network Services

 

Ctlr & R6 U/C ImpactsDan Timoney

Discussion with Controller (APP-C, SDN-C) PTL (Dan Timoney) for R6 Use Case Impacts to Controller project. A technical discussion, Q&A, and U/C analysis.

Recap of ONAP/ORAN Plugfest (Dec 5)

 

 

No MeetingNo MeetingNo meeting end of December due to Holidays & Vacations

 

Use Case DiscussionUse Case TeamsM2 Discussion

 

No MeetingNo MeetingNo meeting due to Prague DDF

 

M2/M3 DiscussionUse Case TeamsM2/M3 Deadline Discussion

 

5G Service Modeling

5G RAN SERVICE MODELING & DEFINITION in R6 Frankfurt

 




 

Network Slicing Presentation & DiscussionRefined Network Slicing Presentation & Discussion
Jan or FebRelease Manager DiscussionDavid McBride

Discussion with David McBride of the Linux Foundation, the R6 Release Manager regarding practices, wiki page updates, Jira dashboard and what is a use case? Release development process moving waterfall > agile/sprint

Release Planning: Frankfurt

Frankfurt Release Requirements

x, 2020CC-SDK and E2E AutomationYuriy MalakovCC-SDK & E2E Automation
April / MayWay of Working ProcessBenjamin Cheung

Process for Modeling WoW and development with Architecture & Modeling.

Proposed ONAP Release Process Updates for Information and Data Modeling

?PNF Plug & Play w/ SOFormer user (Deleted)PNF Plug and Play SO BPMN Work-flows to Building Blocks (BB)
Jan or FebDocumentation ProjectsSofia WallinProcess ReadtheDocs
MarchDiscussion of Use Case Template for R7

Filling out, describing and creating the Wiki for a Use Case

Use Case Tracking Template and Use Case Template

Proposed Functional Template for Use Cases

March/AprilORAN Bronze Rel & ONAP Plugfest PlanningPlanning for ORAN Bronze Rel & ONAP Plugfest Planning





SUPPORTING DOCUMENTATION

DocumentFile
3GPP TS28.541 Analysis Spreadsheet

Ted Johnson Presentation

Yang Database Generation

View file
name3GPPTS28541_01Jn022020.xlsxYang Database Generation.pptx
height250




RECORDING for U/C Realization

RecordingFILE
Zoom Video & Audio (MP4)

View file
namezoom_0.mp4
height250

Audio Only (M4A)

View file
nameaudio_only.m4a
height250

Playback (M3U)

View file
nameplayback.m3u
height250

Chat (Txt)

View file
namechat.txt
height250
View file
namemeeting_saved_chat.txt
height250

...